Delivery Order FA821415D0002-0001
- Not listed
- The Department of the Air Force Materiel Command awarded a $60,076,503.64 cost-plus-award-fee delivery order contract to The Boeing Company to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. As the original equipment manufacturer, Boeing will leverage its technical expertise to conduct maintenance, repair, and upgrades on the missile's avionics and flight control components at its facility in Heath, Ohio. This delivery order is part of a larger...
- The Boeing Company's Defense, Space & Security Division received a delivery order valued at $124.1 million from Air Force Materiel Command to repair the guidance subsystem on Minuteman III intercontinental ballistic missiles. This delivery order is a child contract under Boeing's larger Indefinite Delivery Contract with the Air Force, which carries a total value of $2.414 billion for Minuteman III missile guidance subsystem sustainment through 2045. The contract utilizes a Cost Plus Award...
- This is a $68,148,804.61 cost-plus-award-fee delivery order contract awarded by the Nuclear Weapons Center, an agency of the U.S. Department of Defense, to The Boeing Company for the repair of the guidance subsystem of the Minuteman III intercontinental ballistic missile. The contract has an ultimate completion date of September 27, 2020 and was awarded on September 28, 2019. This contract is part of a larger Indefinite Delivery Vehicle (IDV) worth $2.414 billion that Boeing holds with the Air...
- The Boeing Company's Defense, Space & Security Division received a delivery order valued at $118.5 million from Air Force Materiel Command to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. This cost-plus award fee contract, with an ultimate completion date of September 27, 2021, was awarded on September 28, 2020, with no small business set-aside designation. Work will be performed at Boeing's facility in Heath, Ohio, where the company specializes in...
- This is a cost-plus-fixed-fee delivery order contract awarded by the U.S. Air Force Nuclear Weapons Center to The Boeing Company for the repair of the guidance system of the Minuteman III intercontinental ballistic missile (ICBM) weapon system. The contract has a ceiling value of $947,749.00 and a period of performance through December 31, 2018. The contract is not set aside for any small business designation. Boeing, the prime contractor, frequently collaborates with subcontractors Northrop...
- This contract was awarded by the Air Force Materiel Command, a defense agency, to The Boeing Company to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. The $54,442,160.94 cost-plus-award-fee contract has a completion date of September 27, 2019 and does not utilize a small business set-aside. Boeing, as the prime contractor, frequently collaborates with subcontractors like Northrop Grumman Systems Corporation and Lockheed Martin Corporation. This contract is...
- The U.S. Air Force Materiel Command awarded The Boeing Company a delivery order valued at approximately $41.2M for Intercontinental Ballistic Missile (ICBM) guidance repair and award fee payment under the Minuteman III Guidance Replacement Program (GRP). This Major Defense Acquisition Program focuses on maintaining and upgrading guidance systems for the LGM-30 Minuteman III intercontinental ballistic missile system, a critical component of the U.S. nuclear deterrent force. The contract, which...
- The Air Force Materiel Command awarded The Boeing Company, Defense, Space & Security Division a delivery order valued at $3.17M on May 28, 2009, for repair and provisioning of guidance system components for the Minuteman III intercontinental ballistic missile (ICBM). This contract falls under the Minuteman III Guidance Replacement Program (GRP), a Major Defense Acquisition Program (MDAP) focused on maintaining and upgrading guidance systems for the LGM-30 Minuteman III, a critical element of...
- The U.S. Air Force Materiel Command awarded a $5,137,725.00 cost-plus-fixed-fee delivery order contract to The Boeing Company's Defense, Space & Security Division to update the Central Data Assessment System that supports the guidance system of the Minuteman III intercontinental ballistic missile. This order is not associated with a set-aside program and is scheduled for completion by September 27, 2041. Boeing, a major defense contractor, frequently collaborates with subcontractors like...
- This is a firm-fixed-price delivery order awarded by the Air Force Materiel Command to The Boeing Company, a major defense contractor, for the repair and maintenance of Minuteman III Intercontinental Ballistic Missile (ICBM) Missile Guidance Set (MGS) trainers in the second year of the contract. The total ceiling value of the award is $31,322.64, with an ultimate completion date of October 31, 2025. This award is not associated with a set-aside designation. The Boeing Company, through its...
- FA821415D0002Indefinite Delivery Contract
- FA821415D0002-0001Delivery Order
This firm-fixed-price delivery order, awarded by the Air Force Materiel Command, repairs the missile guidance set of the Minuteman III intercontinental ballistic missile (ICBM) for the U.S. Air Force. The $58,449,300.00 contract was awarded to The Boeing Company's Defense, Space & Security division on June 3, 2015, with a final completion date of September 27, 2016. This work is part of a larger Indefinite Delivery Vehicle (IDV) contract, valued at up to $2.4 billion, that covers the repair and sustainment of the Minuteman III missile guidance subsystem through 2039. The contract does not have a set-aside designation. Boeing frequently collaborates with subcontractors like Northrop Grumman and Lockheed Martin to deliver comprehensive solutions for the Air Force's nuclear deterrence objectives by maintaining mission capability for the aging ICBM system.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Guided Missiles | FA8214-15-R-1234 | Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base | Award Notice 1/1 | 6/17/14, 10:20 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 3 | Close Out | $5.6m | 1/26/17 | |
| 2 | Funding Only Action | ($1m) | 6/17/16 | |
| 1 | Funding Only Action | $30.2m | 1/25/16 | |
| Not listed | Not listed | $22.7m | 6/3/15 |