Treat air shaft with metacrylics products to seal walls against water infiltration. The work shall be accomplished in accordance with metacrylics energy efficient coatings proposal dated nove 10, 2010…
Ended Purchase Order Awarded
- Contract number
- GS02P11PHP0025
- Awardee
-
Hirani Engineering And Land Surveying, D.p.c. UEI L3NYL9LSWK21
- Awarding agency
-
Region 2
Public Buildings Service, General Services Administration
- Obligated
- $24,450
Award facts
- Contract value 100% obligated
- $24,450.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 238990 All Other Specialty Trade Contractors
- PSC
- Not on record
- Set-aside
- No set-aside
- Competition
- Not Competed under SAP · 1 offer Simplified Acquisition
- Pricing
- Firm Fixed Price
- Place of performance
- New York, NY 10007, USA
Award details come from SAM.gov/FPDS.
Description
Treat air shaft with metacrylics products to seal walls against water infiltration. The work shall be accomplished in accordance with metacrylics energy efficient coatings proposal dated nove 10, 2010 and with the following scope of work. Scope of work: provide supervision, labor, administrative support, supplies, materials, equipment and insurance to apply metacrylics acrylic base and stitchboard polyester fabric to approximately 900 SQ FT of wall and floor surface of shaft walls. All work must be performed in compliance with OSHA, nfpa, NEC and EPA regulations/ codes. Work may be performed during regular business hours as long as the work does not disturb the tenants. The contractor shall schedule the work with GSA and with LBB. Prior to start of work, please submit: 1. A list of personnel who will be on site, the last four digits of their social security number and their date of birth; 2. List of vehicles with license plates numbers; 3. Msds for all materials that will be used on site. The contractor shall strictly adhere to all precautions necessary to the safety, health and welfare of the workmen in accordance with the provisions of the US department of labor, the occupational safety & health administration (OSHA) 29 CFR 1926. The contractor shall determine the need for and shall ensure the use of personal protective equipment. If needed the equipment will meet, at a minimum, the requirements of OSHA. The contractor shall, upon request, provide documentation to prove that mechanics working on the project are licensed to work on york screw chillers and trained in OSHA safety regulations. The project shall be considered completed when: 1. The information above is received in written form and accepted by GSA. 2. The fresh air shaft is sealed/ water tight and the chief operating engineer is satisfied with the work and with the results. Flood testing of area may be required prior to final payment. 3. All debris, materials, supplies and equipment has been removed from the building. The work areas are broom swept and left in a clean and orderly condition.
Quick answers
Who was awarded contract GS02P11PHP0025?
GS02P11PHP0025 was awarded to Hirani Engineering And Land Surveying, D.p.c. by Region 2 (Public Buildings Service) on January 7, 2011.
How much is contract GS02P11PHP0025 worth?
The government has obligated $24,450 on GS02P11PHP0025.
Was contract GS02P11PHP0025 competed?
The extent of competition for GS02P11PHP0025 was not competed under sap. The government received 1 offer.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award