Lackland air force base ACC clinic building # 1 and central energy plant, phase 1B located in SAN antonio, TX

Ended Awarded Last action

Contract number
0005
Awardee
Awarding agency
Obligated
$46,143,331

Award facts

Contract value 99% obligated
  • $46,143,331.00 Current, with exercised options
  • $46,492,331.00 Potential, with all options
Completion date 100% complete
Current and potential, with all options
Funding agency
Army and Air Force Exchange Service Department of Defense
Set-aside
No set-aside
Competition
Full and Open Competition · 7 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Lackland AFB, San Antonio, TX, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope 1B · MJ045 various changes in scope due to phasing credit for the following work which was not accomplished: 1.) demolition of pavement, curb and gutter on south… -$2,398
Supplemental Agreement for work within scope 1A · MJ046 revised interior signage remove existing interior type A1 and type A2 signs and replace with type A1 and type A2 signs which have the nomenclature as… $124,000
Supplemental Agreement for work within scope 27 · MJ043 unforeseen soil conditions provide additional soil excavation and hauling cost associtated with the unforseen soil conditions located east of the ACC.… $74,101
Supplemental Agreement for work within scope 26 · ACC building # 1 MJ041 temporary emergency generator power provide temporary emergency generators to be used for the testing and commissioning of the… $14,992
Supplemental Agreement for work within scope 25 · ACC building # 1 MJ039 6 inch domestic cold water tee change the 6 inch X 4 inch domestic cold water tee to a 6 inch X 6 inch tee to accommodate the phase 2 6… $7,632
Supplemental Agreement for work within scope 24 · ACC building # 1 MJ033 separate ACS, 7 pin, add ACS locations provide the following elements of work for the access control system (ACS) for building 1: ACS… $114,021
Supplemental Agreement for work within scope 23 · ACC building # 1 MJ036 emergency feeder extensions at the CEP extend ATS-LS1, ATS-Q1, fire pump, and garage emergency power feeders to the phase II future… $125,147
Supplemental Agreement for work within scope 22 · ACC building # 1 MJ034 additional duct bank (OPT, bldg 1050) additional duct bank (OPT, bldg 1050); additional duct bank (ASI 018R) cable pathway routes shown… $611,218
Supplemental Agreement for work within scope 21 · ACC building # 1 MJ032 family health initiative layout change the following rooms (see attachment MJ032-1) to accommodate the formation of 8 team rooms (note… $183,817
Supplemental Agreement for work within scope 20 · ACC building # 1 MJ031 add PLC & breakers @ the CEP provide and integrate the following electrical elements of work in the phase 1B electrical system design, at… $113,300
Other Administrative Action 19 · ACC building # 1 MJ029 weather time extension JAN-MAR 2012 this modification extends the time for performance allowed under specification section 01 00 00.00 44… $0
Supplemental Agreement for work within scope 18 · ACC building # 1 a. Scope of work MJ012 interior progressive collapse redesign and construct (per UFC 4-023-03 guidance) the elements of work reflected below,… $675,000
Supplemental Agreement for work within scope 17 · ACC building # 1 convey arrangements to phase 3 $0
Supplemental Agreement for work within scope 16 · ACC building # 1 a. Scope of work MJ023 schedule 40 fire protection pipe -provide schedule 40 fire protection pipe for the wet pipe fire sprinkler system(S)… $36,861
Supplemental Agreement for work within scope 15 · ACC building # 1 delete the following elements from the phase 1B scope of work (REF. Phase 1B, 100% "for construction drawings" sheets C1.300 and 4ES102 for… -$235,500
Supplemental Agreement for work within scope 14 · ACC building # 1 MJ019 solder VS. Press fittings (PLUMBING) -utilize the solder (WELD) fitting connection method in lieu of the press fitting connection… $37,837
Supplemental Agreement for work within scope 13 · ACC building # 1 MJ015 abate TRANSITE line at bergquist/ vault the contractor struck a live 8" water line, which FED pump house #5, on 6-17-11 while… $43,082
Supplemental Agreement for work within scope 12 · ACC building # 1 MJ008 PENTHOUSE structural revisions this modification includes the following changes to the current phase 1B contract: - structural and… $61,000
Other Administrative Action 11 · ACC building # 1 weather time extension MAR 11- DEC 11 $0
Supplemental Agreement for work within scope 10 · This modification reimburses the contractor for all costs incurred as a result of soil testing at phase 1B to establish an environmental baseline in order to… $19,301
Supplemental Agreement for work within scope 9 · Add the design and construction scope of work from option 1, phase 1A ("continuation of the communication ductbank" clin 14, P00002), originally awarded under… $1,093,000
Supplemental Agreement for work within scope 8 · ACC building # 1, interior revisions to echo room $14,659
Supplemental Agreement for work within scope 7 $83,187
Supplemental Agreement for work within scope 6 $25,332
Other Administrative Action 5 $0
Supplemental Agreement for work within scope 4 $23,124
Supplemental Agreement for work within scope 3 · ACC building # 1 $18,618
Exercise an Option 2 · Exercise option clins 0011 & 0012 data & voice communication cabling for phase 1B at lackland AFB ACC building #1 complex $278,000
Exercise an Option 1 · Lackland AFB ACC building # 1 & CEP - MOD 1 adding funding for initial outfitting clin # 0013. $1,038,000
Original award $41,566,000
Show all 30

About this award

This firm fixed price delivery order from the Department of Defense Army and Air Force Exchange Service (AAFES) to J.E. Dunn Construction Company has a potential value of $46,492,331 to provide construction services for Lackland Air Force Base ACC Clinic Building #1 and Central Energy Plant, Phase 1B in San Antonio, Texas. As prime contractor, J.E. Dunn will oversee completion by October 19, 2013, drawing on major subcontractors for electrical, mechanical, architectural design, steel fabrication, and other specialty work. Notable subcontractors include Zachman Enterprises for electrical work, L.C. Mosel for mechanical, and Hoefer Welker for design/build architecture. The award does not specify a set-aside designation. Project details reference construction of new medical facilities and energy infrastructure to support AAFES programs at Lackland Air Force Base.

Quick answers

Who was awarded contract 0005?

0005 was awarded to J.e. Dunn Construction Company by ENDIST Fort Worth (US Army Corps of Engineers) on September 1, 2010.

How much is contract 0005 worth?

The government has obligated $46,143,331 on 0005. Its potential value, with all options, is $46,492,331.

Which agency awarded contract 0005?

ENDIST Fort Worth (US Army Corps of Engineers) awarded 0005, with funding from Army and Air Force Exchange Service (Department of Defense).

Is contract 0005 an order under another contract?

Yes. 0005 is a delivery order under W9126G08D0057, an indefinite delivery contract.

Was contract 0005 competed?

The extent of competition for 0005 was full and open competition. The government received 7 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award