Development of an ultra-high dose rate rotational linac for flash radiotherapy

Ended Project Grant Awarded Last action

Award ID
R01CA255432
Recipient
Awarding agency
Obligated
$12,525,891

Award facts

Assistance listing
93.395 Cancer Treatment Research
Completion date
Funding
  • $11,931,170.53 Federal
  • $594,720.00 Non-federal
Place of performance
San Francisco, CA 94143, USA

Award details come from USAspending.gov.

Description

Abstract
Radiotherapy is used to treat 60% of the cancer patients and 40% of curative cases. However, normal tissue toxicities still prevent radiotherapy from achieving more effective tumor control in many patients despite decades of technological development in intensity-modulated radiation therapy and image-guided radiation therapy. Ultra- high dose rate, A.K.A., flash radiotherapy has recently RE-emerged as a potential method to significantly improve the radiation biological dose conformality on top of the physical dose conformality. Although existing x- RAY linac and proton systems can be modified to deliver the flash dose rate, they are limited in either field size, depth penetration, or dose conformality to be useful for treating most human tumors. Conceptual systems such as very high energy electron and phaser will need to overcome significant and risky technological barriers to be clinically practical. In this academic-industrial partnerships project, we propose to develop a high dose rate x-RAY radiotherapy system that is a scale-up of existing technologies for clinical flash radiotherapy. There are three major technical challenges in achieving the flash dose rate with x-rays. The first is the linear accelerator that is capable to produce such a high dose rate. For this challenge, we hypothesize that a 12 MV x-RAY beam >300 GY/s uncollimated dose rate can be achieved using a combination of already-demonstrated accelerator technologies. The second challenge is the well-separated beam angles for good x-RAY dosimetry. The third challenge is intensity modulation for conformal dose distribution. The tightly correlated second and third challenges are due to the slow mechanical movement of the common c-arm gantry and the MLC leaf speed. To overcome these two challenges, we propose to develop a rotational ring-gantry flash imrt platform with many quasi-static mlcs. The fast-spinning ring-gantry system would deliver the entire treatment in an ARC within a very short time. The intensity modulation is achieved by using a decoupled MLC ring with a large number of MLC banks each pre-shaping the aperture for rotational imrt. The system would then be able to achieve highly conformal dose distribution comparable to state of the art vmat, and at the same time take advantage of the flash radiobiology. We propose the following aims: aim 1. High dose rate linac development; aim 2. Development of rotational direct aperture optimization with a decoupled (road) MLC ring; aim 3. Demonstration of rotational flash using a benchtop system.

Transactions

Action Obligated Date
Amendment $0
Amendment $58,853
Amendment $58,853
Amendment $58,853
Amendment $529,672
Amendment $529,672
Amendment $529,672
Amendment $529,672
Amendment -$164,474
Amendment $0
Amendment $164,474
Amendment -$164,474
Amendment $0
Amendment $164,474
Amendment $164,474
Amendment $34,991
Amendment $34,991
Amendment $34,991
Amendment $34,991
Amendment $629,825
Amendment $629,825
Amendment $629,825
Amendment $629,825
Amendment $629,825
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $0
Amendment $746,767
Amendment $746,767
Amendment $0
Amendment $746,767
Amendment $0
Amendment $0
Amendment $746,767
Amendment $746,767
Amendment $0
Amendment $0
Amendment $47,513
Amendment $47,513
Amendment $47,513
Amendment $47,513
Amendment $534,517
Amendment $534,517
Show 40 more

Latest 50 listed here. See the rest on GovTribe.

Subawards

Subrecipient Amount Awarded
Radiabeam Technologies, LLC Task 1: Plan linac upgrade. Carry out design, simulations, and engineering to upgrade the current linac to higher power. The output of this task will be a set… $758,484
Radiabeam Technologies, LLC Radiabeam Task 1: Plan linac upgrade. Carry out design, simulations, and engineering to upgrade the current linac to higher power. The output of this task… $322,434

Quick answers

Who received award R01CA255432?

R01CA255432 was awarded to The Regents Of The University Of California. San Francisco by National Cancer Institute (National Institutes of Health) on March 15, 2021.

How much is award R01CA255432 worth?

$12,525,891 has been obligated on R01CA255432: $11,931,171 in federal funding and $594,720 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards