Purchase Order INP17PX02776
Award Date 8/24/17
Potential Completion Date 10/31/17
Potential Value $38K
Federal Agency
Ultimate Awardee
Not listed Federal Contract Vehicle
- Not listed
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Tucson, AZ 85719, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
5
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Department of the Interior National Park Service Intermountain Region awarded a $498,159 firm fixed price delivery order contract to El Paso J.a.g., Inc. doing business as El Paso Jag Inc. to replace piping and floor drains at four comfort stations built in 1960 at Big Bend National Park, Texas. This rehabilitation project will mitigate the existing plumbing and sewer drainage systems at the Chisos Basin Campground comfort stations to address issues that have arisen since their original...
- <p>The Department of the Interior National Park Service Intermountain Region awarded a $488,094.25 firm fixed price delivery order contract to El Paso J.a.g., Inc. doing business as El Paso Jag Inc. to re-pipe and line the wastewater lift station at Big Bend National Park, Texas. The work is to be performed between July 26, 2022 and September 11, 2023 at the park located in Big Bend, Texas.</p>
- <p>This firm fixed-price purchase order contract was awarded by the National Park Service, Intermountain Region to Integritas Systems, L.L.C., a small business. The contract, valued at $87,100.00, is for the replacement of a duplex pressure booster pump set at Big Bend National Park in Texas. The work includes demolition and removal of the existing equipment as well as installation of new pumps, tanks, plumbing, wiring, and controls. The contract has a completion date of December 30, 2016.</p>
- <p>The National Park Service issued a $391,233.08 delivery order to Architectural Resources Group, Inc., a woman-owned small business, on July 27, 2026, for repackaging construction documents for the Chisos Basin and Panther Junction water systems at Big Bend National Park, Texas. The order carries a firm fixed price and concludes March 31, 2027.</p>
- All-Rite Construction, Inc. has been awarded a firm fixed price delivery order valued at two hundred forty-nine thousand two hundred nine dollars and one cent ($249,209.01) by the National Park Service Intermountain Region to replace approximately one thousand one hundred seventy-seven (1,177) linear feet of three-inch (3") high-density polyethylene (HDPE) waterline at Big Bend National Park in Texas. Work will include installation of a new water line at a minimum four-foot (4') bury...
- This is a federal contract award to All-Rite Construction, Inc., an SBA-certified HUBZone and small disadvantaged business based in Albuquerque, New Mexico. The contract, awarded by the National Park Service Intermountain Region, is for the rehabilitation of the Chisos Basin water system at Big Bend National Park in Texas. The contract has a ceiling value of $448,390.47 and is a firm fixed-price delivery order. The award date was August 20, 2015, and the ultimate completion date is December...
- This federal contract award is for the rehabilitation of the Castolon water system at Big Bend National Park, located in Texas. The work includes repairs and modifications to the potable water system serving the Castolon unit, which includes a campground, staff housing, and a historic district with a general store and visitor bathroom. The project aims to address water quality issues and supply treated water to the staff housing area. The contract was awarded by the Department of the...
- The National Park Service awarded a $5.33 million definitive contract to Blue World Construction Inc. (doing business as Blue World Remediation), a self-certified small disadvantaged business, for replacement and upgrade of water infrastructure at Big Bend National Park, Texas on September 25, 2023, under a full and open (no set-aside) basis. The originating solicitation, posted in March 2023, describes design-build work to replace and upgrade water systems serving two public water systems at...
- This federal contract award is for the rehabilitation of the Maverick Entrance Station at Big Bend National Park in Texas. The primary work includes replacing various interior and exterior building components, such as lighting fixtures, flooring, paint, windows, doors, and plumbing fixtures. Additionally, the contract calls for installing new security cameras and updating the building's alarm and fire/smoke detection systems. The contract was awarded to All-Rite Construction, Inc., an...
- This firm fixed-price delivery order was awarded by the National Park Service (NPS) Intermountain Region to Ridgway Valley Enterprises Inc., a small business commercial general contractor. The $900,686.83 contract is for the replacement of the Pine Spring main wastewater system at Guadalupe Mountains National Park in Texas. The project involves replacing the septic tank, sand filter, and disposal field with a new on-site sewage facility sized for a 20,000 GPD design flow. The contractor is...
X:NOGRN, CONSTRUCTION, SUPPLY AND INSTALL PLUMBING FIXTURES AND PARTITIONS AT CHISOS BASIN CAMPGROUND, BIG BEND NATIONAL PARK, PMIS 151493 AND 157972
Posted 8/24/17
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Combined Synopsis/Solicitation Rehabilitate Two Comfort Stations in Chisos | P17PS01760 | Department of the Interior National Park Service | Award Notice 1/1 | 6/23/17, 3:19 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $38.1k | 8/24/17 |