The project will fund the planning design permitting and final plans for a port facility to replace existing infrastructure in whittier
Active Grant Awarded
- Award ID
- 693JF72640072
- Recipient
-
City Of Whittier UEI GMTFPTDD6HT5
- Awarding agency
-
Maritime Administration
Department of Transportation
- Obligated
- $5,103,160
Award facts
- Assistance listing
- 20.823 Port Infrastructure Development Program
- Completion date 2% complete
- Funding
-
- $4,074,520.00 Federal
- $1,028,640.00 Non-federal
- Place of performance
- Whittier, AK 99693, USA
Award details come from USAspending.gov.
About this award
The Department of Transportation Maritime Administration awarded Grant 693JF72640072 to City of Whittier, totaling $5.10316 million in obligated funds on November 9, 2026, under the Port Infrastructure Development Program (Assistance Listing 20.823). The award funds planning, design, permitting, and final plans for a port facility to replace existing infrastructure in Whittier, Alaska, with ultimate completion on August 28, 2029, and place of performance in Whittier, AK 99693.
The work is organized into eight elements. Project management covers establishing project controls, financial tracking and reporting systems, and coordination with MARAD funding partners and stakeholders. Existing-conditions work includes coordination meetings with the Alaska Railroad, seafood processors, Alaska Department of Transportation and Public Facilities, tribal and Native organizations, and military stakeholders, plus at least one public meeting in Whittier during design development. Data collection includes geotechnical borings, bathymetric surveys, and utility mapping. Design deliverables advance through 30 percent preliminary engineering, 60 percent intermediate design, and 90 percent advanced design, addressing dock configuration, structural systems, berthing capacity, constructability, cost, and resilience. Environmental review prepares NEPA documentation for the construction project and coordinates permitting with USACE (Sections 404 and 401), Alaska Department of Environmental Conservation, NOAA Fisheries, and SHPO, among others, including tribal consultation. The final element delivers a 100 percent plans, specifications, and estimates package.
Description
Activities to be performed element 1 project management and administration. Establish project controls financial tracking and reporting systems. Maintain coordination with marad funding partners and stakeholders. Element 2 existing conditions and stakeholder needs. Hold coordination meetings with the alaska railroad seafood processors alaska department of transportation and public facilities tribal and native organizations and military stakeholders. Provide at least one public meeting in whittier during design development. Collect stakeholder needs and requirements. Document site constraints existing utilities operational requirements and existing marine conditions. Element 3 data collection and geotechnical investigations. Conduct geotechnical borings bathymetric surveys and utility mapping. Element 4 preliminary engineering 30 percent design. Develop design alternatives for dock configuration structural systems and berthing capacity. Evaluate constructability cost implications and resilience considerations. Element 5 environmental review and permitting. Prepare nepa documentation for construction project. Initiate and coordinate with permitting agencies USACE section 404 401 alaska department of environmental conservation NOAA fisheries shpo tribal consultation etc. Element 6 intermediate design development 60 percent design. Refine preferred design alternative. Incorporate stakeholder feedback and regulatory conditions. Prepare preliminary construction phasing and cost estimates. Element 7 advanced design development 90 percent design. Finalize design drawings specifications and engineering reports. Update cost estimates and conduct value engineering review. Incorporate permit conditions and environmental mitigation measures. Element 8 final PS and E package 100 percent. Deliver complete plans specifications and estimates stamped and ready for construction procurement. Ensure compliance with state and federal design standards resilience requirements and marad guidance. Element 9 grant closeout and construction readiness completion of all deliverables to position the project for construction funding. Deliverables expected outcomes there are no performance measures assigned to this grant. Intended beneficiary city of whittier. Subrecipient activities none.
Quick answers
Who received award 693JF72640072?
693JF72640072 was awarded to City Of Whittier by Maritime Administration (Department of Transportation) on November 9, 2026.
How much is award 693JF72640072 worth?
$5,103,160 has been obligated on 693JF72640072: $4,074,520 in federal funding and $1,028,640 in non-federal funding.