This is a firm-fixed-price definitive contract awarded by the Department of Homeland Security U.S. Coast Guard to Terry Contracting & Materials, Inc., doing business as Terry Contracting, a for-profit small business organization. The $356,474.67 contract is for the demolition of a sheetpile bulkhead at Sardet, Fishers Island, New York. Terry Contracting has experience as a prime contractor on various infrastructure and coastal projects for agencies like the U.S. Coast Guard and U.S. Air...
This is a definitive contract awarded by the U.S. Coast Guard, a civilian agency, to Terry Contracting & Materials, Inc., doing business as Terry Contracting, a for-profit small business organization. The contract is for $575,079.66 to dredge the boat basin at the U.S. Coast Guard Station on Fire Island in Babylon, New York. The contract is a firm fixed-price award and was designated as a total small business set-aside. Terry Contracting has previously provided dredging and marine...
The U.S. Coast Guard, an agency within the Department of Homeland Security, awarded a $516,280.20 Firm Fixed Price definitive contract to Terry Contracting & Materials, Inc. (doing business as Terry Contracting) for emergency maintenance dredging services at the U.S. Coast Guard Station Shinnecock in Hampton Bays, New York. This contract, which was set aside for small businesses, requires the completion of the dredging work by August 2, 2019. Terry Contracting is a for-profit small...
The Department of Homeland Security United States Coast Guard awarded a $1.66 million firm fixed price contract to Terry Contracting & Materials, Inc. for major maintenance and repair of waterfront facilities at the USCG Station in Eatons Neck, New York. The contract is a 100% set-aside for small businesses and will involve replacing the south floating dock and guide piles, reconstructing the south bulkhead anchor system and return, rebuilding a riprap revetment, and installing new LED...
This contract was awarded by the Department of Homeland Security's U.S. Coast Guard to Terry Contracting & Materials, Inc., doing business as Terry Contracting, a small business prime contractor. The $223,538.00 firm fixed-price definitive contract is for the repair of ATON (Aids to Navigation) structures. The work will be performed in East Haven, Connecticut and includes critical infrastructure construction, maintenance, and repair services for Coast Guard facilities. Terry Contracting...
<p>This is a $1,101,360.00 firm fixed price definitive contract awarded by the United States Coast Guard (USCG) to Chesterfield Associates Inc. to repair the waterfront at USCG Station Montauk in Montauk, New York. The contract includes a base bid and two optional items, such as replacing a floating dock, repairing a fixed timber pier, and restoring a stone gabion bulkhead. The contract is set aside for small businesses and has a period of performance of 285 calendar days.</p>
The Department of Homeland Security United States Coast Guard awarded a $394,400 firm fixed price definitive contract to Terry Contracting & Materials, Inc., doing business as Terry Contracting, to dredge approximately 6,000 cubic yards of material from the entrance channel into the mooring basin of Coast Guard Station Eaton's Neck in Northport, New York. This project, valued at $394,400, responds to Solicitation Number 6642216 seeking proposals to dredge the specified channel by March 24,...
This definitive contract awarded by the U.S. Coast Guard to Terry Contracting & Materials, Inc. is valued at $1.8 million to dredge approximately 10,726 cubic yards of material from the boat basin and channel at Coast Guard Station Shinnecock in Hampton Bays, New York. In response to Solicitation PSN 9829703, the contractor will use mechanical dredging methods between October and December 2020 to dewater dredged materials onsite for disposal at a facility in Melville, New York. Funded by the...
This firm-fixed-price contract was awarded by the U.S. Coast Guard to Terry Contracting & Materials, Inc. for $2,201,962.30 to provide new home port facilities for the U.S. Coast Guard Cutter Eagle at City Pier in New London, Connecticut. The contract includes berthing upgrades such as installing timber piles, sea cushions, bollards, and security features, as well as dredging the existing berth. Two alternate bid items involve routing a sewer force main. This contract was designated as a...
This federal contract award, valued at $819,404.00, was issued by the U.S. Coast Guard, a civilian agency, to Terry Contracting & Materials, Inc., a small business prime contractor, for the repair and replacement of five Aids to Navigation (ATON) assets in the Long Island Sound area. The work includes providing all labor, materials, equipment, transportation, supervision, and disposal required for this project. This contract was set aside for small business concerns under NAICS code 237990 -...