Delivery Order NNL10AA05B-NNL14AB14T

Award Date 6/11/14
Potential Completion Date 10/10/15
Potential Value Not listed
Ultimate Awardee
The Boeing Company
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Cost Plus Fixed Fee
Place of Performance
Huntington Beach, CA 92647, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
2
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a task order award under the Basic and Applied Aerospace Research and Technology (BAART) indefinite delivery vehicle (IDV) contract, issued by the National Aeronautics and Space Administration (NASA) Langley Research Center. The task order is for the "Low Boom Flight Demonstration (LBFD) Aircraft Preliminary Design (PD)," with the objective of achieving the baseline LBFD requirements, concept preliminary design, and concept formulation and planning documentation to support a...
This is a $519,075,450.46 cost plus incentive fee contract awarded by the Armstrong Flight Research Center to Lockheed Martin Corporation for the design, construction, and flight validation of a research aircraft that creates a shaped sonic boom signature with a calculated loudness level of 75 PLDB or less during supersonic cruise (Mach = 1.4) flight. The contract, known as the Low Boom Flight Demonstrator (LBFD), has a completion date of June 28, 2026 and does not have a set-aside...
This is a delivery order contract awarded by NASA's Langley Research Center to the National Institute of Aerospace Associates (NIA), a non-profit research institute, to provide simulation development and handling qualities analysis for NASA's Low-Boom Flight Demonstrator (LBFD) designs. The contractor will develop high-fidelity 6-degree-of-freedom simulations to model the flight dynamics and aeroelastic effects of the long, slender LBFD vehicle designs. They will also analyze the stability,...
This is a fixed-price contract awarded by the National Aeronautics and Space Administration (NASA) Langley Research Center to Wyle Laboratories, Inc. for a Low Boom Community Response Pilot Program. The contract is funded through the Recovery Act to support NASA's Aeronautics Research Mission Directorate Supersonics Project, which aims to develop technologies to enable supersonic civil aircraft that can fly over land without creating unacceptable sonic booms. The $836,926 contract requires...
This $1,819,270.00 cost-plus-fixed-fee contract was awarded by the Langley Research Center, a civilian agency, to Applied Physical Sciences Corp, a subsidiary of General Dynamics Corp, for "Risk Reduction for Future Community Response Testing with a Low-Boom Flight Demonstration Vehicle." The contract consists of two phases - the first phase involves creating a conceptual plan for community response testing using an experimental low-boom aircraft, and identifying associated risks and...
This is a Small Business Innovation Research (SBIR) Phase II contract awarded by the National Aeronautics and Space Administration (NASA) to M4 Engineering, Inc., a for-profit small business. The contract, valued at $749,941, aims to develop a software tool capable of generating weight and load responses for unconventional aircraft designs using physics-based structural analysis simulations. This effort is intended to address the limitations of existing historical databases in accurately...
Exosonic, Inc. has been awarded a $749,981 firm fixed price purchase order by the Department of the Air Force Materiel Command Research Laboratory to support the development of a low boom supersonic unmanned aerial vehicle as a technology demonstration and adversary air trainer under Phase II of the Small Business Innovation Research program. Performance will take place in San Jose, California over a 14-month period concluding in December 2022. The award is designated for total small business...
This is a cost-plus-fixed-fee task order awarded by the Langley Research Center, part of the National Aeronautics and Space Administration (NASA), to The Boeing Company for a project focused on reducing risk to achieving NASA's N2 noise goal of 42 decibels cumulative relative to the Federal Aviation Administration's Stage 4 requirement. The $2,395,243 task order aims to improve NASA's aircraft system noise assessment methodology in four critical areas: high-fidelity ultra-high bypass fan noise...
This federal contract award is for NASA's Langley Research Center to work with The Boeing Company on an aeroacoustic experiment to study the noise impacts of open rotor propulsion systems integrated with different aircraft configurations. The $6,153,239 cost-plus-fixed-fee contract builds on previous research conducted under a prior task order, with the goal of improving the understanding and prediction of propulsion airframe aeroacoustic (PAA) effects, particularly as they relate to emerging...
This delivery order awarded by the National Aeronautics and Space Administration (NASA) Langley Research Center is for $122,450 to the National Institute of Aerospace Associates for research into Pulsed Energy Deposition for Reduction in Ground Sonic Boom Signature. The work is an extension of a prior task initiated under NASA Identified Need 80LARC17F0050 to evaluate the benefits of pulsed energy deposition by electromagnetic devices such as femtosecond to nanosecond lasers, microwaves and DC...
  • NNL10AA05B
    Indefinite Delivery Contract
  • NNL10AA05B-NNL14AB14T
    Delivery Order

