FAR 36.601-3 Applicable contracting procedures

Subsection Federal Acquisition Regulation

Facts

Citation
FAR 36.601-3
Type
Subsection
Last amended
89 FR 30212 Effective May 22, 2024
Text as of
FAC 2026-01
Official text
acquisition.gov

Text from acquisition.gov. Federal Register history from the Federal Register's records of the rules that amended this subsection.

Text

(a)

(1) For facility design contracts, the statement of work shall require that the architect-engineer specify, in the construction design specifications, use of the maximum practicable amount of recovered materials consistent with the performance requirements, availability, price reasonableness, and cost-effectiveness. Where appropriate, the statement of work also shall require the architect-engineer to consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable in developing the construction design specifications.

(2) Facility design solicitations and contracts that include the specification of energy-consuming products must comply with the requirements at subpart 23.107-3.

(b) Sources for contracts for architect-engineer services shall be selected in accordance with the procedures in this subpart rather than the solicitation or source selection procedures prescribed in parts 13, 14, and 15 of this regulation.

(c) When the contract statement of work includes both architect-engineer services and other services, the contracting officer shall follow the procedures in this subpart if the statement of work, substantially or to a dominant extent, specifies performance or approval by a registered or licensed architect or engineer. If the statement of work does not specify such performance or approval, the contracting officer shall follow the procedures in parts 13, 14, or 15.

(d) Other than "incidental services" as specified in the definition of architect-engineer services in 2.101 and in 36.601-4(a)(3), services that do not require performance by a registered or licensed architect or engineer, notwithstanding the fact that architect-engineers also may perform those services, should be acquired pursuant to parts 13, 14, and 15.

Federal Register history

Final rule Published Effective
Federal Acquisition Regulation: Sustainable Procurement 89 FR 30212 · FAC 2024-05
Federal Acquisition Regulation; FAR Case 2006-008, Implementation of Section 104 of the Energy Policy Act of 2005 72 FR 65868 · FAC 2005-22
Federal Acquisition Regulation; Definitions 66 FR 2117 · FAC 97-22

Sections cited

Quick answers

What is FAR 36.601-3?

FAR 36.601-3 is a subsection of the Federal Acquisition Regulation, titled "Applicable contracting procedures".

When was FAR 36.601-3 last changed?

The most recent final rule on record is "Federal Acquisition Regulation: Sustainable Procurement" (89 FR 30212), published Apr 22, 2024 and effective May 22, 2024.

Are changes to FAR 36.601-3 proposed?

No proposed rule from the last 3 years is waiting on a final rule.

On GovTribe

Follow the rules behind federal contracts

  • Search Federal Register rules and proposed rules for the FAR, DFARS and agency supplements
  • Solicitations, awards and government files in one search
  • Ask GovTribe AI about the rules that apply to a contract