FAR 31.205-25 Manufacturing and production engineering costs
Subsection Federal Acquisition Regulation
Facts
- Citation
- FAR 31.205-25
- Type
- Subsection
- Text as of
- FAC 2026-01
- Official text
- acquisition.gov
Text from acquisition.gov. Federal Register history from the Federal Register's records of the rules that amended this subsection.
Text
(a) The costs of manufacturing and production engineering effort as described in (1) through (4) of this paragraph are all allowable:
(1) Developing and deploying new or improved materials, systems, processes, methods, equipment, tools and techniques that are or are expected to be used in producing products or services;
(2) Developing and deploying pilot production lines;
(3) Improving current production functions, such as plant layout, production scheduling and control, methods and job analysis, equipment capabilities and capacities, inspection techniques, and tooling analysis (including tooling design and application improvements); and
(4) Material and manufacturing producibility analysis for production suitability and to optimize manufacturing processes, methods, and techniques.
(b) This cost principle does not cover-
(1) Basic and applied research effort (as defined in 31.205-18(a)) related to new technology, materials, systems, processes, methods, equipment, tools and techniques. Such technical effort is governed by 31.205-18, Independent research and development and bid and proposal costs; and
(2) Development effort for manufacturing or production materials, systems, processes, methods, equipment, tools, and techniques that are intended for sale is also governed by 31.205-18.
(c) Where manufacturing or production development costs are capitalized or required to be capitalized under the contractor’s capitalization policies, allowable cost will be determined in accordance with the requirements of 31.205-11, Depreciation.
Sections cited
- FAR 31.205-18(a) Independent research and development and bid and proposal costs
- FAR 31.205-11 Depreciation
Quick answers
What is FAR 31.205-25?
FAR 31.205-25 is a subsection of the Federal Acquisition Regulation, titled "Manufacturing and production engineering costs".
Are changes to FAR 31.205-25 proposed?
No proposed rule from the last 3 years is waiting on a final rule.
On GovTribe
Follow the rules behind federal contracts
- Search Federal Register rules and proposed rules for the FAR, DFARS and agency supplements
- Solicitations, awards and government files in one search
- Ask GovTribe AI about the rules that apply to a contract