Definitive Contract 140P4326C0028
- Not listed
- The National Park Service Northeast Region awarded a purchase order to Tanauan Global LLC for fire alarm and sprinkler system services at Boston National Historical Park under a Total Small Business set-aside. The order ceiling is $217,421.31, with an award date of September 19, 2024. Work is performed in Charlestown, Massachusetts. The contractor will provide quarterly and annual inspections, emergency and routine repairs, and maintenance to ensure fire protection systems remain compliant...
- The U.S. National Park Service (NPS) Northeast Region awarded a firm-fixed-price purchase order to Norel Service Co Inc., a small business subchapter S corporation, to provide commercial services for the maintenance and repair of 15 fire and sprinkler alarm systems at the Boston National Historical Park and Boston African American Historic Site in Boston, Massachusetts. The contract has a ceiling value of $104,027.55 and a period of performance from June 22, 2020 to January 24, 2025. This...
- The Department of the Interior National Park Service Northeast Region awarded a $2.57 million definitive contract to ACK Marine & General Contracting LLC for urgent repairs to Pier 1 at Boston National Historical Park on March 31, 2026, under a total small business set-aside. The awardee is a women-owned small business. The originating solicitation covers emergency construction services at the Charlestown Navy Yard, including repairs to concrete encased steel beams within three pier...
- The National Park Service Northeast Region awarded a purchase order to MW Guest Property Services for snow removal services at Boston National Historical Park, valued at $285,065, on December 31, 2025. The award carries a Total Small Business set-aside; the awardee holds SBA Certified Veteran-Owned Small Business and SBA Certified Service Disabled Veteran-Owned Small Business certifications. Work occurs at Charlestown, Massachusetts, with performance concentrated at Charlestown Navy Yard, Bunker...
- The National Park Service Northeast Region awarded a purchase order to L.J.V. Development, LLC, a Service-Disabled Veteran-Owned Small Business (and certified 8(a) Program Participant, EDWOSB, and WOSB), for $291,702.28 on June 20, 2025, with completion due June 19, 2028. The order is set-aside for SDVOSB and procures 24/7 preventative maintenance and repair services for plumbing, mechanical, and heating systems at Boston-area National Park Service facilities in Charlestown, Massachusetts,...
- This firm-fixed-price $39,882.00 contract was awarded by the Department of the Interior's National Park Service Northeast Region to Total Solution LLC, a self-certified small disadvantaged business and small business joint venture, to perform fire pump repair services at the Easton Building in Boston National Historical Park in Boston, Massachusetts. The contract was awarded under a total small business set-aside with a 14-calendar day performance period from August 18, 2025, to September 1,...
- The National Park Service Northeast Region awarded a $68.7K purchase order to Norel Service Co Inc., a small business based in Littleton, Massachusetts, for fire alarm and sprinkler system inspection, testing, maintenance, and repair services at Salem Maritime National Historic Site and Saugus Iron Works National Historic Site in Salem, Massachusetts. This modification exercises line items for option year two of the existing contract, with an ultimate completion date of July 31, 2026. The...
- The Department of the Interior National Park Service Northeast Region awarded a $867,441.22 firm fixed price construction contract to B L Mechanical Inc., a for-profit, veteran-owned small business located in Brockton, Massachusetts. The contract is to replace the Constitution Museum chiller, theater air handling units, chiller pumps, and hot water boiler at the Boston National Historical Park in Boston, Massachusetts. The period of performance is approximately 130 days. The contract was set...
- The National Park Service Northeast Region issued a purchase order to ATZ Solution LLC, a small disadvantaged business, on September 1, 2026 for electrical inspection and repair services at Boston National Historical Park with a ceiling value of $309,000 and an ultimate completion date of August 31, 2029. This is a total small business set-aside under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors). Work is performed in Charlestown, Massachusetts. The contract...
- The National Park Service issued a delivery order to Cornerstone Construction Services LLC on May 6, 2026, under the Great American Outdoors Act MATOC for additional bollard work and manhole repairs at Boston National Historical Park, with a ceiling value of $55,471. The order is set aside for Total Small Business and carries firm fixed pricing. Cornerstone is a Service-Disabled Veteran-Owned Small Business (SDVOSB) certified through October 15, 2027. Place of performance is Charlestown, MA...
The National Park Service Northeast Region awarded a $175,397 definitive contract to Tanauan Global LLC for fire sprinkler repairs at Boston National Historical Park on September 9, 2026, under a total small business set-aside. The originating solicitation, posted July 30, 2026, addresses fire sprinkler system deficiencies identified in a December 2025 inspection across ten buildings at the Charlestown Navy Yard site. Work includes replacement of 1,059 sprinkler heads, hydrostatic testing of piping systems at 150 psi, replacement of failed waterflow switches, installation of check valves and signage, and repair of control valves and supervisory alarm devices. All work must comply with NFPA 25 and NFPA 13 standards and applicable federal, state, and local regulations. The contractor must protect historic features and restore disturbed finishes to maintain structural integrity. Place of performance is Charlestown, MA. The contract employs firm fixed-price pricing with a base line item (Building 109) plus optional line items priced on a lump-sum basis. Work must commence within 14 calendar days of notice to proceed and complete within 120 calendar days, with delivery required by February 26, 2027. Ultimate completion date is April 30, 2027. Prevailing wage applies under Massachusetts Wage Determination MA20260001. Amendment 0003, posted August 27, removes Building 107 from scope.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
BOST 2026 FIRE SPRINKLER REPAIR | 140P4326R0031 | Department of the Interior National Park Service Northeast Region | Solicitation 1/1 | 7/30/26, 9:50 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $175.4k | 9/9/26 |