DFARS 252.225-7044 Balance of Payments Program—Construction Material

Clause Defense Federal Acquisition Regulation Supplement Feb 2024 version

Facts

Citation
DFARS 252.225-7044
Type
Clause
Current version
February 2024
Prescribed in
DFARS 225.7503(a)
Alternates
Alternate I, Alternate II, Alternate III
Supplements
FAR Subpart 52.2 Text of Provisions and Clauses
Last amended
89 FR 11950 Effective Feb 15, 2024
Text as of
DFARS Change May 7, 2026
Official text
acquisition.gov

Text from acquisition.gov. Federal Register history from the Federal Register's records of the rules that amended this clause.

Text

Basic. As prescribed in 225.7503 (a) and (a)(1), use the following clause:

BALANCE OF PAYMENTS PROGRAM—CONSTRUCTION MATERIAL—BASIC (FEB 2024)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” in section 2.101 of the Federal Acquisition Regulation (FAR));

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both—

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029, unless an alternate percentage is established for a contract in accordance with FAR 25.201(c). Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of iron and steel not produced in the United States (excluding fasteners) as estimated in good faith by the contractor, constitutes less than 5 percent of the cost of all the components used in such construction material (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives). The cost of iron and steel not produced in the United States includes but is not limited to the cost of iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings, not produced in the United States, utilized in the manufacture of the end product and a good faith estimate of the cost of all iron or steel components not produced in the United States, excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components” in this clause.

“Component” means any article, material, or supply incorporated directly into construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

“Critical component” means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

“Critical item” means domestic construction material or a domestic end product that is deemed critical to the U.S. supply chain. The list of critical items is at FAR 25.105.

“Domestic construction material” means—

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

“Steel” means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. This clause implements the Balance of Payments Program by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except for—

(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation;

(2) Information technology that is a commercial product; or

(3) The construction material or components listed by the Government as follows:


[Contracting Officer to list applicable excepted materials or indicate “none”]

(End of clause)

Alternate I (Feb 2024)

Alternate I. As prescribed in 225.7503 (a) and (a)(2), use the following clause, which adds definitions for “South Caucasus/Central and South Asian (SC/CASA) state” and “SC/CASA state construction material” to paragraph (a), and uses “domestic construction material or SC/CASA state construction material” instead of “domestic construction material” in the second sentence of paragraph (b):

BALANCE OF PAYMENTS PROGRAM—CONSTRUCTION MATERIAL—ALTERNATE I (FEB 2024)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” in section 2.101 of the Federal Acquisition Regulation (FAR));

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both—

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029, unless an alternate percentage is established for a contract in accordance with FAR 25.201(c) . Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of iron and steel not produced in the United States (excluding fasteners) as estimated in good faith by the contractor, constitutes less than 5 percent of the cost of all the components used in such construction material (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives). The cost of iron and steel not produced in the United States includes but is not limited to the cost of iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings, not produced in the United States, utilized in the manufacture of the construction material and a good faith estimate of the cost of all iron or steel components not produced in the United States, excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components” in this clause.

(1) Is wholly the growth, product, or manufacture of an SC/CASA state; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in an SC/CASA state into a new and different construction material distinct from the material from which it was transformed.

“Component” means any article, material, or supply incorporated directly into construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

“Critical component” means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

“Critical item” means domestic construction material or a domestic end product that is deemed critical to the U.S. supply chain. The list of critical items is at FAR 25.105.

“Domestic construction material” means—

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

“South Caucasus/Central and South Asian (SC/CASA) state” means Armenia, Azerbaijan, Georgia, Kazakhstan, Kyrgyzstan, Pakistan, Tajikistan, Turkmenistan, or Uzbekistan.

“SC/CASA state construction material” means construction material that—

“Steel” means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. This clause implements the Balance of Payments Program by providing a preference for domestic construction material. The Contractor shall use only domestic construction material or SC/CASA state construction material in performing this contract, except for—

(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation;

(2) Information technology that is a commercial product; or

(3) The construction material or components listed by the Government as follows:


[Contracting Officer to list applicable excepted materials or indicate “none”].

(End of clause)

Alternate II (Feb 2024)

Alternate II. As prescribed in 225.7503(a) and (a)(3), use the following clause, which includes, in the definition of “domestic construction material” at paragraph (1)(ii)(A), the domestic content threshold that will apply to the entire contract period of performance:

BALANCE OF PAYMENTS PROGRAM—CONSTRUCTION MATERIAL—ALTERNATE II (FEB 2024)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” in section 2.101 of the Federal Acquisition Regulation (FAR));

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both—

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds, for the entire period of performance for a contract awarded in: calendar year 2023, 60 percent of the cost of all its components; calendar years 2024 through 2028, 65 percent of the cost of all its components; or calendar year 2029 or later, 75 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of iron and steel not produced in the United States (excluding fasteners) as estimated in good faith by the contractor, constitutes less than 5 percent of the cost of all the components used in such construction material (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives). The cost of iron and steel not produced in the United States includes but is not limited to the cost of iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings, not produced in the United States, utilized in the manufacture of the end product and a good faith estimate of the cost of all iron or steel components not produced in the United States, excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components” in this clause.

“Component” means any article, material, or supply incorporated directly into construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

“Critical component” means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

“Critical item” means domestic construction material or a domestic end product that is deemed critical to the U.S. supply chain. The list of critical items is at FAR 25.105.

“Domestic construction material” means—

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

“Steel” means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. This clause implements the Balance of Payments Program by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except for—

(1) Construction material valued at or below the simplified acquisition threshold in FAR part 2;

(2) Information technology that is a commercial product; or

(3) The construction material or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate “none”].

