Other Administrative Action
P00035 · Funding for settlement agreement
$3,000,000
Change Order
P00034 · DE-scope testing and safety loops from the active vehicle barrier requirements
-$31,075
Change Order
P00033 · Install additional 2" PVC underground conduit and electrical hand-holes necessary to complete the pathway for the connection of the active vehicle barrier (AVB)…
$16,242
Supplemental Agreement for work within scope
P00032 · 1) raise two type d suspended light fixtures in cleo open vehicle storage room 207 from 9 FT AFF as designed and installed to highest possible installation…
$57,972
Change Order
P00031 · The contractor shall provide all materials, labor, equipment, and incidental related work to make the final hook up and activate the existing active vehicle…
$93,707
Supplemental Agreement for work within scope
P00030 · Settle request for equitable adjustment 018 for unsuitable soils and drainage issues
$1,175,000
Supplemental Agreement for work within scope
P00029 · 1. The contractor shall provide all materials, labor, equipment, and incidental related work to provide nyloplast yard inlet and 8" ABS piping under the…
$39,250
Supplemental Agreement for work within scope
P00028 · 1. This modification hereby settles request for equitable adjustment (REA) number 017 for the impact of the delay in logging operations at the wallace creek…
$1,911,884
Supplemental Agreement for work within scope
P00027 · 1. Provide electrical modifications for the AVB power at the wilson gate as indicated in the revised electrical drawings ES101, EP601, EP602, and EP603 dated…
$65,070
Supplemental Agreement for work within scope
P00026 · The contractor shall provide all material, labor, equipment, and incidental related work to make the final tie-in to sneads ferry road as detailed in the…
$513,531
Supplemental Agreement for work within scope
P00025 · A. The contractor shall provide all material, labor, equipment, and incidental related work to accomplish all changes included within the amendment 17…
$787,403
Supplemental Agreement for work within scope
P00024 · Box and frame out the exposed HAT channel in the ceiling of the visitor's center building. Add stair railing to the cleo stairs at the rear of the building.
$35,154
Supplemental Agreement for work within scope
P00022 · The contractor shall provide all material, labor, equipment, and incidental related work to provide power to the following intersections with the new base entry…
$480,028
Supplemental Agreement for work within scope
P00021 · This modification hereby settles request for equitable adjustment (REA) number 015 dated october 16, 2015 for increased costs resulting from overrun on…
$2,053,870
Supplemental Agreement for work within scope
P00020 · 1. Add conduit and cameras as required in the drawings provided with RFI-232's response, which is herein incorporated by reference. 2. Shower tile will continue…
$97,415
Supplemental Agreement for work within scope
P00019 · 1. In response to RFI-253, communication line conflict with holcomb blvd. Ditch, install 96 SM FOC and 600 pair cable provided by base telephone per the…
$3,320,756
Supplemental Agreement for work within scope
P00018 · The contractor shall provide all materials, labor, equipment, and incidental related work to incorporate the following corrected drawings into the contract:…
$2,199,750
Supplemental Agreement for work within scope
P00017 · This modification includes 3 changes - adding a floor box for a podium at the cleo, changing the dimensions for the concrete pad for the pre-fabricated guard…
$61,500
Supplemental Agreement for work within scope
P00016 · This modification settles REA #3 for the change in borrow pits after contract award. This modification also includes changes in signalization, undercuts for…
$1,454,145
Supplemental Agreement for work within scope
P00015 · The contractor shall provide all material, labor, equipment, and incidental related work to provide the structural changes as identified on amendment 14 drawing…
$217,329
Supplemental Agreement for work within scope
P00014 · PCO 09 the contractor shall provide all material, labor, equipment, and incidental related work to perform the following: w-4 connection:¿ delete all related…
$270,000
Supplemental Agreement for work within scope
P00013 · This modification provides for 11 changes, including changes to the ramp t waterline tie-in, stone columns at holcomb blvd, fencing at ramp t, incorporate…
$1,135,704
Change Order
P00012 · The contractor shall provide all material, labor, and equipment to: 1. Install cable 47A, 50 pair & 100 pair to exit vault #3 to a connection point already…
$5,551,754
Supplemental Agreement for work within scope
P00011 · Incorporate dcaa rates and settle REA #1 for borrow PIT #8 removal from contract
$4,124,514
Change Order
P00010
$486,575
Change Order
P00009 · The contractor shall provide all material, labor, equipment, and incidental related work to incorporate changes identified in the following: a) incorporate…
$581,111
Change Order
P00008 · PCO 10 the contractor shall provide all material, labor, equipment, and incidental related work to accomplish the w-4 tie-in on the south end of sneads ferry…
$102,276
Other Administrative Action
P00007 · Add classification and wage rate
$0
Other Administrative Action
P00006 · Add additional classification & rate
$0
Exercise an Option
P00005 · Exercise of option item 1 for P1384 work and items contained in volume III, option item 2 foundation piling and option item 3 pile load testing
$20,072,022
Other Administrative Action
P00004 · Add additional classificatin and wage rate
$0
Change Order
P00003 · Modification to lift suspension
$0
Other Administrative Action
P00002 · Suspension of work
$0
Other Administrative Action
P00001 · P1383 and P1384 base entry point and road, phase II and III, MCB camp lejeune, NC. ACO modification to transfor authority to oicc camp lejeune
$0
Original award
$41,167,978
Show all 35
Quick answers
Who was awarded contract N4008512C7714?
N4008512C7714 was awarded to Flatiron Dragados Usa, Inc. by Naval Facilities Engineering Command (Department of the Navy) on April 3, 2012.
How much is contract N4008512C7714 worth?
The government has obligated $91,040,865 on N4008512C7714.
Was contract N4008512C7714 competed?
The extent of competition for N4008512C7714 was full and open competition. The government received 7 offers.