- The U.S. Department of Agriculture Forest Service Eastern Region (Region 9) awarded a task order valued at $24,560 to Jack Bowen Excavating for the removal and replacement of existing dam walkway timber railing at the Hapgood Pond Recreation Area located in the Green Mountain National Forest in Peru, Vermont. This contract, awarded on September 2, 2025, with completion targeted for November 21, 2025, was issued as a call under the Northeast Region 9 Roads Blanket Purchase Agreement and carries a...
- The U.S. Department of Agriculture Forest Service, Eastern Region (Region 9) awarded a $34,220 firm fixed-price purchase order to Jack Bowen Excavating, a small business sole proprietorship based in Castleton, Vermont, for improvements to the Hapgood Pond Recreation Area in the Green Mountain National Forest. This Total Small Business set-aside contract requires the contractor to construct recreational infrastructure including a 10-foot-wide precast concrete boat launch with riprap stabilization...
- The USDA Forest Service, Region 9, issued a purchase order to Harveys Excavating, LLC on May 15, 2026, for reconstruction of Forest Road 42C on the Green Mountain National Forest, with a ceiling value of $41,142.50. The order is set aside for total small business. Work is performed in Rochester, Vermont, and includes roadway reconstruction, rock excavation, clearing and grubbing, bank armoring, linear grading, and installation of drainage structures under NAICS 237310. The order is firm fixed...
- The Department of Agriculture Forest Service awarded a $429,400 firm fixed-price contract to Renaud Bros., Inc. doing business as Renaud Brothers Inc. to replace Bridge 10-6.9 located on Forest Route 10-6.9 in the Green Mountain National Forest in Rutland County, Vermont. The solicitation sought proposals to demolish the existing bridge and construct a new cast-in-place concrete bridge with precast concrete slabs, timber railings, and site work. The contract is set aside for total small business...
- The USDA Forest Service awarded a $7,900 firm fixed price delivery order to Jack Bowen Excavating of Mendon, Vermont. The contract calls for valve replacements at Hapgood Pond to support the Green Mountain National Forest program. Performance will take place in Mendon, Vermont by July 4, 2020. As no set aside designation was used, this appears to be a straightforward small purchase award for valve replacement work at a pond located within the Green Mountain National Forest. The prime...
- This is a $637,888.84 definitive, firm-fixed-price contract awarded by the U.S. Department of Agriculture (USDA) Forest Service, Region 9 - Eastern Region, to Birdseye Building Co, a small business, for the replacement of a culvert on Forest Road 59-4.9 in the Green Mountain National Forest in Ripton, Vermont. The contract work includes excavation, removal of the existing culvert, installation of a government-furnished plate arch culvert, construction of concrete substructures and stream...
- The USDA Forest Service, Region 9, awarded a purchase order to R.M. Piper, Inc., an EDWOSB and WOSB certified small business, for $1,703,443 on August 3, 2026, under total small business set-aside to reconstruct Rob Brook Road Bridge on the White Mountain National Forest. Work is performed in Campton, New Hampshire, and includes demolition of the existing 28-foot timber bridge, disposal of materials, and construction of a new 44-foot bridge with government-furnished steel stringers, concrete...
- The U.S. Department of Agriculture Forest Service, Eastern Region awarded a firm fixed price delivery order valued at one thousand thirty dollars and seventy-two cents ($1,030.72) to Allard Excavating of Mendon, Vermont. The delivery order, issued under the GMNF-FY2020 blanket purchase agreement, tasks the contractor with assessing and repairing an emergency leak at Hapgood Pond by June 22, 2020. No set-aside designation was applied to this award to address urgent infrastructure needs within the...
- T.X.C.S. Services LLC was awarded a $494,561.70 firm fixed-price contract by the U.S. Forest Service, Eastern Region (Region 9), to replace the superstructure and deck of Forest Road 278 Bridge located in the Green Mountain National Forest in Woodford, Vermont. The contract, designated as a Total Small Business set-aside and funded under the Great American Outdoors Act, requires comprehensive bridge reconstruction activities including removal of existing components, installation of new bridge...
- <p>This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers, New England District (ENDIST New England) to Granite State Lawn Care, a small business, for $140,891.78 to perform slope repair work at the Union Village Dam in East Thetford, Vermont. The contract has a completion date of November 6, 2015 and was set aside for small businesses. No additional details about larger contract vehicles or subcontractors were provided.</p>
The U.S. Department of Agriculture Forest Service awarded a purchase order to Reagent World, Inc. for $49,875 on September 23, 2026, to repair bridge supports at Hapgood Pond Dam on the Green Mountain National Forest. The order is set aside for Total Small Business under NAICS 237310. Reagent World is a minority-owned, woman-owned small disadvantaged business. Work takes place in Manchester, Vermont and includes cleaning and preparing existing concrete and wingwall surfaces, drilling and grouting rebar into existing concrete, placing rebar and forms, and placing new concrete bridge supports to address horizontal cracking. The concrete must meet or exceed 4,500 PSI compressive strength, and reinforcing steel shall be ASTM A615 Grade 60 deformed rebar. The contractor is responsible for all concrete sampling, test cylinders, and laboratory testing. Davis-Bacon prevailing wage rates apply. Performance runs from September 23, 2026 to January 20, 2027, with all work to be completed within 120 calendar days following Notice to Proceed. The pond will be drained on or around October 13, with the construction window occurring during the fully drained period. Site access is limited to a approximately 5-foot-wide hard pack trail; concrete pump trucks cannot access the site, so the contractor must carry or mix concrete on-site.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
GMF Hapgood Pond Dam Spillway Bridge Support | 12445526Q0126 | Department of Agriculture Forest Service | Solicitation 1/2 | 8/12/26, 4:05 PM | |
GMF Hapgood Pond Dam Spillway Bridge Support | 12445526P0053 | Department of Agriculture Forest Service | Award Notice 2/2 | 9/15/26, 4:20 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $49.9k | 9/15/26 |