Definitive Contract W912EK25C0013

Award Date 5/16/25
Potential Completion Date 5/12/27
Potential Value $4.6M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Rock Island
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Illinois City, IL 61259, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
2
Legislative Mandate
Walsh Healy Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Army Corps of Engineers - Rock Island District (MVR) awarded a $2,066,324.00 firm-fixed-price contract to CMS Infrastructure LTD., a small business joint venture, for the design, fabrication, and delivery of Fiberglass Reinforced Polymer (FRP) Tainter Valves for Lock 16 on the Upper Mississippi River. The contract was awarded on October 31, 2024, with a completion date of April 24, 2025. The contract was set aside for small businesses and was competed under Lowest Price Technically...
This is a $497,660.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Cpca Manufacturing LLC, doing business as Composite Advantage, for the design, fabrication, and delivery of composite stoplogs and stoplog slots. The contract does not have a set-aside designation. The original solicitation was a Sources Sought/Request for Information notice seeking information from potential offerors with the capability to design, fabricate, and deliver these composite...
This is a firm-fixed price contract awarded by the U.S. Army Corps of Engineers (USACE) to Occi, Inc., a small business manufacturer doing business as Missouri Fabricators, for the fabrication and delivery of replacement tainter valves and ancillary equipment to support navigation and flood control operations at Lock and Dam 2 on the upper Mississippi River. The contract, valued at $1,590,922.30, was set aside for small businesses under NAICS code 332312 for Fabricated Structural Metal...
The U.S. Army Corps of Engineers awarded a $4,278,884.52 firm fixed-price contract to CPK Manufacturing, LLC (doing business as Kenway Composites) for the fabrication of wickets for the Peoria Lock and Dam and LaGrange Lock and Dam in Illinois. The contract has an ultimate completion date of May 5, 2025. This award is associated with a larger Indefinite Delivery Contract (IDC) that Kenway Composites holds with the U.S. Army Corps of Engineers for the Illinois Waterway Project Office, which has a...
This is a $4,014,987.96 definitive firm-fixed-price contract awarded by the U.S. Army Corps of Engineers to Civil Constructors, Inc. for the LOCK 17 SHEETPILE REPAIR project. The contract includes lead paint abatement, concrete demolition and replacement, sheet piling repairs, horizontal and vertical concrete work, handrail replacement, painting, trenching for electrical work, providing kevel rail and checkpost systems, procuring and stockpiling riprap, and site restoration. This requirement was...
This federal contract award was issued by the U.S. Army Corps of Engineers to the prime contractor CPK Manufacturing, LLC (doing business as Kenway Composites) for the fabrication of wickets for the Peoria Lock and Dam and LaGrange Lock and Dam in Illinois. The $3,257,459.00 firm-fixed-price delivery order has a period of performance from January 2022 through September 2023, with the work to be performed in Chelsea, Maine. Kenway Composites is an innovation leader in the design and manufacturing...
This contract was awarded by the U.S. Army Corps of Engineers to Fickett Structural Solutions Inc., a small business subchapter S corporation based in Middleton, Wisconsin. The $172,745.77 firm-fixed-price purchase order is for submittal reviews related to the fabrication of hydraulic steel structures such as miter gates, tainter valves, and roller gates used in locks and dams. The contract is a follow-on to two Indefinite Delivery Contracts (IDCs) previously awarded to Fickett Structural...
The Department of the Army Corps of Engineers awarded a firm-fixed-price definitive contract to Civil Constructors, Inc., a division of Helm Group Inc., to perform guidewall repair work on Lock and Dam No. 15 on the Mississippi River in Rock Island, Illinois. The contract, which was not set aside, has a potential value of $15,556,980.26 and a completion date of September 29, 2021. The contract requires the repair and maintenance of the lock and dam infrastructure to support the Corps of...
This is a $1,847,995.00 firm fixed price contract awarded by the U.S. Army Corps of Engineers to Fabrication Products Inc., a manufacturer of goods and for-profit organization, to fabricate and deliver spillway bulkheads. The contract has a completion date of July 1, 2016 and was set aside for small businesses. Fabrication Products Inc. has been awarded prime contracts by the Corps of Engineers in the past for the fabrication of large steel components for hydropower and flood control...
The Department of the Army Corps of Engineers awarded a $15,237,522.42 firm-fixed-price contract to Mississippi Limestone Corp, a self-certified small disadvantaged business and manufacturer of goods, to provide articulated concrete mattress casting services. The contract, which is a total small business set-aside, supports the Army Corps' channel improvement, flood risk management, and coastal resilience mission activities. The contract work will be performed in Friars Point, Mississippi and...

The U.S. Army Corps of Engineers - Rock Island District (MVR) awarded a $4,617,727.78 Firm Fixed Price (FFP) contract to Cpca Manufacturing LLC, doing business as Composite Advantage, for the design, fabrication, and delivery of Fiberglass Reinforced Polymer (FRP) Tainter Valves for Lock 16 on the Upper Mississippi River. This full and open competition utilized Lowest Price Technically Acceptable (LPTA) source selection procedures, with an anticipated solicitation release date of August 13, 2024. The contract has a 5-year period of performance with an ultimate completion date of May 12, 2027. Cpca Manufacturing LLC is a manufacturer of FRP composite products that has previously provided composite components for flood control infrastructure and repairs to the Army Corps of Engineers.

Generated 8/18/25, 9:44 AM