FAR 22.1003-6 Repair distinguished from remanufacturing of equipment

Subsection Federal Acquisition Regulation

Facts

Citation
FAR 22.1003-6
Type
Subsection
Last amended
85 FR 27088 Effective Jun 5, 2020
Text as of
FAC 2026-01
Official text
acquisition.gov

Text from acquisition.gov. Federal Register history from the Federal Register's records of the rules that amended this subsection.

Text

(a) Contracts principally for remanufacturing of equipment which is so extensive as to be equivalent to manufacturing are subject to 41 U.S.C. chapter 65, rather than to the Service Contract Labor Standards statute. Remanufacturing shall be deemed to be manufacturing when the criteria in either paragraphs (a)(1) or (a)(2) of this section are met.

(1) Major overhaul of an item, piece of equipment, or material which is degraded or inoperable, and under which all of the following conditions exist:

(i) The item or equipment is required to be completely or substantially torn down into individual component parts.

(ii) Substantially all of the parts are reworked, rehabilitated, altered and/or replaced.

(iii) The parts are reassembled so as to furnish a totally rebuilt item or piece of equipment.

(iv) Manufacturing processes similar to those which were used in the manufacturing of the item or piece of equipment are utilized.

(v) The disassembled components, if usable (except for situations where the number of items or pieces of equipment involved are too few to make it practicable) are commingled with existing inventory and, as such, lose their identification with respect to a particular piece of equipment.

(vi) The items or equipment overhauled are restored to original life expectancy, or nearly so.

(vii) Such work is performed in a facility owned or operated by the contractor.

(2) Major modification of an item, piece of equipment, or material which is wholly or partially obsolete, and under which all of the following conditions exist:

(i) The item or equipment is required to be completely or substantially torn down.

(ii) Outmoded parts are replaced.

(iii) The item or equipment is rebuilt or reassembled.

(iv) The contract work results in the furnishing of a substantially modified item in a usable and serviceable condition.

(v) The work is performed in a facility owned or operated by the contractor.

(b) Remanufacturing does not include the repair of damaged or broken equipment which does not require a complete teardown, overhaul, and rebuild as described in subparagraphs(a)(1) and (a)(2) of this subsection, or the periodic and routine maintenance, preservation, care, adjustment, upkeep, or servicing of equipment to keep it in usable, serviceable, working order. Such contracts typically are billed on an hourly rate (labor plus materials and parts) basis. Any contract principally for this type of work is subject to the Service Contract Labor Standards statute. Examples of such work include the following:

(1) Repair of an automobile, truck, or other vehicle, construction equipment, tractor, crane, aerospace, air conditioning and refrigeration equipment, electric motors, and ground powered industrial or vehicular equipment.

(2) Repair of typewriters and other office equipment (but see 22.1003-4(c)(1) and (d)(1)(iv)).

(3) Repair of appliances, radios, television sets, calculators, and other electronic equipment.

(4) Inspecting, testing, calibration, painting, packaging, lubrication, tune-up, or replacement of internal parts of equipment listed in subparagraphs(b)(1), (b)(2), and (b)(3) of this subsection.

(5) Reupholstering, reconditioning, repair, and refinishing of furniture.

Federal Register history

Sections cited

Quick answers

What is FAR 22.1003-6?

FAR 22.1003-6 is a subsection of the Federal Acquisition Regulation, titled "Repair distinguished from remanufacturing of equipment".

When was FAR 22.1003-6 last changed?

The most recent final rule on record is "Federal Acquisition Regulation: Applicability of Inflation Adjustments of Acquisition-Related Thresholds" (85 FR 27088), published May 6, 2020 and effective Jun 5, 2020.

Are changes to FAR 22.1003-6 proposed?

No proposed rule from the last 3 years is waiting on a final rule.

On GovTribe

Follow the rules behind federal contracts

  • Search Federal Register rules and proposed rules for the FAR, DFARS and agency supplements
  • Solicitations, awards and government files in one search
  • Ask GovTribe AI about the rules that apply to a contract