174 $5,372,481,157 in federal obligations

Program facts

Also known as
Infrastructure For Rebuilding America
Assistance types
  • Project Grant
  • Block Grant
Treasury accounts
  • 69-0170-0-1-401
  • 69-8083-0-7-401
More information

Program details come from SAM.gov Assistance Listings. Updated . Grant award figures come from USAspending.gov.

About this program

The Department of Transportation is awarding competitive grants to support highway, freight rail, port, and intermodal projects of national or regional significance under the Nationally Significant Multimodal Freight and Highway Projects program (CFDA 20.934), with the most recent award dated June 29, 2026.

The program has distributed $5.37 billion in federal dollars across 174 awards since 1999, with funding activity accelerating in recent years—57 awards in 2025 and 39 in 2024, though only 9 awards so far in 2026. The awards fund construction, reconstruction, and rehabilitation of highway and freight infrastructure, bridge replacements and repairs, truck parking facilities with real-time information systems, intermodal terminal equipment and facility upgrades, and design-build and preliminary engineering phases for major capital projects. Representative recent awards include $120.1 million for the I-494 E-ZPass lanes and bridge work in Minnesota (June 2026), $136.4 million for the Hunts Point Terminal intermodal market redevelopment in New York (September 2025), $402.5 million for I-70 Floyd Hill Package 4 in Colorado (April 2025), and $1.089 billion for the Blatnik Bridge replacement between Duluth and Superior (November 2024). The portfolio is predominantly Project Grants (98 percent of 171 awards), with one Cooperative Agreement and two Block Grants making up the remainder.

Funding concentrates heavily in the Federal Highway Administration, which accounts for 151 awards and $4.85 billion of the federal dollars obligated. The Maritime Administration has funded 22 awards totaling $472.4 million, and the Federal Railroad Administration has made one award of $53.9 million. Combined federal and non-federal dollars obligated total $9.22 billion, indicating that recipients are contributing approximately $3.85 billion in matching funds. Award sizes vary widely, from under $1 million for preliminary engineering work to $1.089 billion for major bridge replacements; typical construction awards range from $10 million to $200 million.

The most recent grant opportunity, INFRA Grants (NSMFHP-25-26-INFRA), posted March 25, 2024, with a due date of May 6, 2024. That opportunity has closed; no current open solicitation is identified in the source. Eligible applicants include states, metropolitan planning organizations serving areas with populations exceeding 200,000, units of local government, special purpose districts with transportation functions including port authorities, tribal governments, and multi-jurisdictional public entities. Joint applications must designate a lead applicant and detail roles and responsibilities for each participant. The program requires large projects to begin construction within 18 months of obligation and funds planning, design, environmental review, and preliminary engineering phases when based on completed preliminary engineering results.

Objective and description

Objective

The Nationally Significant Multimodal Freight and Highway Projects (NSMFHP) program will provide Federal financial assistance to highway, freight rail, port, and intermodal projects of national or regional significance.

Description

The INFRA Grants program provides dedicated, discretionary funding for projects that address critical issues facing our nation's highways and bridges. INFRA grants will support the Administration's commitment to fixing our nation's crumbling infrastructure by creating opportunities for all levels of government and the private sector to fund infrastructure, using innovative approaches to improve the necessary processes for building significant projects, and increasing accountability for the projects that are built.

Eligibility

Applicant eligibility

Eligible applicants for NSFHP grants are 1) a State or group of States; 2) a metropolitan planning organization that serves an urbanized area (as defined by the Bureau of the Census) with a population of more than 200,000 individuals; 3) a unit of local government or group of local governments; 4) a political subdivision of a State or local government; 5) a special purpose district or public authority with a transportation function, including a port authority; 6) a Federal land management agency that applies jointly with a State or group of States; 7) a tribal government or a consortium of tribal governments; or 8) a multi-State or multijurisdictional group of public entities. Multiple States or jurisdictions that submit a joint application must identify a lead applicant as the primary point of contact. Each applicant in a joint application must be an Eligible Applicant. Joint applications must include a description of the roles and responsibilities of each applicant and must be signed by each applicant.

