THE GOAL OF THIS PROJECT IS TO PROTECT WATER QUALITY IN A NEWLY BUILT RESERVOIR, WP 1, USING BEST MANAGEMENTPRACTICES THAT REDUCE SEDIMENT INPUT AND EXCESSIVE NUTRIENTS VIA CONSTRUCTION OF A SEDIMENT RETENTION STRUCTUREAND SHORELINE PROTECTION MEASURES. THE GOAL AND PRODUCTS OF THE PROJECT IS TO CREATE 2,000 FT. OF SHORELINEPROTECTION (RIP RAP) AND 8 BREAKWATER STRUCTURES (MODIFIED FOR ANGLER ACCESS) TO BE CONSTRUCTED BY 2024 TO REDUCEIN LAKE EROSION. STRATEGICALLY PLACED BREAKWATER STRUCTURES AND SHORELINE STABILIZATION WILL BE NEEDED TO PREVENTSHORELINE EROSION AND SLOUGHING WHICH COULD REDUCE OR ELIMINATE THE BENEFITS GAINED FROM IMPLEMENTING THESEDIMENT BASIN UPSTREAM OF THE RESERVOIR. THERE ARE NO SUB RECIPIENTS.