WTP-Solids Dewatering Equipment Procurement
Cancelled State & local contract opportunity Posted
- Solicitation number
- VD-WTP-Solids-Dewatering-2021
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- Point of contact
-
- Leslie Rush lrush@dutil.com (706) 529-1119
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
City of Dalton Utilities is requesting sealed proposals for a water treatment plant solids dewatering equipment system, with proposals due August 31, 2021 at 5:00 p.m. Eastern time at the Dalton Utilities Administration Building, 1200 V.D. Parrott Jr. Parkway, Dalton, Georgia.
The system must deliver state-of-the-art dewatering equipment sized to produce a minimum of 1,000 dry pounds per hour solids throughput at a minimum feed flow rate of 100 GPM, with 95% minimum suspended solids recovery, a sludge cake concentration of 20–25%, and polymer use of 20–35 pounds per dry ton active solids. The manufacturer must provide a complete, factory-tested, fabricated, and assembled system delivered to the jobsite in proper operating condition. The manufacturer is responsible for on-site engineering support, operator training, and training manuals during commissioning.
Three copies of the proposal must be delivered to Leslie Rush at Dalton Utilities Administration Building; two additional copies must be delivered to Raymond Cordon at Barge Design Solutions, 6525 The Corners Parkway, Suite 450, Peachtree Corners, Georgia 30092. Proposals shall include the complete price for the system, including labor, equipment, and special materials. Installation is the responsibility of others. The time allotted for completion is May 15, 2023 per Appendix D of the RFP.
Opportunity text
Sealed Proposals will be received at the Dalton Utilities Administration Building, 1200 V.D. Parrott Jr. Parkway, Dalton, Georgia 30721 until 5:00 P.M. Eastern time August 31, 2021. Three copies of the Proposal shall be delivered to Leslie Rush at Dalton Utilities before the time specified. Two copies shall also be delivered to Raymond Cordon with Barge Design Solutions at 6525 The Corners Parkway, Suite 450, Peachtree Corners, Georgia, 30092. Scope of Work: The equipment to be provided (hereinafter referred to as "System") consists of furnishing state of the art dewatering equipment that is sized to produce a minimum solids through put of 1000 dry pounds per hour at a minimum feed flow rate of 100 GPM, with a 95% minimum suspended solids recovery and a sludge cake concentration of 20-25%, and a polymer use of 20-35 pounds per dry ton active. The Manufacturer shall be responsible for providing a complete System, as described herein, delivered to the jobsite, to be installed by others. All equipment specified herein, shall be factory tested, fabricated, assembled, erected and placed in proper operating condition in full conformity with drawings and specifications, engineering data, instructions, and recommendations of the equipment manufacturer. The manufacturer is responsible for providing on-site Engineering support, operator training, and training manuals during commissioning of the System. Time Allotted: May 15, 2023 per Appendix D of the RFP. Proposals: Proposals shall contain price for a complete System, described herein, including labor, equipment, and special materials necessary to complete the Work.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity