Solon Corporation

Tucson, AZ Doing business as Solon Paradise Valley 1 LLC

UEI
PZXAY4BHN3B6
CAGE
Not on record
Primary NAICS
Not on record
SAM.gov registration
Active through

Company facts

Self-certified in SAM.gov
  • For Profit Organization
Entity structure
Corporate Entity (Not Tax Exempt)
SAM.gov registration date
Physical address
3366 N Dodge Blvd, Tucson, AZ 85716, USA
Founded
2006
Employees
51-250
Estimated annual revenue
$10M-$50M
Industry
  1. Utilities
  2. Independent Power and Renewable Electricity Producers
  3. Renewable Electricity
  4. Renewable Energy
SIC code
49 Electric, Gas, & Sanitary Services
Profiles

Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .

Contract subawards

Prime contractor Prime award Amount Awarded
Sierra Lobo Inc. TEST EVALUATION SUPPORT TEAM 3 (TEST3) PVCS breaker installation 80JSC022DA003 $217,900
Sierra Lobo Inc. TEST EVALUATION SUPPORT TEAM 3 (TEST3) Design, installation and O&M activities for the additional safety & reliability features the WSTF Batteries system. 80JSC022DA003 $221,460
Sierra Lobo Inc. TEST EVALUATION SUPPORT TEAM 3 (TEST3) solar field batteries, construction, full service and installation 80JSC022DA003 $2,213,000

Similar vendors

About the company

Solon Corporation, doing business as Solon Paradise Valley 1 LLC, operates exclusively as a subcontractor to federal primes on energy-systems and battery-testing work for NASA, with no prime contract awards in its recent footprint.

Based in Tucson, Arizona, Solon is a for-profit corporate entity with a three-award subcontract history, all issued through TEST3 (Test Evaluation Support Team 3), a NASA Johnson Space Center program focused on power and energy systems. The vendor's entire footprint — $2.7 million combined obligated dollars across three sub-awards — reflects a single customer agency (NASA Johnson Space Center) and a narrow capability focus: solar field battery design, installation, operation and maintenance, and electrical safety infrastructure. Recent named work includes solar field batteries with full-service construction and installation (May 2022), design and installation of battery-system safety and reliability features at the White Sands Test Facility (December 2022), and PVCS breaker installation (February 2023). All three sub-awards carried 2022–2023 issue dates, with the most recent award now three years five months old; the source does not identify the prime contractor or parent vehicle for any of these sub-tasks. Activity volume has contracted — two awards in 2022 to one in 2023 — and the source does not surface recompete dates or anticipated pipeline. Given the recency gap and the absence of subsequent awards, the vendor's current federal footprint status is uncertain.

Quick answers

Is Solon Corporation registered in SAM.gov?

Yes. Solon Corporation's SAM.gov registration is active through February 23, 2027.

On GovTribe

See Solon Corporation's full federal record

  • Subcontracting relationships
  • Funding analysis by agency, NAICS and set-aside
  • Similar vendors