Delivery Order FA821421D0001-FA821421F0015
- Not listed
- Northrop Grumman Systems Corporation's Propulsion Systems - Promontory Division was awarded a delivery order valued at $8.37 million by Air Force Materiel Command on September 29, 2021, for repair services on Minuteman III igniter safe and arm devices. This delivery order falls under the Propulsion Subsystem Support Contract (PSSC) 2.0, which provides comprehensive engineering, software, and maintenance services for the Minuteman III intercontinental ballistic missile propulsion subsystem. The...
- Northrop Grumman Systems Corporation, through its Propulsion Systems - Promontory Division, was awarded a delivery order valued at $311.5 million on May 4, 2021, by the Air Force Materiel Command to provide engineering, software, and maintenance services for the Minuteman III intercontinental ballistic missile propulsion subsystem. The contract encompasses sustainment, modification, development, test and evaluation, procurement, production, repair, and refurbishment activities for the propulsion...
- The U.S. Air Force Materiel Command awarded a delivery order valued at $3.21M to Northrop Grumman Systems Corporation's Propulsion Systems - Promontory Division for repair services on the Minuteman III Guided Missile Safe and Arm Test Set (GMSATS) under the Propulsion Subsystem Support Contract (PSSC) 2.0 program. This delivery order, issued September 29, 2021, with an ultimate completion date of March 28, 2026, operates on a cost-plus-fixed-fee pricing structure and carries no small business...
- Northrop Grumman Systems Corporation was awarded a $8.98 million delivery order by Air Force Materiel Command on September 30, 2025, to develop predictive capabilities for assessing the functional life and failure risks of Minuteman III Stage 1 motors containing propellant grain cracks. The contract, which carries a cost-plus-fixed-fee pricing structure with no set-aside designation, extends through September 29, 2026, and will be performed at the company's Propulsion Systems - Promontory...
- This federal contract award, valued at $2,535,573.00, was issued by the Air Force Materiel Command to Northrop Grumman Systems Corporation's Propulsion Systems - Promontory division for Minuteman III missile digital engineering services. The contract is a cost-plus-fixed-fee delivery order with an ultimate completion date of April 30, 2025. Northrop Grumman Systems Corporation, the parent company, is a major defense contractor that frequently secures federal contract awards, including several...
- Northrop Grumman Systems Corporation's Propulsion Systems - Promontory Division has been awarded a delivery order valued at approximately $4.44 million by the Air Force Materiel Command for PSSC support equipment. This delivery order, with an ultimate completion date of September 29, 2026, employs a cost-plus-fixed-fee pricing structure and is not subject to any set-aside designation, reflecting the contractor's established technical capability. The work will be performed at the company's...
- The U.S. Air Force Materiel Command has awarded Northrop Grumman Systems Corporation a $53.5 million delivery order for the Missile Transporter Acquisition Program under the Ground Subsystems Support Contract 2.0 Indefinite Delivery/Indefinite Quantity (IDIQ) agreement. The contract, issued on December 10, 2025, will be performed in Roy, Utah, with completion targeted for July 6, 2030. This delivery order is structured as a Cost Plus Fixed Fee contract with no small business set-aside...
- This federal contract award was issued by the Air Force Materiel Command to Northrop Grumman Systems Corporation, Propulsion Systems - Promontory Division, for a Delivery Order worth up to $4,960,766.00. The contract is a Cost Plus Fixed Fee arrangement with an ultimate completion date of July 1, 2025. It covers engineering services, software development, maintenance, and production of specialized materials and components for various defense programs, particularly the Minuteman III...
- This is a cost-plus-fixed-fee delivery order awarded by the Air Force Materiel Command to Northrop Grumman Systems Corporation's Propulsion Systems - Promontory Division, doing business as Propulsion Systems-Promontory. The $6,723,040.00 contract is for the Minuteman III Stage 1 and 2 Motor Washout under the PSSC 2.0 task order, with a period of performance ending on September 30, 2024. The order was awarded on September 1, 2023 and does not have a set-aside designation. Northrop Grumman Systems...
- Northrop Grumman Systems Corporation's Strategic Deterrent Systems Division was awarded a delivery order valued at $30.3 million on September 1, 2021, to provide engineering and technical representative services in support of the Ground Minuteman Automatic Test System (GMATS) at Hill Air Force Base, Utah. The contract employs a Cost Plus Award Fee pricing structure with an ultimate completion date of August 31, 2026, and is funded by the Air Force Materiel Command. This delivery order does not...
- FA821421D0001Indefinite Delivery Contract
- FA821421D0001-FA821421F0015Delivery Order
Northrop Grumman Systems Corporation's Propulsion Systems - Promontory Division was awarded a delivery order valued at $5.47M by Air Force Materiel Command for repair services on the Minuteman III Missile Arm/Disarm Safe and Arm Switch as part of the propulsion subsystem support contract. The award, issued September 29, 2021, with an ultimate completion date of September 28, 2026, utilizes a cost-plus-fixed-fee pricing structure with no set-aside designation. Work will be performed at the contractor's facility in Corinne, Utah. This delivery order represents a task against Northrop Grumman's substantial $2.311 billion Indefinite Delivery Vehicle contract with Air Force Materiel Command, which runs through November 2039 and provides comprehensive engineering, software, and maintenance services for the Minuteman III intercontinental ballistic missile propulsion subsystem. The award reflects Air Force Materiel Command's ongoing sustainment strategy for the aging Minuteman III fleet, which remains a critical component of the U.S. strategic nuclear deterrent. Northrop Grumman's Propulsion Systems - Promontory Division has established itself as the primary technical authority for Minuteman III propulsion support, leveraging specialized expertise in energetic materials, rocket motor components, and complex missile system repair and diagnostics. The repair work on the safe and arm switch mechanism—a critical safety-enabling component—underscores the technical complexity and national security significance of maintaining this legacy weapons system through specialized contractor support.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Propulsion Subsystem Support Contract (PSSC 2. 0) | FA8214-20-R-7000 | Department of the Air Force Materiel Command Nuclear Weapons Center | Solicitation 2/4 | 5/28/20, 5:56 PM | |
Propulsion Subsystem Support Contract (PSSC 2. 0) | FA8214-20-R-7000 | Department of the Air Force Materiel Command Nuclear Weapons Center | Pre-Solicitation 1/4 | 5/13/20, 4:05 PM | |
Propulsion Subsystem Support Contract (PSSC 2. 0) | FA8214-21-D-0001_Justification | Department of the Air Force Materiel Command Nuclear Weapons Center | Limited / Sole Source Justification 4/4 | 5/6/21, 2:32 PM | |
Propulsion Subsystem Support Contract (PSSC 2. 0) | FA8214-21-D-0001 | Department of the Air Force Materiel Command Nuclear Weapons Center | Award Notice 3/4 | 5/5/21, 12:20 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00005 | Exercise an Option | $903.2k | 8/27/25 | |
| P00004 | Other Administrative Action | $912.7k | 8/16/24 | |
| P00003 | Exercise an Option | $898.2k | 4/17/23 | |
| P00002 | Funding Only Action | ($50k) | 12/13/22 | |
| P00001 | Exercise an Option | $904.9k | 6/8/22 |