Delivery Order FA872004D0005-0004
- This contract award to The Boeing Company's Legacy Wichita Division, doing business as Boeing, is a delivery order under the Mission Planning Enterprise Contract I (MPEC) managed by the U.S. Air Force's Electronic Systems Center. The $150,190.33 cost-plus-fixed-fee contract provides mission planning, engineering services, maintenance, modifications, repairs, and overhauls for the Air Force's bomber fleets, including the B-52 Stratofortress and B-1 Lancer. As a major defense contractor, Boeing...
- The Boeing Company's Legacy Wichita Division was awarded a $5.68M delivery order on May 12, 2025, for B-1 Lancer and B-52 Stratofortress engineering services, with performance completion scheduled for September 22, 2027. This cost-plus-fixed-fee contract is funded by the Oklahoma City Air Logistics Complex, a division of the U.S. Air Force Materiel Command, with work to be performed in Oklahoma City, Oklahoma. The contract carries no set-aside designation and reflects Boeing's established role...
- The Boeing Company's Legacy Wichita Division was awarded a delivery order valued at $18.5M by the Oklahoma City Air Logistics Complex, a component of the U.S. Air Force Materiel Command, for B-1/B-52 engineering services. This cost-plus-fixed-fee contract, awarded January 30, 2026, extends through July 30, 2027, and carries no set-aside designation. The work encompasses a range of technical services supporting the B-1 Lancer and B-52 Stratofortress strategic bomber aircraft, including...
- The Boeing Company's Legacy Wichita Division was awarded a $2.88 million delivery order by the Oklahoma City Air Logistics Complex, a U.S. Air Force Materiel Command division, for B-1 Lancer and B-52 Stratofortress engineering services. This cost-plus-fixed-fee contract, with a completion date of September 9, 2026, carries no set-aside designation and represents Boeing's continued role as a critical partner in sustaining the U.S. Air Force's strategic bomber fleet. The work encompasses recurring...
- The Boeing Company's Legacy Wichita Division received a $18.8M delivery order award from the Oklahoma City Air Logistics Complex, a U.S. Air Force Materiel Command facility, for Option Year VII recurring services with a completion date of December 31, 2026. This fixed-price-incentive contract represents continuation of ongoing engineering and sustainment support for strategic bomber aircraft platforms, including the B-1 Lancer and B-52 Stratofortress. The award does not utilize a set-aside...
- The Boeing Company's Legacy Wichita Division received a $16.1 million delivery order from the Air Force Life Cycle Management Center (AFLCMC) at Eglin Air Force Base to provide B-1 and B-52 engineering services. Awarded on March 13, 2025, with a completion deadline of August 26, 2028, this cost-plus-fixed-fee contract requires no set-aside designation. The work will be performed in Oklahoma City, Oklahoma, supporting the Oklahoma City Air Logistics Complex's mission to sustain and upgrade the...
- The Boeing Company's Legacy Wichita Division received a cost-plus-fixed-fee delivery order valued at $44.1 million from the Oklahoma City Air Logistics Complex for B-1 and B-52 Engineering Services (BBES). The contract, awarded on December 18, 2019, extends through April 30, 2026, and carries no set-aside designation. This delivery order falls under a larger indefinite delivery vehicle arrangement with the Air Force Materiel Command facility, which manages sustainment and modernization efforts...
- The Boeing Company's Legacy Wichita Division has been awarded a delivery order contract valued at $99.7 million for B-1 and B-52 Engineering Services (BBES) through the Oklahoma City Air Logistics Complex, a division of U.S. Air Force Materiel Command. This firm fixed-price delivery order, issued January 1, 2025, extends through December 31, 2028, and represents a continuation of Boeing's critical role in sustaining the U.S. Air Force's strategic bomber fleet. The contract does not utilize a...
- The Boeing Company's Legacy Wichita Division received a delivery order modification from the Oklahoma City Air Logistics Complex (a U.S. Air Force Materiel Command division) to provide engineering services with a ceiling value of $1.39 million. This cost-plus-fixed-fee contract, awarded August 3, 2012, was modified to revise the period of performance, with ultimate completion targeted for January 11, 2014. The work was performed in Wichita, Kansas, supporting the Air Force's strategic bomber...
- The Boeing Company's Legacy Wichita Division was awarded a $8.28M delivery order by the Oklahoma City Air Logistics Complex for B-1/B-52 Engineering Services. This cost-plus-fixed-fee contract, with an ultimate completion date of March 26, 2026, supports critical sustainment and engineering activities for the U.S. Air Force's strategic bomber fleet. The award carries no set-aside designation, reflecting Boeing's status as an established large prime contractor. The Oklahoma City Air Logistics...
- FA872004D0005Indefinite Delivery Contract
- FA872004D0005-0004Delivery Order
The Boeing Company's Legacy Wichita Division was awarded a delivery order valued at $109.9 million on September 16, 2005, under the Mission Planning Enterprise Contract I (MPEC) for the Joint Mission Planning System Common Bomber Development program. This cost-plus-award-fee contract, funded by the U.S. Air Force's Electronic Systems Center, supports critical development and engineering activities for bomber mission planning capabilities. The work is to be performed in Oklahoma City, Oklahoma, with an ultimate completion date of June 11, 2012. No set-aside designation was applied to this award, reflecting Boeing's status as an established large prime contractor with the Air Force. This delivery order represents a substantial investment in maintaining and advancing the technological capabilities of the U.S. Air Force's strategic bomber fleet. As part of the broader MPEC vehicle, the contract leverages Boeing's extensive experience in aerospace engineering and defense technology, particularly through its Legacy Wichita Division, which has established itself as a critical partner to Air Force Materiel Command's Oklahoma City Air Logistics Complex. The Joint Mission Planning System Common Bomber Development initiative aligns with the Air Force's strategic modernization efforts, ensuring that critical mission planning systems remain technologically current and operationally effective for the nation's strategic aviation assets.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1F | Other Administrative Action | $0 | 8/16/23 | |
| 1M | Other Administrative Action | ($267) | 4/24/18 | |
| 1L | Other Administrative Action | ($169k) | 4/27/17 | |
| 1K | Funding Only Action | ($247k) | 9/22/16 | |
| 1J | Supplemental Agreement for work within scope | ($191k) | 9/29/15 |