(End of clause)

Alternate III (Feb 2024)

Alternate III. As prescribed in 225.7503(a) and (a)(4), use the following clause, which includes, in the definition of “domestic construction material” at paragraph (1)(ii)(A), the domestic content threshold that will apply to the entire period of performance; adds definitions for “South Caucasus/Central and South Asian (SC/CASA) state” and “SC/CASA state construction material” to paragraph (a); and uses “domestic construction material or SC/CASA state construction material” instead of “domestic construction material” in the second sentence of paragraph (b):

BALANCE OF PAYMENTS PROGRAM—CONSTRUCTION MATERIAL—ALTERNATE III (FEB 2024)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” in section 2.101 of the Federal Acquisition Regulation (FAR));

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both—

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds, for the entire period of performance for a contract awarded in: calendar year 2023, 60 percent of the cost of all its components; calendar years 2024 through 2028, 65 percent of the cost of all its components; or calendar year 2029 or later, 75 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of iron and steel not produced in the United States (excluding fasteners) as estimated in good faith by the contractor, constitutes less than 5 percent of the cost of all the components used in such construction material (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives). The cost of iron and steel not produced in the United States includes but is not limited to the cost of iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings, not produced in the United States, utilized in the manufacture of the construction material and a good faith estimate of the cost of all iron or steel components not produced in the United States, excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components” in this clause.

(1) Is wholly the growth, product, or manufacture of an SC/CASA state; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in an SC/CASA state into a new and different construction material distinct from the material from which it was transformed.

“Component” means any article, material, or supply incorporated directly into construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

“Critical component” means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

“Critical item” means domestic construction material or a domestic end product that is deemed critical to the U.S. supply chain. The list of critical items is at FAR 25.105.

“Domestic construction material” means—

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

“South Caucasus/Central and South Asian (SC/CASA) state” means Armenia, Azerbaijan, Georgia, Kazakhstan, Kyrgyzstan, Pakistan, Tajikistan, Turkmenistan, or Uzbekistan.

“SC/CASA state construction material” means construction material that—

“Steel” means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. This clause implements the Balance of Payments Program by providing a preference for domestic construction material. The Contractor shall use only domestic construction material or SC/CASA state construction material in performing this contract, except for—

(1) Construction material valued at or below the simplified acquisition threshold in FAR part 2;

(2) Information technology that is a commercial product; or

(3) The construction material or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate “none”].

(End of clause)

Federal Register history

Final rule Published Effective
Defense Federal Acquisition Regulation Supplement: DFARS Buy American Act Requirements (DFARS Case 2022-D019) 89 FR 11950 · Docket DARS-2023-0024
Defense Federal Acquisition Regulation Supplement: Definition of “Commercial Item” (DFARS Case 2018-D066) 88 FR 6578 · Docket DARS-2022-0004
Defense Federal Acquisition Regulation Supplement: Maximizing the Use of American-Made Goods, Products, and Materials (DFARS Case 2019-D045) 87 FR 37440 · Docket DARS-2021-0012
Defense Federal Acquisition Regulation Supplement: Clauses With Alternates-Prescriptions and Clause Prefaces (DFARS Case 2015-D016) 80 FR 36898 · 0750-AI57
Defense Federal Acquisition Regulation Supplement: Clauses With Alternates-Foreign Acquisition (DFARS Case 2013-D005) 79 FR 65816 · 0750-AH94
Defense Federal Acquisition Regulation Supplement: Title 41 Positive Law Codification-Further Implementation (DFARS Case 2012-D003) 77 FR 35879 · 0750-AH55 Not on record
Defense Federal Acquisition Regulation Supplement; Foreign Participation in Acquisitions in Support of Operations in Afghanistan (DFARS Case 2009-D012) 75 FR 81915 · 0750-AG80
Defense Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption for Commercial Information Technology-Construction Material (DFARS Case 2009-D041) 75 FR 66686 · 0750-AG60
Defense Federal Acquisition Regulation Supplement; Statutory Waiver for Commercially Available Off-the-Shelf Items (DFARS Case 2008-D009) 74 FR 2422 · 0750-AG12
Defense Federal Acquisition Regulation Supplement; Geographic Use of the Term “United States” 70 FR 35543 · DFARS Case 2001-D003 Not on record
Defense Federal Acquisition Regulation Supplement; Free Trade Agreements-Australia and Morocco 70 FR 2361 · DFARS Case 2004-D013
Defense Federal Acquisition Regulation Supplement; Balance of Payments Program 67 FR 20693 · DFARS Case 2000-D020 Not on record
Show all 12

Quick answers

What is DFARS 252.225-7044?

DFARS 252.225-7044 is a clause of the Defense Federal Acquisition Regulation Supplement, titled "Balance of Payments Program—Construction Material".

What is the current version of DFARS 252.225-7044?

The current version is dated February 2024.

Where is DFARS 252.225-7044 prescribed?

It is prescribed in DFARS 225.7503(a), Contract clauses.

When was DFARS 252.225-7044 last changed?

The most recent final rule on record is "Defense Federal Acquisition Regulation Supplement: DFARS Buy American Act Requirements (DFARS Case 2022-D019)" (89 FR 11950), published Feb 15, 2024 and effective Feb 15, 2024.

Are changes to DFARS 252.225-7044 proposed?

No proposed rule from the last 3 years is waiting on a final rule.

On GovTribe

Follow the rules behind federal contracts

  • Search Federal Register rules and proposed rules for the FAR, DFARS and agency supplements
  • Solicitations, awards and government files in one search
  • Ask GovTribe AI about the rules that apply to a contract