Option II

Ended Awarded Last action

Contract number
0016
Awardee
Awarding agency
Obligated
$10,589,042

Award facts

Opportunity
Contract value 100% obligated
$10,589,042.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Contracting staff
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z1JZ Maintenance Of Miscellaneous Buildings
Set-aside
No set-aside
Competition
Full and Open Competition after exclusion of sources Two Step
Pricing
Firm Fixed Price
Place of performance
Bethesda, MD 20814, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order 26 · Option II deduct for damaged ceiling panels -$52,076
Change Order 25 · Low point drain, dry pipe system and CO controller $130,189
Change Order 24 · USU sprinklers and fire alarm $251,589
Change Order 23 · Sprinkler and fire alarm system replacement at USU. The reason for this modification is to provide installation of of a dry pipe above the metal slat ceiling… $148,545
Change Order 22 · Sprinkler and fire alarm at USU. The reason for this modification is to include testing of fire alarms inside elevators that was missed in original RFP. The… $9,258
Change Order 21 · Replacement of sprinkler and firer alarm at USU. The reason for this modification is to include the prime contractor's general condition due to several… $103,747
Change Order 20 · Repair of sprinkler and fire alarm at USU. The purpose of this modification is to incorporate several changes due to unforeseen and design deficiency. (1)… $95,653
Change Order 19 · Fire and sprinkler alarm at USU. The reason for this modification is to include changes due to unforeseen conditions. (1) replace the bird netting in the VIP… $72,447
Change Order 18 · Fire alarm at USU. The reason for this modification is to firewatch for safety requirement and time extension due to delay. $84,866
Other Administrative Action 17 · Option II time extension $0
Change Order 16 · Fire alarm and sprinklers repairs at USU.the reason for this modification is to include temporary removal and RE-installation of metal slat ceiling between… $78,713
Change Order 15 · Fire and sprinkler alarm at USU. The reason for this modification is to replace rusted pipes of the existing dry-pipe system in the loading dock area and repair… $83,998
Change Order 13 · Fire and sprinkler repair at USU. The reason for this modification is to definitize MOD 07- use of overtime to conduct acceptance testing $9,964
Change Order 12 · Fire and sprinkler alarm at USU. The reason for this change is to incorporate (1) installation of smokes, relays, and monitoring modules in the MRI room and (2)… $84,630
Change Order 11 · ,MDL lab and cafeteria, update backgrounds and installation, USU, bethesda, MD $79,577
Change Order 10 · Replace fire and spinkler system at USU. The reason for this modification is for (1) fire alarm monitoring of additional fire alarm devices, (2) addition of… $53,262
Change Order 9 · Replace fire alarn and sprinkler alarm at USU. The reaosn for this modification is to replace pre-action panel in computer room and allow fire alarm system to… $136,988
Change Order 8 $147,918
Change Order 7 · , overtime for fire alarm acceptance testing. $8,695
Change Order 6 · Sprinkler and fire alarm at USU. The reason for this modification is to include unforseen conditions. (1) install temporary message for testing of building D… $42,725
Change Order 5 · USU fire alarm repairs. The reason for this modification are to accelerate several zones in parking garage areas due to safety issues and to redesign pre-action… $119,401
Change Order 4 · This modification is issued to address various design deficiencies with the design of the sprinkler pipe in various areas of USU $624,801
Change Order 3 · This modification will provide for the redesign and installation of additional strobe devices throughout the USU campus. $250,340
Change Order 2 · Add an additional of 11 zones to meet fire protection's code. $849,587
Change Order 1 · Contractor will remove and replace two nonfunctional sprinkler system isolation valves. $2,712
Original award $7,171,513
Show all 26

Quick answers

Who was awarded contract 0016?

0016 was awarded to Corinthian Contractors Inc. by Naval Facilities Engineering Command (Department of the Navy) on September 29, 2012.

How much is contract 0016 worth?

The government has obligated $10,589,042 on 0016.

Is contract 0016 an order under another contract?

Yes. 0016 is a delivery order under N4008010D0497, an indefinite delivery contract.

Was contract 0016 competed?

The extent of competition for 0016 was full and open competition after exclusion of sources.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award