Smaaart task order: task title: aerodynamic testing support for investigation of the hybrid wing body N2A-exte configuration in the 14- by 22-foot subsonic tunnel 1.0 introduction/background: NASA…
Ended Awarded Last action
- Contract number
- NNL11AC16T
- Awardee
-
The Boeing Company UEI U5BBKY1S5GF6
- Awarding agency
-
Langley Research Center
National Aeronautics and Space Administration
- Obligated
- $68,375
Award facts
- Contract value 97% obligated
- $70,636.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- Set-aside
- No set-aside
- Competition
- Full and Open Competition · 1 offer Multiple Award, Fair Opportunity
- Pricing
- Cost Plus Fixed Fee
- Place of performance
- Huntington Beach, CA 92647, USA
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Other Administrative Action | -$2,151 | |
| Supplemental Agreement for work within scope | -$110 | |
| Supplemental Agreement for work within scope | $0 | |
| Original award | $70,636 |
Description
Smaaart task order: task title: aerodynamic testing support for investigation of the hybrid wing body N2A-exte configuration in the 14- by 22-foot subsonic tunnel 1.0 introduction/background: NASA created the environmentally responsible aviation (ERA) project to explore and document the feasibility, benefits, and technical risk of vehicle concepts and enabling technologies that will reduce the impact of aviation on the environment. Today's current generation of aircraft has benefitted from NASA investments in aeronautical research that have improved fuel efficiencies, lowered noise levels, and lessened harmful emissions. Although substantial progress has been made, much more needs to be done. The nation's air transportation system will expand by a factor of two or three within the next two decades, potentially increasing aviation's contribution to climate change. The ERA project works to reduce the environmental harm that could result from such an expansion. Among the technologies to be explored in the ERA project are the following: unconventional aircraft configurations that have higher lift to drag ratio, reduced drag and reduced community noise; drag reduction through laminar flow; advanced composite structural concepts for weight reduction; low NOX combustors; and propulsion and airframe integration for noise reduction and fuel-burn improvements. The ERA project will focus on environmental issues associated with aircraft, including fuel burn, emissions, and noise. The project will explore and document the feasibility, benefits, and technical risk of vehicle concepts and enabling technologies identified to have the potential to mitigate the impact of aviation on the environment. This research directly supports the national aeronautics research and development policy to develop appropriate environmental protection measures to ensure continued growth in air transportation. One unconventional aircraft configuration, referred to as the hybrid wing body (HWB), has been shown to have the potential to significantly reduce fuel burn while simultaneously reducing noise levels on the ground. The combination of upper surface engine placement in conjunction with the large HWB planform enable an effective engine noise shielding configuration. National research announcement (NRA) contract NNL07AA54C, entitled: acoustic prediction methodology and test validation for an efficient low-noise hybrid wing body subsonic transport, was awarded to the boeing company in 2007 with work being initiated on october 1 of that year. This 3-year NRA contract was conducted to: (1) develop a hybrid wing body (HWB) subsonic transport configuration capable of meeting the NASA subsonic fixed wing (SFW) reduced noise and fuel burn goals; (2) develop improved noise prediction methods; (3) design and fabricate a wind tunnel model for testing in the larc 14- by 22-foot subsonic tunnel to validate predictions; and (4) assess the low-speed aerodynamic characteristics of the HWB configuration developed. NRA contract NNL07AA54C is a significant part of the environmentally responsible aviation (ERA) project, and IT directly supports the goals of exploring and documenting the feasibility, benefits, and technical risk of vehicle concepts and enabling technologies that will reduce the impact of aviation on the environment. Due to extended configuration design efforts and extended wind tunnel model design and fabrication efforts within the above mentioned NRA contract, the 3-year time period ran out prior to the wind tunnel model and model support system being available for testing. However, plans are currently in place to conduct the initial wind tunnel investigation within the next few months. This investigation is directed toward an assessment of the low-speed aerodynamic characteristics of the HWB configuration developed. The configuration developed, designated as the HWB-N2A-exte, is deemed to be capable of meeting
Quick answers
Who was awarded contract NNL11AC16T?
NNL11AC16T was awarded to The Boeing Company by Langley Research Center (National Aeronautics and Space Administration) on June 6, 2011.
How much is contract NNL11AC16T worth?
The government has obligated $68,375 on NNL11AC16T. Its current value, with exercised options, is $70,636.
Is contract NNL11AC16T an order under another contract?
Yes. NNL11AC16T is a delivery order under NNL10AA05B, an indefinite delivery contract.
Was contract NNL11AC16T competed?
The extent of competition for NNL11AC16T was full and open competition. The government received 1 offer.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award