Definitive Contract 15BBNF26C00000008
- Not listed
- This is a firm fixed-price definitive contract awarded by the Department of Justice Bureau of Prisons Federal Medical Center Lexington to Overflow Service LLC, a Louisville, Kentucky-based minority-owned small disadvantaged business and 8(a) program participant. The contract, valued at $191,512.55, is for the replacement of the roof on the Mary Todd Housing Unit at the Federal Medical Center in Lexington, Kentucky. The contract has a completion date of July 31, 2023 and was set aside for...
- The Department of Justice Bureau of Prisons (DOJ-BOP) awarded a $242,000 firm fixed price contract to A To Z Roofing, owned by Mark W Braithwaite SR, for replacement and repair of roofs at staff housing areas at the Federal Correctional Complex in Lompoc, CA. The solicitation sought construction services to replace 14 roofs, along with provision of necessary materials, labor, equipment, and compliance with regulations. Work is to be completed within 65 days of the September 13, 2023 award...
- The Department of Justice Bureau of Prisons awarded a $322,019 firm fixed price contract to Advanced Design Contracting, LLC to replace approximately 10,000 square feet of roof on the E-Unit inmate housing building at the Federal Correctional Institution in Waseca, Minnesota. The solicitation sought proposals to replace the roof at the facility within 130 calendar days of the May 2020 notice to proceed. This was a 100% small business set-aside awarded under NAICS code 238160 for roof replacement...
- The U.S. Federal Bureau of Prisons (FBOP) awarded a $116,922.51 firm-fixed-price construction contract to Skyyguard Corp, a service-disabled veteran-owned small business, to replace the roof towers at the Federal Correctional Complex in Tucson, Arizona. The contract is set aside for small businesses. The work involves tearing off and replacing approximately 1,875 square feet of roofing on three towers, including installing a new Tremco roofing system with polyiso insulation, reinforcing...
- <p>The Department of Justice Bureau of Prisons awarded a Firm Fixed Price Definitive Contract to Damschroder Roofing, Inc., a self-certified small disadvantaged business, to provide all materials, labor, and equipment to replace roofs - Phase II at the Federal Correctional Institution (FCI) Elkton in Lisbon, Ohio. The contract has a potential value of $702,476.00 and a completion date of March 2, 2018. The contract was set aside for total small business.</p>
- This is a firm-fixed-price construction contract awarded by the U.S. Department of Justice Federal Bureau of Prisons (FBOP) to Infinity Construction Management LLC, a small disadvantaged business, to replace the 21,500 square foot roof on one building at the Federal Correctional Complex (FCC) in Yazoo City, Mississippi. The $321,679.49 contract has an ultimate completion date of April 27, 2026 and is set aside for small businesses. The project requires the contractor to provide all labor,...
- The Department of Justice Bureau of Prisons Mid-Atlantic Regional Office awarded a firm fixed price delivery order valued at $40,724.68 to Kzf-Ljb Joint Venture. The order, issued under TASK ORDER #5 PROJECT 23Z1AQ8, requires the prime contractor to provide architectural and engineering structural investigation services for the Federal Correctional Institution in Ashland, Kentucky. Performance will occur in Cincinnati, Ohio over a period of two months concluding in early October 2023. No set...
- The Federal Bureau of Prisons awarded a $4.25M firm fixed-price contract to Rycars Construction, LLC on May 15, 2024, for roof replacement at the Federal Correctional Complex in Pollock, Louisiana. This Total Small Business set-aside contract, funded through the BOP Field Acquisition Office, requires the contractor to replace approximately 209,394 square feet of roof with a new thermoplastic polyolefin single-ply reflective membrane, replace 140 existing roof strainers, and install approximately...
- This is a $4,329,620.00 firm-fixed-price construction contract awarded by the United States Penitentiary Marion, a facility of the Federal Bureau of Prisons (FBOP), to the small business joint venture AOD & RBT JV for the project to Replace SPC & FCI Roofs at the Federal Correctional Institution (FCI) located in Marion, Illinois. The contract involves removing and replacing the existing failing fully ballasted EPDM roof and standing seam metal roofing with a new reinforced TPO...
- This is a firm-fixed-price construction contract awarded by the Federal Bureau of Prisons (FBOP) to AOD & RBT JV, a small business joint venture, to replace the roofs on the Food Service and Unit B3 buildings at the Federal Correctional Institution (FCI) in Milan, Michigan. The contract has a ceiling value of $1,460,077.00 and a completion date of March 22, 2025. The project consists of replacing approximately 23,000 square feet of roofing and is set aside for small business contractors. The...
The Federal Bureau of Prisons awarded a $1.09 million firm fixed-price definitive contract to Mtnt Facility Solutions, LLC, an Alaska Native Corporation-owned small disadvantaged business certified in the SBA 8(a) Program, to replace approximately 42,500 square feet of storm-damaged roofing at the Federal Correctional Institution in Ashland, Kentucky. The project encompasses roof removal and replacement work on six buildings—the Education, Chapel, Recreation, A-Housing Unit, B-Housing Unit, and Administration/Food Service Buildings—with an ultimate completion date of November 15, 2026. This contract was set aside for total small business participation and is being funded through the Federal Bureau of Prisons' Facilities and Operations (FAO) program. Mtnt Facility Solutions, based in Anchorage, Alaska, brings relevant experience in federal facility infrastructure projects, including prior roof replacement work at Fort Raleigh National Historic Site and HVAC and facility repair services for multiple federal agencies including the Department of Defense, National Park Service, and Centers for Disease Control and Prevention. The contractor is responsible for providing all materials, labor, and equipment necessary to complete the project. Performance will take place in Summit, Kentucky, and the contractor must manage all subcontracting responsibilities, with workers subject to the Federal Bureau of Prisons' security clearance requirements, which can extend the timeline by 60 days or more.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Replace Roof Storm Damage FCI Ashland | 15BFA025B00000040 | Department of Justice Bureau of Prisons Field Acquisition Office | Solicitation 3/4 | 7/14/25, 12:26 PM | |
Replace Roof Storm Damage FCI Ashland | 15B10225PR000131 | Department of Justice Bureau of Prisons Field Acquisition Office | Pre-Solicitation 1/4 | 5/19/25, 4:52 PM | |
Replace Roof Storm Damage FCI Ashland | 15BBNF26C00000008 | Department of Justice Bureau of Prisons Field Acquisition Office | Award Notice 4/4 | 10/30/25, 1:19 PM | |
Replace Roof Storm Damage FCI Ashland | 15BFA025B00000040 | Department of Justice Bureau of Prisons Field Acquisition Office | Pre-Solicitation 2/4 | 6/26/25, 3:49 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $1.1m | 10/30/25 |