Rima Construction LLC

Beltsville, MD

UEI
YN74AA9CLCN6
CAGE
77H18
Primary NAICS
236210 Industrial Building Construction
SAM.gov registration
Active through

Company facts

Self-certified in SAM.gov
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Limited Liability Company
  • Hispanic American Owned
Entity structure
Corporate Entity (Not Tax Exempt)
NAICS codes registered in SAM.gov
Show all
SAM.gov registration date
Physical address
7802 Alloway Ln, Beltsville, MD 20705, USA

Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .

Recent federal awards

Rima Construction LLC's 5 most recent federal contract and grant awards, newest first. Amounts are dollars obligated.
Award Agency Obligated Awarded
C202120 renovation of building 10, rooms 10C422 and 10C422B for patient care use Contract · 75N99026F00002 NIH Construction $88,622
C202231 - building 6B laboratory renovation, rooms 2B231 and 2B231A Contract · 75N99026F00002 NIH Construction $173,445
M33725650 building 10 mice infestation remediation & security booth repair Contract · 75N99026F00001 NIH Construction $26,821
C201696 - construction services, solar field fire repairs, poolesville animal center Contract · 75N99026F00001 NIH Construction $48,540
Relocate steam line and replace hobart seal Contract · 75N98026F00002 Office of Logisitics and Acquisition Operations $26,191

About Rima Construction LLC

Rima Construction LLC, a minority-owned, Hispanic American-owned small disadvantaged business based in Beltsville, Maryland, provides construction, repair, and maintenance services to federal facilities as a prime contractor, operating exclusively under BPA calls and purchase orders with no subcontract footprint. The company is structured as a limited liability corporation and competes predominantly in full-and-open procurements rather than set-aside categories, though several awards carry Total Small Business designations.

Rima's capability portfolio centers on facility infrastructure work: lab renovations, mechanical and electrical system repairs and upgrades, utility infrastructure improvements including sanitary and steam piping, HVAC replacement, restroom and office refreshes, flood restoration, boiler replacement, and deferred facility operations and maintenance. Representative recent work includes a $26,191 BPA call from the National Institutes of Health in May 2026 for steam line relocation and Hobart seal replacement at NIH Bethesda; a $62,342 call for sanitary piping repair in Building 10 at NIH; a $184,200 call for roll-up door repairs and preventive maintenance at the NIH Integrated Research Facility in Fort Detrick; and a $199,238 call for design and construction to replace sanitary pipe infrastructure in Building 31B at NIH Bethesda.

Customer concentration is extreme. The National Institutes of Health Construction division accounts for 65 awards (93% of the 140 awards in the source) with a combined potential value of $32.5 million (96% of the $34 million portfolio). The Department of the Navy Bureau of Medicine and Surgery places 39 awards with $498 thousand combined potential value, followed by the Army Corps of Engineers (Humphreys Engineer Center Support Activity) with 3 awards and $445 thousand, and Naval Facilities Engineering Command with 14 awards and $185 thousand. The vendor serves twelve distinct customer agencies but operates almost exclusively through NIH.

Rima holds two primary BPA vehicles: a single-award master BPA with NIH Construction awarded April 27, 2022, with an April 25, 2029 completion date and $0 stated ceiling (the source notes approximately $300,000 in task orders issued through 2026); and a new multiple-award small business set-aside BPA with NIH Construction awarded July 1, 2026, with a $30 million ceiling and June 30, 2031 completion date. The top two vehicles in the source (BPA 75N99022A00006 and BPA 75N99020A00002, both Navy) carry 29 and 10 task orders respectively with combined potential values of $1.4 million and $482 thousand. Place of performance spans the NIH Bethesda campus and subordinate facilities including Fort Detrick.

Activity has been uneven. The vendor received 14 awards in 2022, 5 in 2023, 12 in 2024, 3 in 2025, and 2 in 2026 through the source date of mid-July. Only 2 awards face ultimate completion within the next twenty-four months with a combined potential value of $203 thousand, indicating minimal near-term recompete pressure. Work is categorized primarily under NAICS 236220 (Commercial and Institutional Building Construction) with 132 awards; PSC codes reflect hospital and miscellaneous building construction and repair, concentrated in construction of hospitals and infirmaries (24 awards) and repair or alteration of hospitals and infirmaries (21 awards).

Rima operates as a 100% prime contractor with no subcontract engagements in the source data. Obligated dollars total $3.9 million against a combined potential value of $34 million, indicating a 11% obligation rate typical of indefinite-delivery vehicles with extended performance windows. The vendor's recent alignment with the new $30 million NIH small business set-aside BPA signals institutional entrenchment in the NIH Construction procurement ecosystem, where it has accumulated approximately $300,000 in task orders since 2022 across lab renovations, mechanical upgrades, utility system work, and facility restoration.

Quick answers

What is Rima Construction LLC's UEI?

Rima Construction LLC's Unique Entity ID (UEI) in SAM.gov is YN74AA9CLCN6.

What is Rima Construction LLC's CAGE code?

Rima Construction LLC's CAGE code is 77H18.

What is Rima Construction LLC's primary NAICS code?

Rima Construction LLC's primary NAICS code is 236210 (Industrial Building Construction).

Where is Rima Construction LLC located?

Rima Construction LLC's physical address in SAM.gov is 7802 Alloway Ln, Beltsville, MD 20705, USA.

Is Rima Construction LLC registered in SAM.gov?

Yes. Rima Construction LLC's SAM.gov registration is active through June 3, 2027.

What is Rima Construction LLC's most recent federal award?

Rima Construction LLC's most recent federal contract award is C202120 renovation of building 10, rooms 10C422 and 10C422B for patient care use (75N99026F00002), from NIH Construction, on September 7, 2026.

On GovTribe

See Rima Construction LLC's full federal record

  • Federal contract awards
  • IDV awards
  • Funding analysis by agency, NAICS and set-aside
  • Similar vendors