FAR 36.601-3 Applicable contracting procedures
Subsection Federal Acquisition Regulation
Facts
- Citation
- FAR 36.601-3
- Type
- Subsection
- Last amended
- 89 FR 30212 Effective May 22, 2024
- Text as of
- FAC 2026-01
- Official text
- acquisition.gov
Text from acquisition.gov. Federal Register history from the Federal Register's records of the rules that amended this subsection.
Text
(a)
(1) For facility design contracts, the statement of work shall require that the architect-engineer specify, in the construction design specifications, use of the maximum practicable amount of recovered materials consistent with the performance requirements, availability, price reasonableness, and cost-effectiveness. Where appropriate, the statement of work also shall require the architect-engineer to consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable in developing the construction design specifications.
(2) Facility design solicitations and contracts that include the specification of energy-consuming products must comply with the requirements at subpart 23.107-3.
(b) Sources for contracts for architect-engineer services shall be selected in accordance with the procedures in this subpart rather than the solicitation or source selection procedures prescribed in parts 13, 14, and 15 of this regulation.
(c) When the contract statement of work includes both architect-engineer services and other services, the contracting officer shall follow the procedures in this subpart if the statement of work, substantially or to a dominant extent, specifies performance or approval by a registered or licensed architect or engineer. If the statement of work does not specify such performance or approval, the contracting officer shall follow the procedures in parts 13, 14, or 15.
(d) Other than "incidental services" as specified in the definition of architect-engineer services in 2.101 and in 36.601-4(a)(3), services that do not require performance by a registered or licensed architect or engineer, notwithstanding the fact that architect-engineers also may perform those services, should be acquired pursuant to parts 13, 14, and 15.
Federal Register history
Sections cited
- FAR 23.107-3 Energy-consuming products and water-consuming products
- FAR Part 13 Simplified Acquisition Procedures
- FAR Part 14 Sealed Bidding
- FAR Part 15 Contracting by Negotiation
- FAR 2.101 Definitions
- FAR 36.601-4(a)(3) Implementation
Quick answers
What is FAR 36.601-3?
FAR 36.601-3 is a subsection of the Federal Acquisition Regulation, titled "Applicable contracting procedures".
When was FAR 36.601-3 last changed?
The most recent final rule on record is "Federal Acquisition Regulation: Sustainable Procurement" (89 FR 30212), published Apr 22, 2024 and effective May 22, 2024.
Are changes to FAR 36.601-3 proposed?
No proposed rule from the last 3 years is waiting on a final rule.
On GovTribe
Follow the rules behind federal contracts
- Search Federal Register rules and proposed rules for the FAR, DFARS and agency supplements
- Solicitations, awards and government files in one search
- Ask GovTribe AI about the rules that apply to a contract