This is a firm-fixed price definitive contract awarded by the Department of the Interior's National Park Service Pacific West Region to Valdez Construction Inc., an 8(a) sole source small business contractor, to modify and rehabilitate the waste water system and drain field at the Hoh Rainforest Campground in Olympic National Park, Jefferson County, Washington. The potential value of the contract is $837,817.72, with a completion date of May 18, 2018. Valdez Construction Inc. is a full-service...
The Department of the Interior National Park Service Pacific West Region awarded a $3.4 million firm-fixed-price definitive contract to RJS Construction Inc. to rehabilitate the public water system at Heart O' the Hills Campground in Olympic National Park near Port Angeles, Washington. The work includes replacing the well pump, controls, electrical systems, water treatment building, chlorine storage and feed systems, water storage tank components, distribution piping, backflow prevention, and...
The National Park Service Pacific West Region awarded a $1.3 million firm-fixed price contract to Orion Construction Inc. to design and construct a new large onsite sewage system at the Hurricane Ridge Visitor Center in Olympic National Park, Washington. Per the solicitation, the contractor will rehabilitate the existing septic system to meet current and future peak wastewater flow conditions in accordance with state regulations. The contract is set aside for small businesses under NAICS code...
The Department of the Interior National Park Service Pacific West Region awarded a $258,213.00 firm fixed-price purchase order contract to rehabilitate recreational vehicle (RV) dump stations at four campgrounds within Olympic National Park. The contract was set aside for small business participation and was awarded to Columbia Land Services Inc., a self-certified small disadvantaged business. The work will be performed in Port Angeles, Washington and is covered by prevailing wage determinations...
The Department of the Interior National Park Service Pacific West Region awarded a $663,045 firm fixed price construction contract to YOY Inc. Verdis Division for replacement of plumbing and electrical systems at a historic former Superintendent's residence in Olympic National Park, Washington. The solicitation sought these services to replace water, sanitary and drain piping and fixtures, electrical panels and wiring, preserve existing finishes, restore installation areas, and install new...
This is a firm-fixed-price definitive contract awarded by the Department of the Interior's National Park Service Pacific West Region to Valdez Construction Inc., a small business subchapter S corporation located in Washington state. The $1,479,046.70 contract is for the replacement of wastewater lift stations at the Ohanapecosh Campground (Loops A and F) in Mount Rainier National Park, Washington. The contract was awarded on July 25, 2018 with a completion date of November 27, 2019. This was...
This federal contract award, INP15PC00307, was issued by the National Park Service's Pacific West Region to Valdez Construction Inc., a for-profit, Subchapter S Corporation located in Oak Harbor, Washington. The $205,986.71 firm fixed-price contract is for the construction of a new campsite suitable for educational groups at English Camp, San Juan Island National Historical Park. The work includes site clearing, grading, a septic system, electrical service, and concrete pad construction. This...
This is a $186,459.04 firm fixed-price definitive contract awarded by the U.S. Department of the Interior's National Park Service (NPS) to Valdez Construction Inc., an 8(a) small business contractor, to construct storm water collection and reuse improvements at Ebey's Landing National Historical Reserve in Coupeville, Washington. The contract includes an option for Valdez Construction to replace up to 1,190 linear feet of 6-inch high-density polyethylene (HDPE) pipe if the existing pipe is...
The National Park Service awarded a $1,391,127.65 firm fixed-price definitive contract to JMG Constructors LLC, a woman-owned small business, to rehabilitate the Hurricane Ridge Day Lodge in Olympic National Park, Port Andrews, Washington. The project involves improvements to the electrical, plumbing, fire detection, elevators, roof, windows, doors, walls, floors, and restrooms to comply with accessibility standards. This contract was set aside for small businesses and is expected to be...
This is a firm fixed-price definitive contract awarded by the National Park Service, Pacific West Region, to HCS Inc Commercial General Contractor Construction Division, a small business prime contractor. The $84,316.80 contract is for the construction of an entrance sign structure at the Olympic National Park Visitor Center in Port Angeles, Washington. The contract has a total small business set-aside designation. Based on the prime contractor's past performance, they have experience delivering...