STATEMENT OF WORK (SOW) SMAAART TASK TITLE: LOW-BOOM FLIGHT DEMONSTRATOR (LBFD) CONCEPT REFINEMENT STUDY 1.0 INTRODUCTION/BACKGROUND: THE OVERALL GOAL OF THE NASA FUNDAMENTAL AERONAUTICS PROGRAMS HIGH SPEED PROJECT IS TO DEVELOP AND VALIDATE THE TOOLS, TECHNOLOGIES, AND CONCEPTS TO OVERCOME THE BARRIERS TO PRACTICAL HIGH-SPEED VEHICLES. DURING THE 2013 - 2017 TIME PERIOD, THE HIGH SPEED PROJECT HAS PLACED A PRIORITY ON THE DEVELOPMENT OF TOOLS AND INTEGRATED CONCEPTS THAT WILL ENABLE DEMONSTRATION OF OVERLAND SUPERSONIC FLIGHT WITH AN ACCEPTABLE SONIC BOOM. TWO OF THE HIGH SPEED PROJECTS TECHNICAL CHALLENGES IN THIS TIME FRAME RELATE TO THIS PRIORITY. THEY ARE LOW SONIC BOOM DESIGN TOOLS AND THE DEVELOPMENT OF SONIC BOOM COMMUNITY RESPONSE METRICS AND METHODOLOGIES. THE HIGH SPEED PROJECT ALSO HAS A TECHNICAL CHALLENGE OF ACHIEVING ACCEPTABLE AIRPORT COMMUNITY NOISE. IN ADDITION TO THESE NEAR-TERM TECHNICAL CHALLENGES, THE HIGH SPEED PROJECT CONTINUES TO INVEST IN LONGER-TERM RESEARCH ON OTHER BARRIERS TO HIGH-SPEED AIRCRAFT SUCH AS HIGH ALTITUDE EMISSIONS, CRUISE EFFICIENCY, AEROSERVOELASTICITY, FLIGHT SYSTEMS, AND SCRAMJET PROPULSION. THE SELECTION OF THESE TECHNICAL CHALLENGES DESCRIBED ABOVE WAS BASED ON SUCCESSFUL FUNDAMENTAL AERONAUTICS SUPERSONICS PROJECT RESEARCH CONDUCTED OVER THE PREVIOUS SEVERAL YEARS. ALTHOUGH BROADER IN OVERALL SCOPE THAN THE HIGH SPEED PROJECT, THE SUPERSONICS PROJECT ALSO CONTAINED ELEMENTS THAT FOCUSED ON LOW SONIC BOOM DESIGN AND SONIC BOOM COMMUNITY RESPONSE. THIS WORK CULMINATED IN THE 2009 AWARD OF THE N+2 SYSTEMS VALIDATION CONTRACTS. THE OBJECTIVE OF THESE NASA RESEARCH ANNOUNCEMENT (NRA)-FUNDED EFFORTS WAS TO EVALUATE TOOLS AND TECHNOLOGIES FOR SUPERSONIC CIVIL AIRCRAFT DESIGN. THE STUDIES HAVE HELPED VALIDATE THESE TOOL SETS AND TECHNOLOGIES THROUGH SUCCESSFUL WIND TUNNEL TESTING OF SCALE MODELS. THE NEXT CRITICAL STEPS IN OVERCOMING THE BARRIER TO OVERLAND SUPERSONIC FLIGHT ARE FLIGHT VALIDATION OF THESE TOOLS AND TECHNOLOGIES COUPLED WITH COMMUNITY RESPONSE STUDIES AND RESEARCH FLIGHTS THAT WILL PROVIDE DATA TO SUPPORT THE DEVELOPMENT OF A NOISE-BASED REGULATORY STANDARD TO REPLACE THE CURRENT PROHIBITION OF CIVIL OVERLAND SUPERSONIC FLIGHT. BASED ON RECENT SUCCESSFUL EFFORTS, THE HIGH SPEED PROJECT WAS DIRECTED TO FOCUS ON ENSURING THE READINESS OF LOW-BOOM DESIGN TOOLS FOR APPLICATION IN A MANNED FLIGHT DEMONSTRATION PROJECT AND ON THE VALIDATION OF FIELD STUDY METHODOLOGIES, SURVEY TOOLS, AND THE TEST PROTOCOLS REQUIRED TO SUPPORT COMMUNITY OVERFLIGHT STUDIES. THE HIGH SPEED PROJECT WAS ALSO TASKED WITH CONDUCTING CONCEPT STUDIES AND RESEARCH TO INFORM THE DECISION PROCESS REGARDING A POTENTIAL FLIGHT DEMONSTRATION PROGRAM INCLUDING THE DEVELOPMENT AND DEFINITION OF PROGRAMMATIC, TECHNICAL, AND COST REQUIREMENTS FOR A LOW-BOOM FLIGHT DEMONSTRATION (LBFD) PROJECT. THE PRIMARY OBJECTIVES OF THE LBFD PROJECT WOULD BE TWO-FOLD: THE FLIGHT VALIDATION OF DESIGN TOOLS & TECHNOLOGIES APPLICABLE TO LOW SONIC BOOM AIRCRAFT AND THE CREATION OF COMMUNITY RESPONSE DATA THAT WILL SUPPORT THE DEVELOPMENT OF A NOISE-BASED STANDARD FOR SUPERSONIC OVERLAND FLIGHT. TO INVESTIGATE THE POTENTIAL LBFD, NASA INITIATED A LBFD CONCEPT FORMULATION STUDY IN MARCH 2013. THE GOALS OF THE LBFD CONCEPT FORMULATION STUDY WERE TO DEFINE THE INITIAL LBFD MISSION REQUIREMENTS, PROVIDE A CONCEPT DEFINITION CONSISTENT WITH THE MISSION REQUIREMENTS, AND PROVIDE CONCEPT FORMULATION PLANNING AND DOCUMENTATION REQUIRED FOR THE LBFD EFFORT. FOR THE PURPOSES OF THE LBFD CONCEPT FORMULATION STUDY, THE LBFD PROJECT WAS ENVISIONED AS THREE DISTINCT PHASES. PHASE 1 INCLUDED ALL REQUIRED LBFD AIRCRAFT DEVELOPMENT ACTIVITIES FROM SYSTEM DEFINITION AND PRELIMINARY DESIGN THROUGH FABRICATION, CHECKOUT, AND FIRST FLIGHT THROUGH SUPERSONIC ENVELOPE EXPANSION. PHASES 1 & 2 WERE EXPECTED TO INCLUDE MINIMAL TECHNOLOGY DEVELOPMENT AND NOT EXCEED 5 YEARS IN DURATION. PHASE 2 TRANSITIONED FROM E

Posted 6/11/14, 12:00 AM