The City of Sumner is seeking a contractor to execute the Wastewater Treatment Plant (WWTP) Biosolids Modernization Project (CIP 21-17), located in Pierce County, Washington. The procurement involves comprehensive upgrades to the solids handling and treatment processes, with a primary focus on installing a new indirect biosolids dryer system capable of processing 2,050 wet pounds of anaerobically digested sludge per hour. Key deliverables include expanding the Solids Handling Building, installing thermal fluid heaters, constructing a temporary haul truck loading bay, and making extensive modifications to existing treatment systems. The project requires a contractor to provide equipment supply, construction services, and post-construction services, with specific requirements including producing a final biosolids product with 92% total solids and meeting specific performance guarantees. Bid proposals are due on November 14, 2025, with an anticipated substantial completion timeline of 390 working days and physical completion within 430 working days. Bidders must submit a bid proposal deposit of at least 5% of the total bid amount and demonstrate prequalification and experience with similar municipal infrastructure projects.
The contract appears to be open to all qualified bidders without specific set-aside designations for disadvantaged enterprises. The estimated project cost ranges between $19,000,000 and $20,500,000, with a specific allocation of $4,903,000 for the Biosolids Drying System Equipment Supply, Construction Services, and Post Construction Services. The project will integrate with existing wastewater treatment infrastructure, requiring careful modifications to current systems including replacement of thickened primary sludge pumps, demolition of the dissolved air floatation thickener, installation of a new rotary drum thickener, and replacement of existing digested sludge pumps and polymer systems. The new system will be designed to operate with both natural gas and digester gas, with an expected design evaporation rate of 1,640 pounds per hour. The City of Sumner will evaluate bids based on the lowest responsive and responsible bidder, reserving the right to reject any or all proposals. The project is expected to achieve final acceptance by September 30, 2026, with the successful bidder responsible for installation supervision, commissioning, and providing warranties.
Opportunity text
This project will construct upgrades to the solids handling and solids treatment processes at the existing City of Sumner Wastewater Treatment Plant. These improvements will include construction of an expansion to the existing Solids Handling Building, to include the installation of the new indirect biosolids dryer, thermal fluid heaters, and all associated equipment encompassed in the biosolids dryer scope of supply. The Contractor shall be assigned the portions of the executed Contract titled Biosolids Modernization Project Biosolids Drying Equipment Procurement, for the following items as Specified in the Contract: Equipment Supply, Construction Services, and Post Construction Services. The executed Biosolids Drying Equipment Procurement Contract is attached to the City of Sumner Wastewater Treatment Plant Biosolids Modernization Contract Documents as Part IX. The project will also include construction of a temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures and processes will include: replacement of the existing thickened primary sludge pumps in the existing Scum Pump Building, demolition of the existing dissolved air floatation thickener and associated equipment in Equipment Building 2 and the installation of a new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of the existing digested sludge pumps, replacement of the existing thickening and dewatering polymer systems and replacement of the existing air gap system in the existing Solids Handling Building. The existing dewatered sludge conveyance system will also be reconfigured including rehabilitation of the existing dewatered sludge storage hopper, modifications to existing conveyors (both temporary and permanent) and installation of new conveyors. Other project elements include the demolition of the existing waste gas burner and the installation of a new digester gas treatment system to include a hydrogen sulfide and moisture removal and digester gas compression, as well as the installation of a new enclosed waste gas flare. In addition, the existing submersible pumps in Plant Drain Pump Station No. 1 will be replaced and the walls of the existing centrate storage tank will be raised six feet. The internal recycle pumps and anoxic zone mixers in Aeration Basins 1 and 2 and the effluent UV disinfection system will also be replaced. The project will also include installation of new and modifications to existing electrical power distribution and control equipment to support the new improvements, including the installation of a new standby generator with subbase fuel tank in a sound attenuating enclosure. Finally, the project will include construction of a new hammerhead on State Street just outside the entrance to the plant and new security fencing and access gates. Please contact Courtney Littrell, Assistant Engineering Manager, at bids@sumnerwa.gov or (253) 299-5710.