The National Park Service Pacific West Region awarded a $1.3 million firm-fixed price contract to Orion Construction Inc. to design and construct a new large onsite sewage system at the Hurricane Ridge Visitor Center in Olympic National Park, Washington. Per the solicitation, the contractor will rehabilitate the existing septic system to meet current and future peak wastewater flow conditions in accordance with state regulations. The contract is set aside for small businesses under NAICS code...
The Department of the Interior National Park Service Pacific West Region awarded a $258,213.00 firm fixed-price purchase order contract to rehabilitate recreational vehicle (RV) dump stations at four campgrounds within Olympic National Park. The contract was set aside for small business participation and was awarded to Columbia Land Services Inc., a self-certified small disadvantaged business. The work will be performed in Port Angeles, Washington and is covered by prevailing wage determinations...
The National Park Service awarded a $1,391,127.65 firm fixed-price definitive contract to JMG Constructors LLC, a woman-owned small business, to rehabilitate the Hurricane Ridge Day Lodge in Olympic National Park, Port Andrews, Washington. The project involves improvements to the electrical, plumbing, fire detection, elevators, roof, windows, doors, walls, floors, and restrooms to comply with accessibility standards. This contract was set aside for small businesses and is expected to be...
This is a firm fixed price delivery order awarded by the Pacific West Region of the National Park Service to Facet NW, Inc., a self-certified small disadvantaged business, for $188,466.29. The contract is for architectural, engineering, and construction management services related to the OLYM-HURRICANE RIDGE WATER - TITLE II project, which appears to be a water infrastructure improvement initiative at a National Park Service site. This award is part of a larger $50 million Multiple Award Task...
The U.S. National Park Service (NPS) Pacific West Region awarded a $57,036.00 firm-fixed-price purchase order contract to 2 Grade, LLC, a small business located in Port Angeles, Washington. The contract is for the removal of all debris associated with the demolition of the Dosewallips campground and its seven structures within Olympic National Park. This work involves loading, hauling, and properly disposing or recycling the debris, which has been prepared by NPS day labor. The contract has a...
This is a $25,560.63 firm-fixed-price purchase order contract awarded by the National Park Service Pacific West Region to Dajani LLC, a minority-owned small disadvantaged business, for asbestos abatement and demolition services at the Heart O' the Hills Loop B Comfort Station in Olympic National Park, Washington. The contract, which is a total small business set-aside, requires the complete removal of asbestos, lead, mold, and other hazardous materials from the interior of the building, with all...
The Department of the Interior National Park Service Pacific West Region awarded a $70,679.84 firm fixed price delivery order contract to Dj&A, P.C. to conduct a Title I Scoping Trip, Condition Assessment, and Engineering Report to rehabilitate the wastewater lagoons at Olympic National Park in Missoula, Montana. As the managing agency for public lands and national parks, the National Park Service works to maintain and improve infrastructure supporting visitor experience and resource...
This contract was awarded by the Department of the Interior National Park Service Pacific West Region to Ridgeback Excavating LLC, a minority-owned, woman-owned small business, for the installation of a new waterline at Olympic National Park. The contract, valued at $179,905.26, is a firm-fixed-price definitive contract. It involves the replacement of approximately 2,300 linear feet of 2-inch galvanized pipe with 2-inch high-density polyethylene (HDPE) pipe, as well as the replacement of...
This is a Definitive Contract awarded by the National Park Service, Pacific West Region (NPS) to Rognlins, Inc. to supply and construct various elements to increase the capacity of the sanitary sewer treatment system within the Hoh Rainforest in Olympic National Park. The contract is a Firm Fixed Price award valued at $996,579.00 with a completion date of December 30, 2011. The contractor has 160 days to complete all work from the Notice to Proceed. This award does not utilize a set-aside...
The National Park Service Pacific West Region awarded a $4.46 million firm-fixed price contract to JMG Constructors LLC to rehabilitate the wastewater system at Log Cabin Resort in Olympic National Park, Washington. The scope of work involves replacing the extended aeration treatment system with a recirculating textile filter system, constructing a new subsurface drip disposal drain field, and rehabilitating the existing gravity sewage collection and conveyance system, as outlined in the...