Task order is issued to activate 1553 bus communications within the existing 68040 rfcs.statement of work activate 1553 bus communications within the existing 68040 rfcs NND08BO09T modify the 68040…

Ended Awarded Last action

Contract number
NND08BO09T
Awardee
Awarding agency
Obligated
$1,597,516

Award facts

Contract value 79% obligated
$2,014,908.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
Not on record
Set-aside
No set-aside
Competition
Not Competed · 1 offer Negotiated Proposal / Quote
Pricing
Cost Plus Fixed Fee
Place of performance
St. Louis, MO 63166, USA

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Other Administrative Action 17 · Activate 1553 bus communications $7,793
Close Out 16 · SAP purchase requisition: N/a -$12,477
Supplemental Agreement for work within scope 15 $0
Supplemental Agreement for work within scope 14 · Modification to extend the POP through april 16, 2013. $0
Supplemental Agreement for work within scope 13 · Modification to extend the POP through april 16, 2012. $0
Supplemental Agreement for work within scope 12 · The purpose of this modification is to extend the period of performance. $0
Supplemental Agreement for work within scope 11 · MOD 11 - issued to extend the POP through july 31, 2011. $0
Supplemental Agreement for work within scope 10 · The purpose of this modification is to extend the period of performance thrpugh march 31, 2011. There is no change in the estimate cost or fixed fee. $0
Definitize Change Order 9 · This modification is issued to definitize the continuous effort under previous MOD # 8 and authorize the additional effort under task order NND08BO09T for… $0
Change Order 8 · Task 7, under NND08BO09T will support the NASA flight readiness review (FRR). The contractor will be required to supply information to NASA for use by the FRR… $0
Other Administrative Action 7 · Extend period of performance through march 31, 2010 $0
Other Administrative Action 6 $0
Other Administrative Action 5 · SAP purchase requisition: $0
Other Administrative Action 4 · The purpose of this modification is to extend the period of performance for the cost plus fixed fee task order no. NND08BO09T through september 30, 2009. $0
Supplemental Agreement for work within scope 3 $0
Other Administrative Action 2 $0
Definitize Change Order 1 $125,152
Original award $1,477,047
Show all 18

Description

Task order is issued to activate 1553 bus communications within the existing 68040 rfcs.statement of work activate 1553 bus communications within the existing 68040 rfcs NND08BO09T modify the 68040 rfcs computers to enable 1553 bus communications to and from the rfcs control laws. Minimize the round-trip time delay to and from an external H/W component (ARTS III) with a standard 1553B interface. Task 1 identify H/W interface changes required identify the H/W changes required to implement a MIL-spec 1553B (using existing spare pins, or an additional MIL-spec connector) on the F/a-18 G-4 FCC chassis and internal cabling from the connector to the 68040 rfcs 1553 interface. Identify any additional environmental qualification (if required) by the modification. Task 2 enable 1553 bus communication support develop and document the device driver software layer. Modify the rfcs ADA S/W to enable operation of the 1553B in concert with the rfcs control laws. Complete a trade study to determine if the 68040 should be a bus-controller or a remoteterminal in order to minimize the round-trip time delay to and from an ARTS III. Provide software and development documentation to NASA for the 1553 modification. Task 3 test the 1553 bus communications to and from the rfcs test the modified FCC H/W to verify identical performance to the production control laws, and verify the operation of the 1553 within the rfcs. Validate the performance of the control laws in the boeing hils environment. Provide documentation to NASA of the verification and validation results. Task 4 support NASA ground and flight tests of the 1553 bus to and from the 68040 rfcs provide engineering support and/or consultation as needed for ground and flight evaluation of the 1553 interface to and from the 68040 rfcs. Assumptions: dual bus design. Standard 1553B bus protocol. 128 parameters passed between the 68040 rfcs and the ARTS III over the 1553 at 160 HZ. Approximately 16 parameters will be passed through the rfcs ccdl for voting and redundancy. Government furnished property (GFP): flight control computer (FCC) hardware to be provided 2 months after ATP. Airborne research test system (ARTS) II or ARTS III computer will be provided 2 months after ATP. Any interface equipment and documentation for said equipment to support ARTS computer operation for test and evaluation purposes will be provided 2 months after ATP.

Quick answers

Who was awarded contract NND08BO09T?

NND08BO09T was awarded to The Boeing Company by Armstrong Flight Research Center (National Aeronautics and Space Administration) on January 17, 2008.

How much is contract NND08BO09T worth?

The government has obligated $1,597,516 on NND08BO09T. Its current value, with exercised options, is $2,014,908.

Is contract NND08BO09T an order under another contract?

Yes. NND08BO09T is a delivery order under NND07AA08B, an indefinite delivery contract.

Was contract NND08BO09T competed?

The extent of competition for NND08BO09T was not competed. The government received 1 offer.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award