Beneficiary eligibility

Eligible applicants for NSFHP grants are 1) a State or group of States; 2) a metropolitan planning organization that serves an urbanized area (as defined by the Bureau of the Census) with a population of more than 200,000 individuals; 3) a unit of local government or group of local governments; 4) a political subdivision of a State or local government; 5) a special purpose district or public authority with a transportation function, including a port authority; 6) a Federal land management agency that applies jointly with a State or group of States; 7) a tribal government or a consortium of tribal governments; or 8) a multi-State or multijurisdictional group of public entities. Multiple States or jurisdictions that submit a joint application must identify a lead applicant as the primary point of contact. Each applicant in a joint application must be an Eligible Applicant. Joint applications must include a description of the roles and responsibilities of each applicant and must be signed by each applicant.

Uses of assistance

The Bipartisan Infrastructure Law authorizes the Nationally Significant Multimodal Freight and Highway Projects program at $8 billion for fiscal years FY 2022-FY2026, to be awarded by DOT on a competitive basis to projects of national or regional significance that meet statutory requirements. NSMFHP grants may be used for the construction, reconstruction, rehabilitation, acquisition of property (including land related to the project and improvements to the land), environmental mitigation, construction contingencies, equipment acquisition, and operational improvements directly related to system performance. NSMFHP grants may also fund developmental phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering, design, and other preconstruction activities, provided the project meets statutory requirements including that they are based on the results of preliminary engineering. All large projects funded with NSMFHP grants must be reasonably expected to begin construction not later than 18 months after the date funds are obligated for the project. The Department will divide grants under the NSMFHP program into large and small projects. For large projects, the IIJA specifies that NSMFHP grants must be at least $25 million. For small projects, the grants must be at least $5 million. For both large and small projects, maximum NSMFHP awards may not exceed 60 percent of future eligible project costs. At least 15% of funding are reserved for small projects. Applicants are strongly encouraged to submit applications only for eligible award amounts. No more than 30% of funding per year may be used for grants to freight rail, water (including ports), or other freight intermodal projects that make significant improvements to freight movement on the National Highway Freight Network. Only the non-highway portion(s) of multimodal projects count toward the 30% maximum. Improving freight movement on the National Highway Freight Network may include shifting freight transportation to other modes, thereby reducing congestion and bottlenecks on the National Highway Freight Network. Grade crossing and grade separation projects do not count toward the 30% maximum for freight rail, port, and intermodal projects. The FAST Act directs at least 25 percent of the funds provided for NSFHP grants, are to be used for projects located in rural areas. If the Department does not receive enough qualified applications to fully award the 25 percent reserved for rural projects, the Department may use the excess funding for non-rural awards. DOT must consider geographic diversity among grant recipients, including the need for a balance in addressing the needs of urban and rural areas.

Length and time phasing of assistance

INFRA funding is available to be obligated for up to 3 years following the year of authorization. For FY22 Funding, the funding is available to be obligated until September 30, 2025.

How to apply

Preapplication coordination

For additional information, please contact Gustavo Serratos at gustavo.serratos@dot.gov.

Criteria for selecting proposals

The selection criteria are published in the Notice of Funding Opportunity.

Award procedure

The IIJA authorizes the NSMFHP program at $8 billion for fiscal years (FY) 2022-2026, to be awarded by DOT on a competitive basis to projects of national or regional significance that meet statutory requirements. NSMFHP grants may be used for the construction, reconstruction, rehabilitation, acquisition of property (including land related to the project and improvements to the land), environmental mitigation, construction contingencies, equipment acquisition, and operational improvements directly related to system performance. NSMFHP grants may also fund developmental phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering, design, and other preconstruction activities, provided the project meets statutory requirements including that they are based on the results of preliminary engineering. Large projects funded with NSMFHP grants must be reasonably expected to begin construction not later than 18 months after the date funds are obligated for the project.

