Delivery Order INF14PC00043-INF14PD00861

Award Date 5/1/14
Potential Completion Date 12/1/16
Potential Value $65K
Awardee
CTA Inc.
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Starbuck, WA 99359, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
1
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
Kpff Consulting Engineers was awarded an $87,940 firm fixed price delivery order for architectural and engineering services to repair or replace the existing head tank structure at the Lyons Ferry Fish Hatchery. The work will be performed under the Department of the Interior Fish and Wildlife Service Region 1 indefinite delivery/indefinite quantity contract vehicle, with no set-aside designation applied. Kpff will provide the requested A&E services to the Fish and Wildlife Service at the...
<p>This is a firm-fixed-price definitive contract awarded by the U.S. Department of the Interior (DOI) Fish and Wildlife Service Region 1 to Contractor Services Group, Inc., a minority-owned, small disadvantaged business. The $137,271.82 contract is for the Lyons Ferry Spawning Facility project, with a completion date of November 1, 2016. The contract has no set-aside designation. The contract is being performed in Starbuck, Washington.</p>
The Department of the Interior Fish and Wildlife Service awarded a $2.2 million firm fixed price construction contract to Seabee Construction, LLC to renovate asphalt paving at the Lyons Ferry Fish Hatchery in Starbuck, Washington. The work involves removing existing asphalt and base rock in designated areas and installing a new asphalt section by November 1, 2021 to match existing grades, as requested in Solicitation 140F0321R0001. This acquisition was set aside solely for small businesses...
Kpff Inc., doing business as Kpff Consulting Engineers, has been awarded a $148,161 firm fixed price delivery order against an unspecified multiple award contract vehicle to provide construction services for the WA-LYONS FERRY MARMES MCC BUILDING. The project is located in Starbuck, Washington and has a completion date of March 31, 2022. The award was issued by the U.S. Department of the Interior Fish and Wildlife Service Region 3 on February 18, 2021, with no set aside designation specified....
The Department of the Interior Fish and Wildlife Service Region 1 awarded a $795,560 firm fixed price delivery order contract to Wickham Pipeline Construction, doing business as Wickham Enterprises, to replace the Lyons Ferry Fish Hatchery Square 1 building in Starbuck, Washington. As the prime contractor, Wickham Enterprises will replace the existing structure with a new building at the fish hatchery facility over a seven-month period ending in November 2020. The funding agency, the DOI Fish...
The Department of the Interior Fish and Wildlife Service Region 3 awarded a $259,177 firm fixed price contract to M.J. Hughes Construction, Inc. to design and build a replacement catwalk at the Little White Salmon National Fish Hatchery in Bingen, Washington. The solicitation sought these services to replace an existing structure and oversee the project, with a period of performance from September 2021 through September 2022. Designated as a total small business set-aside under NAICS code 237990...
This is a time and materials delivery order awarded by the Department of the Interior Fish and Wildlife Service Region 1 to Burton Construction, Inc., a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business. The contract is for emergency electrical repairs at the Lyons Ferry Fish Hatchery facility located in Starbuck, Washington. The potential value of the contract is $584,350.24 and the completion date is September 30, 2019. The contract is not...
This is a federal contract awarded by the U.S. Department of the Interior Fish and Wildlife Service Region 1 to Burton Construction, Inc., a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business. The contract, valued at $269,376.64, is for the installation of an irrigation system at the Lyons Ferry Fish Hatchery in Starbuck, Washington. The contract was issued as a Delivery Order and has a Firm Fixed Price pricing type. It has a total small...
This federal contract award is for architectural and engineering (A/E) design services to rehabilitate the main production water intake and replace the barrier weir on the Little White Salmon River for the Willard National Fish Hatchery. The contract was awarded to Bratslavsky Consulting Engineers, Inc., a small business engineering firm, and has a ceiling value of $539,145.81. It is a delivery order under the Department of the Interior (DOI) Architecture and Engineering Services Multiple...
This firm-fixed-price delivery order was awarded by the U.S. Department of the Interior (DOI) Fish and Wildlife Service Region 6 to Hardrives Construction Inc., a minority-owned, self-certified small disadvantaged business. The $208,695 contract provides design/build services for the seismic rehabilitation and building envelope rehabilitation of the existing hatchery building at the Creston National Fish Hatchery in Kalispell, Montana. The project is funded through the American Recovery and...
  • INF14PC00043
    Indefinite Delivery Contract
  • INF14PC00043-INF14PD00861
    Delivery Order

DESIGN FISH CROWDER AND LIFT AT LYONS FERRY FH

Posted 5/1/14, 12:00 AM