P851, FIRST NAVAL CONSTRUCTION DIVISION OPERATIONS CONTROL FACILITY, NAVAL AMPHIBIOUS BASE LITTLE CREEK, NORFOLK, VIRGINIA
Added: Jan 20, 2010 3:29 pm The purpose of this project is to construct a new First Naval Construction Division Headquarters Facility (1NCD). This facility will consolidate 151 personnel from various departments, which are currently located in building 3006 within the Little Creek Amphibious Base, Norfolk, Virginia. The construction of this facility will enhance the daily operations of the 1NCD by providing well configured, adequately sized work spaces capable of handling the computer and communications technology required while improving the quality of life in the workplace for existing personnel. In addition to this, the new facility will be in compliance with the Department of Defense AT/FP requirements. The two-story facility will provide efficiently configured command headquarters, administrative areas, a Sensitive Compartmented Intelligence Facility (SCIF), data processing areas, administrative storage space, support facilities, open work areas, mechanical, electrical, and communication! s spaces. The government desires the design to be of significant visual quality as this facility will contain office space for high ranking officers and be used to receive high profile visitors. Building 3006 will be demolished once the new First Naval Construction Division Headquarters Facility is complete as part of this project. The building will be supported by concrete foundation systems on spread footings and constructed of steel bar joists on structural steel with steel deck and a concrete topping slab. Exterior finishes will include brick veneer and ground face concrete masonry with split faced accents. The building will also be provide with aluminum windows, tinted low-e glass, a low sloped modified bitumen roof, and exterior building signage. The interior walls of the building shall be constructed of gypsum board on metal stud framing with finishes including painted gypsum board and vinyl and fabric wall covering. Floor finishes will be terrazzo, carpet, linoleum, and porcelain tile. Toilet facilities shall be provided with full height ceramic tile walls, phenolic partitions, ceramic tile floors, and gypsum board ceilings with moisture resistant paint. The Quarterdeck Lobby and Executive spaces will have upgraded finishes. Building systems will include, but not be limited to; DDC Controls, fire protection, heating, ventilation, air conditioning, plumbing, and electrical power and lighting. Building utility connections will include, but not be limited to; water, natural gas, sanitary sewer, electricity, telephone, and NMCI. Site improvement will include, but not be limited to; improving existing roads, paving for flag officer parking, site lighting, storm drainage, concrete sidewalks, final grading, and sod.
N4008510R3010 Department of the Navy Naval Facilities Engineering Command
Award Notice 1/2
1/20/10, 3:29 PM P851, DESIGN-BUILD FIRST NAVAL CONSTRUCTION DIVISION OPERATIONS CONTROL FACILITY, JOINT EXPEDITIONARY BASE LITTLE CREEK-FORT STORY
Added: Feb 18, 2010 2:22 pm This is not a request for either a quote or proposal, or an invitation for bid. The intent of this pre-solicitation synopsis is to identify potential offerors for P851, Design-Build First Naval Construction Division Operations Control Facility, Joint Expeditionary Base Little Creek - Fort Story, Norfolk, Virginia. The purpose of this project is to design and construct a new First Naval Construction Division Headquarters Facility (1NCD). This facility will consolidate 151 personnel from various departments, which are currently located in building 3006 within the Joint Expeditionary Base Little Creek - Fort Story, Norfolk, Virginia. The construction of this facility will enhance the daily operations of the 1NCD by providing well configured, adequately sized work spaces capable of handling the computer and communications technology required while improving the quality of life in the workplace for existing personnel. In addition to this, the new facility will be in compliance with the Department of Defense AT/FP requirements, the Master Plan for Joint Expeditionary Base Little Creek and the Installation Appearance Plan (IAP) Naval Amphibious Base Little Creek. The Two-story facility will provide efficiently configured command headquarters, administrative areas, a Sensitive Compartmented Intelligence Facility (SCIF), data processing areas, administrative storage space, support facilities, open work areas, mechanical, electrical, and communications spaces. The government desires the design to be of significant visual quality as this facility will contain office space for high ranking officers and be used to receive high profile visitors. Building 3006 will be demolished once the new First Naval Construction Division Headquarters Facility is complete as part of this project. (See extended description and additional information in Pre-Solicitation Synopsis attachment) The NAICS Code for this procurement is 236220 and the annual size standard is $33.5M. This procurement is a Total Small Business Set-Aside. The total estimated cost for this project is between $10,000,000 and $25,000,000.
N4008510R3010 Department of the Navy Naval Facilities Engineering Command
Award Notice 2/2
2/18/10, 2:22 PM