Time to approval or disapproval

The competition timeline, including evaluation, selection, and notification, varies from 4-9 months.

Grant opportunities

Opportunity Status Posted Applications due
INFRA Grants NSMFHP-25-26-INFRA Closed
INFRA Grants NSMFHP-23-24-INFRA Closed
INFRA Grants NSMFHP-22-INFRA-22 Closed
INFRA Grants NSFHP-21-INFRA21 Closed
INFRA Grants NSFHP-19-INFRA19 Closed
INFRA Grants NSFHP-17-18-INFRA Closed

Grant awards

Award Recipient Federal obligations Awarded
I-494 e-zpass project (MSP airport to US 169) in bloomington & richfield 693JJ22640000Y465MNI494013 Minnesota Department Of Transportation $60,984,580
I-494 e-zpass project (MSP airport to US 169) in bloomington & richfield 693JJ22640000Y430MNI494013 Minnesota Department Of Transportation $9,698,086
Truck parking central florida corridor - eastbound volusia county site; parking facility; construction 693JJ22640000Y430FLD525041 State Of Florida Department Of Transportation $47,165,557
Truck parking central florida corridor - westbound volusia county site; parking facility; construction 693JJ22640000Y430FLD525040 State Of Florida Department Of Transportation $63,680,845
Truck parking central florida corridor-seminole county site; parking facility; construction 693JJ22640000Y430FLD525019 State Of Florida Department Of Transportation $9,560,090
I-5 truck parking information management system (tpims) 693JJ22640000Y462WA9999918 Washington ST Department Of Transportation $57,219
I-5: regional truck parking information management system 693JJ22640000Y462ORSA00874 Oregon Department Of Transportation $1,136,680
EW2A infra and mega create grant 693JJ22640000Y464ILIYCB611 Illinois Department Of Transportation $10,122,016
The project will acquire electric and hybrid cargo handling equipment at portmiami, including a total of… 693JF72540004 Miami-Dade County $25,661,034
The project will replace the 109YEAROLD single track wooden trestle SAN dieguito river railway bridge. The… 69A36526220050INFCA North County Transit District $53,893,206

Latest 10 of 174 listed here. See the rest on GovTribe.

Top recipients by federal obligations

10 of 55 recipients listed here. See the rest on GovTribe.

Federal obligations by fiscal year

Fiscal year Federal obligations
FY2026 $1,707,064,357
FY2025 $1,251,819,462
FY2024 $681,233,925
FY2023 $91,057,000
FY2022 $118,606,465
FY2021 $14,200,000
FY2020 $7,298,423
FY2019 $59,451,514
FY2018 $55,000,000
FY2017 $87,000,000

Quick answers

What is Assistance Listing 20.934?

Assistance Listing 20.934 is Nationally Significant Freight and Highway Projects, a federal grant program run by Immediate Office of the Secretary of Transportation (Department of Transportation).

What is the CFDA number for Nationally Significant Freight and Highway Projects?

Its CFDA number is 20.934: Assistance Listing numbers were called CFDA numbers before 2018.

How much funding has Assistance Listing 20.934 awarded?

174 grant awards under 20.934 have obligated $5,372,481,157 in federal funds to 55 recipients.

Who receives the most funding from 20.934?

The recipients obligated the most under Nationally Significant Freight and Highway Projects are Minnesota Department Of Transportation ($1,155,234,419), State Of Florida Department Of Transportation ($264,367,665) and Missouri Department Of Transportation ($254,579,712).

How much did 20.934 obligate in fiscal year 2025?

Grants under 20.934 obligated $1,251,819,462 in federal funds in fiscal year 2025.

Are there open grant opportunities under 20.934?

No opportunity listed under 20.934 is open now. The latest, INFRA Grants, was posted on March 25, 2024.

On GovTribe