A/e bridge inspections - NWS yorktown VA, NSWC dahlgren VA and navsuppact norfolk VA. Tasking field inspection: the a-e shall perform bridge inspections in accordance with the navy requirements…
Ended Awarded Last action
- Contract number
- 0013
- Awardee
-
Alfred Benesch & Co UEI GEYJN659GK66
- Awarding agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Obligated
- $51,205
Award facts
- Contract value 100% obligated
- $51,205.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 541330 Engineering Services
- Set-aside
- Total Small Business
- Competition
- Full and Open Competition after exclusion of sources · 1 offer Architect-Engineer FAR 6.102
- Pricing
- Firm Fixed Price
- Place of performance
- Chicago, IL 60601, USA
- Legislative mandates
-
- Service Contract Act FAR subpart 22.10
Award details come from SAM.gov/FPDS.
Description
A/e bridge inspections - NWS yorktown VA, NSWC dahlgren VA and navsuppact norfolk VA. Tasking field inspection: the a-e shall perform bridge inspections in accordance with the navy requirements described in reference (a). In cases where there are no specific navy requirements, the work shall meet the minimum requirements of the nbis (reference b). The inspection type required for each structure is listed in the bridge schedule . The a-e shall inspect and determine the structural condition of all bridge components including fracture critical details when applicable. In addition, the a-e shall document any completed repairs and note any conditions that have changed since previous inspection reports. All components will require an arm s length visual inspection using simple tools, measuring devices, and recording methods. The a-e shall be responsible for providing all access equipment. During routine inspections, the inspection team must verify all data, correct inconsistencies, and/or update the data on the SI & a form. Underwater inspection: during the inspection of submerged bridge elements, the a & e shall check foundations for scour and undercut and use soundings, visual inspection, and probing to determine extent. Underwater inspections shall be accomplished in accordance with the requirements for level i, II, and III (if warranted) inspections described in reference (c). Findings shall be included with the topside inspection report. Diving operations shall be conducted in accordance with the EM-385-1-1, section 30, contract diving operations (reference d). The underwater inspection shall be led by a bridge inspection team leader who shall conduct a minimum of fifty percent of the diving inspection work. A dive plan shall be submitted to the navy for review at least three weeks prior to mobilization. The dive plan requirements can also be found in reference (d). Scour assessment: during the inspection process, the a-e shall obtain all pertinent data required to determine if a full scour analyses is warranted. Soundings of the channel bottom shall be taken around each of the substructure units across the channel, along the upstream and downstream fascias of the structure at a minimum. If deemed necessary at the time of inspection, additional soundings should be taken along lines parallel to the upstream and downstream fascias. Seismic assessment: during the inspection process, the a-e shall obtain all pertinent data required to determine if a full seismic analyses is warranted based on current seismic requirements for the state or governing region. Bridge inspection report: bridge inspection reports will be created utilizing inspecttech software, the navy s bridge report generation utility. The a & e will populate all fields as applicable. Structural inventory and appraisal (SI & a) sheet: the SI & a sheet shall be created using the inspecttech software and shall contain all items required by fhwa in the latest edition of reference (c). The SI & a shall include all related measurements in units of meters. Item 16 (latitude) and ITEM17 (longitude) shall be in units of degrees, minutes, and seconds to the nearest hundredth of a second using GPS methods. Information on average daily traffic (ADT) must be provided. SI & a data shall be checked with the latest version of the fhwa edit/ update program and corrections to the data made before submittal.
Quick answers
Who was awarded contract 0013?
0013 was awarded to Alfred Benesch & Co by Naval Facilities Engineering Command (Department of the Navy) on April 11, 2013.
How much is contract 0013 worth?
The government has obligated $51,205 on 0013.
Is contract 0013 an order under another contract?
Yes. 0013 is a delivery order under N6258312D0704, an indefinite delivery contract.
Was contract 0013 competed?
The extent of competition for 0013 was full and open competition after exclusion of sources. The government received 1 offer. It was set aside: Total Small Business.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award