Purchase Order FA857126P0022
- Not listed
- The Department of the Air Force Materiel Command Warner Robins Air Logistics Complex awarded a $213,128.66 firm fixed-price delivery order to RCA Contracting, Inc. for the installation of an automatic direct digital control system and air conditioning unit at Building 642 on the South Base in Warner Robins, Georgia. Performance will take place at the specified location from April 20, 2021 through April 29, 2022. The order was issued against the Multiple Award Construction contract for...
- <p>Air Force Materiel Command awarded a purchase order to Johnson Controls, Inc. for $232,523.10 on March 10, 2022, to repair chiller unit #4 in Building 177 at Warner Robins Air Force Base, Georgia. The order carries firm fixed price terms with an ultimate completion date of October 7, 2022. No small business set-aside was used.</p>
- Warner Robins Air Logistics Complex awarded a purchase order to Portable Air And Power, LLC for $506,580.53 on January 1, 2024, to lease and maintain a temporary chiller system for Building 158 at Robins Air Force Base. The contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to sustain chilled water to the building in like capacity as the existing Daikin chiller system. Performance is at Warner Robins, Georgia. The order is firm fixed price with an...
- The Air Force Materiel Command issued a $197,400 delivery order to RCA Contracting, Inc., a HUBZone-certified small disadvantaged business, on April 13, 2026, under the Robins Air Force Base Mechanical/Electrical II 2024–2029 IDIQ to replace Building 941's carrier package heat pump and update HVAC controls. The order is a HUBZone set-aside. Work is performed at Warner Robins Air Force Base, Georgia, with an ultimate completion date of September 1, 2026. Pricing is firm fixed price.
- Air Force Materiel Command issued a delivery order to RCA Contracting, Inc., a HUBZone-certified small disadvantaged business, on September 29, 2023, with a ceiling value of $10.55 million for design and replacement of chillers 5 and 6 in Building 177 at Warner Robins Air Force Base, Georgia, under a HUBZone set-aside. Place of performance is Warner Robins, GA. The ultimate completion date is November 24, 2025. The order is priced on a firm fixed price basis. RCA Contracting, based in Montezuma,...
- The Department of the Air Force Materiel Command Warner Robins Air Logistics Complex awarded a $6,700 firm fixed-price purchase order to F3 Solutions LLC for EBW HVAC and fire suppression relocation services. The contract supports work at Warner Robins Air Force Base in South Georgia and will be performed between September 1st and October 1st, 2023. No additional details were provided regarding subcontractors or the Materiel Command's programs. The award utilizes no set-aside designations and...
- The Warner Robins Air Logistics Complex awarded a purchase order to Portable Air And Power, LLC for $36,999.99 on April 1, 2026, for temporary air conditioning for Building 185. Work is performed at Warner Robins, Georgia. The order carries a firm-fixed-price structure and concludes on October 31, 2026. This purchase order falls under the vendor's existing Air Force Materiel Command Blanket Purchase Agreement (effective July 1, 2024 through June 30, 2029, ceiling $1,500,000) for chiller system...
- The Warner Robins Air Logistics Complex, a Defense agency, issued a $726,270.50 delivery order to Schmidt-Prime Group, LLC, a small business, on May 20, 2026, under a Total Small Business set-aside for HVAC and chilled water system repair and replacement work at Warner Robins Air Force Base, Georgia. The order covers three discrete facility projects: survey and analysis of a chilled water pump in the maintenance department (Building 125), repair and replacement of an HVAC system on the second...
- <p>Warner Robins Air Logistics Complex issued a purchase order to Air Data-Macon, Georgia, Inc. for test and balance of the HVAC system in Building 54, with a ceiling value of $60,384.00 and an award date of April 6, 2018. Work is performed in Macon, Georgia, with an ultimate completion date of October 5, 2018. The order is priced on a firm fixed price basis with no small business set-aside.</p>
- The U.S. Air Force Materiel Command awarded a $51.9K firm fixed-price purchase order to Dantherm Cooling, Inc., a Women-Owned Small Business, on September 30, 2025, for air conditioning replacement services at Robins Air Force Base in Warner Robins, Georgia. The contract, designated under the Total Small Business set-aside program, requires Dantherm Cooling to replace HVAC units on three trailers belonging to the 402d Aircraft Maintenance Group. The scope of work includes removal of existing...
The Air Force Materiel Command Warner Robins Air Logistics Complex awarded a purchase order to Conditioned Air, LLC for air handler refurbishment, valued at $1,289,887, on January 15, 2026, with completion due July 15, 2026. Work takes place at Warner Robins Air Force Base, Georgia. The order covers removal and installation of seven air handlers in Building B20128, including fan array systems, filter systems, and hot water coils. Technical requirements specify two-stage filtration (MERV 7 pre-filter and MERV 13 final filter), six-fan minimum configuration, 100 percent outside air system, and hot water heating coils operating at 180 degrees Fahrenheit entering water temperature. The contractor must maintain facility production capabilities, work on no more than two air handlers simultaneously, and prohibit facility shutdown. The air handler housing measures 24 feet long by 11 feet wide by 10 feet high; existing electrical service provides 150 amps at 480 volts, 3 phase, 60 Hz. The order originated from RFQ No. FA857126Q0018, posted November 7, 2025, with offers due December 5, 2025.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
78287 - CBR - B20128 Air Handler Refurbishment | FA857126P0022 | Department of the Air Force Materiel Command Air Force Sustainment Center | Award Notice 2/2 | 1/20/26, 10:28 AM | |
78287 - CBR - B20128 Air Handler Refurbishment | FA857126Q0018 | Department of the Air Force Materiel Command Air Force Sustainment Center | Solicitation 1/2 | 11/7/25, 4:00 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $1.3m | 1/14/26 |