Wild rice river structure.

Ended Definitive Contract Awarded Last action

Contract number
W912ES20C0001
Awardee
Awarding agency
Obligated
$64,739,171

Award facts

Opportunity
Contract value 100% obligated
$64,739,170.78 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Full and Open Competition · 2 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
North River, ND 58102, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00025 · (R-060) adjust the following clins to final quantities: clin 0006AB stripping over 18,000 CY, clin 0020AB bedding B2 over 1,900 CY, clin 0025AB topsoil respread… $370,286
Supplemental Agreement for work within scope A00024 · (R-059) adjust the contract quantities to final quantities for the following: clin 0007, clin 0008AB, clin 0009AB, clin 0023, clin 0049, clin 0050, clin 0072,… -$65,247
Change Order A00022 · (R-066) correct flow calculation equations for the PLC system. $6,439
Change Order A00021 · Revise electrical plans run new conduit add a low flow radar and wire weight mount that relocates and replaces mounts add a wind sensor tower and tower… $235,077
Change Order A00020 · (R-57) change where the stairwells on the east and west side of the river are anchored to. (R-65) reconfigure the PLC/ HMI system and include modbus… $138,410
Change Order A00019 · Direct the contractor to remove and replace turf reinforcing mat and RE-seed areas of the embankment. $448,876
Definitize Change Order A00018 · Definitize reconstruct east berm -$32,451
Change Order P00009 $1,458,800
Change Order A00017 · Stru - control structure/stilling basins $64,749
Change Order A00016 · Decrease the contract quantity to a final quantity for clins 0031AB steel H pile over 50,000 LF and 0032AB steel H pile over 2,000 LF, and add clin 0085 steel… -$271,672
Change Order A00015 · Add R-064 stockpile grading east of the wild rice river, add 243 additional calendar days to the contract. $161,194
Change Order P00008 · Of the not to exceed price prior to submitting a price proposal acceptable to the contracting officer. This contract modification obligates $450,000.00, which… $450,000
Change Order A00014 · This contract is modified to: add 1) R-049 transformer pad-PLC-handrail changes 2) R-050 J-bulb seal changes 3) R-051 installation of survey monitoring points… $229,651
Change Order A00013 · Remove 10.5 inches from the length of the dogging platform. Make the adjustments necessary to ensure the platforms no longer interfere with the gate operation… $28,117
Change Order A00012 · Safety and dogging platform revisions. Additional post tensioning of the longitudinal PT bar. $98,731
Change Order A00011 $147,767
Change Order A00010 $196,724
Change Order P00007 $1,218,824
Change Order A00009 · Stru - control structure/stilling basins -$12,239
Change Order P00006 · This contract is modified to: provide the dewatering bulkheads and lifting beam to replace the girder and panel system that was eliminated under modification… $1,349,571
Change Order A00008 · Multiple revisions and clarifications in design sheets including revision of the bridge beam seats and wire rope openings on the mechanical platform changing… $2,085
Change Order A00007 · This contract is modified to: add two electrical light poles on the east and west abutments, and the changes and additions of embedded electrical conduits to… $50,000
Change Order A00006 · 1) add dovetail slip joints 2) change abutment anchor gallery 3) clarify lifting eye dogging bracket 4) change fall protection frame 5) change control… $23,689
Change Order A00005 · R-029 VEQ for clin 0033AB steel pipe pile (24"X3/4")-over 5,800 LF $48,825
Change Order A00004 · R-015 approach wall joint changes, R-018 transverse ties, R-023 tension hook connector adjustment $27,289
Change Order P00005 · This is the first of a two part modification. This first part removes the dewatering system from the contract and changes the configuration of the dewatering… -$869,781
Change Order A00003 · Internet service to field officeincrease pipe pile capacity & change the pile tip elevation change cast-in-place testing requirements modify the approach wall… $65,674
Change Order P00004 · This contract is modified to: remove the pile load test requirement from the contract and compensate the contractor for any costs incurred to date and impact… -$382,799
Change Order A00002 · This contract is modified to R03-clarify the color of control walls, R05-correct a typo error in an output torque, R09-add structural clarifications to sheet… $23,717
Change Order A00001 · This contract is modified to-extend the sand drain, TOE drain collector pipe, and add a manhole and TOE drain discharge pipe and headwall on the downstream… $80,314
Exercise an Option P00003 · Wild rice river option 1 $663,700
Other Administrative Action P00002 · Funding change modification. $0
Other Administrative Action P00001 · MOD 1 to extend the completion date due to NTP not being issued as solicited. $0
Original award $58,784,850
Show all 34

About this award

The U.S. Army Corps of Engineers (ENDIST St Paul) awarded a definitive contract to Ames Construction, Inc. for the Wild Rice River Structure on November 27, 2019, with a ceiling value of $64.7 million on a firm fixed-price basis.

The contract adjusts final quantities for multiple line items: stripping over 18,000 cubic yards, bedding B2 over 1,900 cubic yards, topsoil respread over 21,000 cubic yards, and seeding in Zones 1 and 3. Place of performance is North River, North Dakota. The ultimate completion date is July 17, 2026.

Quick answers

Who was awarded contract W912ES20C0001?

W912ES20C0001 was awarded to Ames Construction, Inc. by ENDIST St Paul (US Army Corps of Engineers) on November 27, 2019.

How much is contract W912ES20C0001 worth?

The government has obligated $64,739,171 on W912ES20C0001.

Was contract W912ES20C0001 competed?

The extent of competition for W912ES20C0001 was full and open competition. The government received 2 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award