OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
The Federal Highway Administration has awarded contract 69056725C000011 to MORENO & NELSON CONSTRUCTION CORP for the Walla Walla South and North – Umatilla Repairs 2020, Phase 1 project. The award, valued at $4,069,990.00, was issued on April 2, 2025, and is designated as a Total Small Business set-aside opportunity. The contract appears to involve road repair and infrastructure improvements in the Walla Walla and Umatilla regions, specifically focusing on transportation infrastructure rehabilitation for the 2020 fiscal year.
69056725C000011 Department of Transportation Federal Highway Administration
Award Notice 3/3
4/2/25, 2:48 PM OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
The Department of Transportation Federal Highway Administration is issuing a pre-solicitation notice for two repair projects located in the Umatilla National Forest in Oregon and Washington. The projects, OR FS ERFO 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North - Umatilla Repairs 2020, Phase 1, involve excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, and subexcavation work. Technical questions must be submitted by email, and the solicitation documents will be available during the winter of 2023-2024 on www.sam.gov.
This opportunity is set aside for small businesses and has an estimated price range of $2 million to $5 million. The project length is 0.67 miles, with a tentative completion date of Summer 2026. Prospective bidders are encouraged to view the project sites in fall 2019 due to anticipated snow conditions limiting access after December 1st.
69056724B000006 Department of Transportation Federal Highway Administration
Pre-Solicitation 1/3
11/2/23, 3:02 PM OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
The Federal Highway Administration (FHWA) is seeking a contractor to perform comprehensive road and bridge repair work in the Umatilla National Forest, spanning both Oregon and Washington, under two related Emergency Relief for Federally Owned (ERFO) projects designated as OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1). The solicitation, numbered 69056724B000006, requires extensive repairs to Forest Service Roads damaged by flooding in 2020, including roadway reconstruction, erosion control, culvert replacement, and stream bank stabilization. Key contract requirements include installing new aquatic organism passage structures, road surface reconditioning, aggregate surfacing, and implementing comprehensive erosion and sediment control measures. The evaluation will be based on bid pricing, with bids ranging from $4,069,990 to $14,877,505, and the Engineer's Estimate set at $7,496,000. Potential bidders had multiple opportunities to ask questions, with the final Q&A document dated January 10, 2025, and the bid opening extended to January 14, 2025.
The contract is designated as a total small business set-aside, targeting contractors in the Highway, Street, and Bridge Construction NAICS category (237310). Seven contractors submitted bids, with Nelson Construction submitting the lowest bid at $4,069,990. The project involves multiple repair sites across Umatilla, Union, and Columbia counties in Oregon and Washington, focusing on Forest Service Roads 3200, 3738, 4712, and 4713. Work will include detailed tasks such as mobilization, construction surveys, quality control, culvert installations (24-inch to 144-inch pipes), roadway excavation, aggregate surface reconditioning, timber pile installation, and various mitigation measures including log barriers, root wads, and bank stabilization. The place of performance is primarily within the Umatilla National Forest, with work expected to be completed in summer 2025. Specific project elements include repairing multiple bridge structures, replacing failed culverts, and reconstructing approximately 13 different road alignments across the region.
69056724B000006 Department of Transportation Federal Highway Administration
Solicitation 2/3
12/5/24, 8:50 PM