<p>The Department of the Navy Naval Facilities Engineering Command (DOD - Navy) awarded a $964,800.95 firm fixed price delivery order contract to CCI Prime Contractors, LLC for repair of hot water piping at Building B92 in Kittery, Maine. The contract has a period of performance starting June 2nd, 2022 through February 28th, 2023. No subcontractors were identified. The delivery order is for repair services to the existing hot water piping infrastructure at the specified building location.</p>
This is a firm fixed-price definitive contract awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command Northeast Region (MICC Fort Sam Houston) to Sandow Construction Inc., a Small Business Administration (SBA) certified 8(a) Program Participant and HUBZone firm. The $1,771,520.00 contract is to repair the boiler in Building 357 at Fort Belvoir, Virginia. The project involves demolishing the existing inoperable steam boiler and replacing it with two...
This is a firm-fixed price purchase order awarded by the Air National Guard to Colonie Mechanical Contractors, Inc. for the repair of a hot water pipe in Building 2A. The contract has a total ceiling value of $9,600.00 and a completion date of August 1, 2024. The contract was set aside for small businesses. The work involves providing all material, labor, equipment, and supervision required to complete the repair, as detailed in the Statement of Work. This contract was issued under a competitive...
The Department of the Navy Naval Facilities Engineering Command awarded Duwright Construction Inc. a $738,510 firm fixed price delivery order to remove and replace heating, hot water, and domestic water boilers at Building 534 located at Camp Pendleton North in California. The work will be performed under the contract between September 30, 2021 and September 30, 2022. The Naval Facilities Engineering Command is responsible for planning, designing, building, and maintaining the infrastructure and...
The Department of the Navy Installations Command awarded a $433,965.03 firm fixed price delivery order to CCI Mechanical, LLC of Pensacola, Florida. The order calls for CCI Mechanical to replace the hot water tank and associated piping in Building 3902 at a Navy installation located in Pensacola. No set-aside designation was applied to this award. Work is to be completed by May 2, 2022. As a SBA Certified 8(a) Program Participant, CCI Mechanical will leverage their experience supporting Navy...
This is a $140,300.53 Firm Fixed Price delivery order contract awarded by the Navy Installations Command (NAVFAC) to Pearl Construction Enviroment Al Service Inc., a Service-Disabled Veteran-Owned Small Business. The contract is for the replacement of hot water lines in buildings B34 and B6 at Andersen Air Force Base in Guam. It is a task order under the NAVFAC Marianas Construction Maintenance and Repair 2016-2021 multiple award contract vehicle. The contract has a completion date of June 5,...
The United States Marine Corps Air Ground Combat Center awarded a $266,903 firm fixed price delivery order to Paradigm Mechanical Corp. for repair of underground high temperature hot water piping at Building 1815 on the Twentynine Palms Marine Corps base in California. As the prime contractor, Paradigm Mechanical will perform repairs to the underground piping system serving the specified building, with work expected to be completed by September 20th, 2021. The funding for this delivery order...
The Department of the Air Force Air Combat Command (Department of Defense - United States Air Force) awarded a $603,095 definitive contract to Dominguez Design-Build Inc. to repair the water heater system with passive solar hot water heat at the Shellbank Gym located at 210 Sweeney Blvd in Hampton, Virginia. The firm fixed price contract runs from July 28, 2022 to July 21, 2023 and requires Dominguez Design-Build Inc. to provide repair services for the existing water heater system and...
The Department of the Navy Naval Facilities Engineering Command awarded a $1,047,683.56 firm fixed price delivery order to Time Led Development, LLC for work replacing the boiler system at Building 860 in Yuma, Arizona. The prime contractor will perform the work under contract WO 9088561 from September 2020 through September 2021 to replace the boiler system at the specified Navy facility location. No additional details were provided regarding subcontractors or the Navy's specific programs in...
<p>The Department of the Navy Installations Command awarded a $789,036.02 firm fixed price delivery order contract to CCI Mechanical, LLC for the replacement of the boilers at Building 3905 located in Pensacola, Florida. As the prime contractor, CCI Mechanical, LLC Division will provide all necessary labor, materials, equipment and supervision to remove and replace the existing boilers. The period of performance is from September 12, 2022 through June 26, 2023.</p>