About this opportunity
The Town of Mendon, Vermont, located in Rutland County, is seeking bids from qualified contractors for the installation of a new dry hydrant system on Woodward Road. This invitation for bids procurement is designed to replace an existing ineffectual dry hydrant that cannot adequately supply water to the City of Rutland Fire Department's pumper truck. The project, designed by Troy Dare of Rural Fire Protection in coordination with state and local fire authorities, comprises two primary phases: excavation and removal of the current dry hydrant system, and excavation of approximately 120 feet of trench to bury an 8-inch Schedule 80 PVC pipe at depths matching the existing 40-foot sunken pipe in the pond. Required materials include 160 feet of 8-inch Schedule 80 PVC pipe, 40 feet of 6-inch Schedule 80 PVC pipe, various PVC couplings and reducers, one 8-inch horizontal strainer with backflush capability, one 55-gallon barrel with plugs, and a 6-inch female NH adapter with 90-degree elbow. The work must maintain road access during construction and comply with 2009 MUTCD traffic control standards. A mandatory site visit is scheduled for 10:00 a.m. on March 10, 2026, with Mendon Road Commissioner Chris Baird, and bids are due by March 18, 2026, with final project completion required by October 2, 2026.
The solicitation document does not specify any set-aside designations or restrictions limiting responses to particular categories of organizations, such as disadvantaged enterprises or minority-owned businesses. No incumbent vendors or current contractors are identified in the available documentation. The project will integrate with existing infrastructure, specifically the sunken 40-foot section of 8-inch Schedule 80 PVC pipe and water source in the pond, requiring contractors to coordinate their work with this established system. No specific award value or budget range is disclosed in the posted opportunity information, and interested bidders should contact the Town of Mendon for additional details regarding compensation structure and project specifications.
Opportunity text
Invitation for Bids Town of Mendon, VT TH#9 - Woodward Rd. Dry Hydrant Installation The Town of Mendon is seeking bids from qualified contractors for an installation of a new Dry Hydrant system. This project is located on Woodward Rd. The current Dry Hydrant on Woodward Rd. has been tested for outflow and determined to be ineffectual for the City of Rutland Fire Department to load their pumper truck. Therefore, in conjunction with Troy Dare from Rural Fire Protection, Zapata Courage from the State of Vermont, City of Rutland Fire Chief Bill Lovett, and the Town of Mendon, the decision has been made to remove the current dry hydrant system and replace it with a new design. The project has been designed by Troy Dare. The first phase of the project is the excavation and removal of the current dry hydrant system. The second phase of the project is the excavation of 120 ft. of trench to bury the 8 in. Schedule 80 PVC pipe at the same depth as the sunken 40 ft. of 8 in. Schedule 80 in the pond. This trench will be centered through the property to the pond, and inset on the property at a depth of 20 ft. Where the 6" Female NH Adapter w/ 90-degree extends out of the ground, the width of the pull in will be 25'. The road frontage at the entrance is 58'. The required materials of the project are as listed. 1 - 6" Female NH Adapter w/ 90-degree elbow 40' - 6" Schedule 80 PVC pipe 2 - 8" x 6" Schedule 40 PVC Reducer Bushing 1 - 8" Schedule 40 PVC 90-degree Elbow 160' - 8" Schedule 80 PVC pipe 8 - 8" PVC Coupling 1 - 8" Horizontal Strainer w/ Backflush 1 - 55gal. Barrel w/ Plugs Traffic Control must be in accordance with the 2009 MUTCD. The road must maintain access during construction. Bidder agrees to start work under this contract after the Notice to Proceed has been issued and that the Final Completion of the construction project is October 2nd, 2026. A mandatory site visit will be conducted at 10:00am on March 10th, 2026, with Mendon Road Commissioner, Chirs Baird. Please meet at the project location on Woodward Road parking in the pull off. If you are unable to attend this site visit, please contact Chris Baird at 802-770-2169. The lowest qualified bidder will be determined by the lowest bid price written in words and upon satisfactory review of qualifications and references. Please use the bid sheet included in the invitation to bid along with your supporting information that can be submitted with the bid sheet. Minority and women-owned businesses are encouraged to submit a bid. Three references are required with demonstrated experience with like projects. 2282 US Route Mendon, VT 05701 - Tel: 802.770.2169 - roads@mendonvt.gov The lowest qualified bidder will be determined by the lowest bid price written in words and upon satisfactory review of qualifications and references. Please use the bid sheet included in the invitation to bid along with your supporting information that can be submitted with the bid sheet. Minority and women-owned businesses are encouraged to submit a bid. Three references are required with demonstrated experience with like projects. 2282 US Route Mendon, VT 05701 - Tel: 802.770.2169 - roads@mendonvt.gov Bids from qualified contractors will be accepted until 12:00 pm on March 25th, 2026, at the Mendon Town Garage at 157 Park Lane, Mendon, VT 05701. Bids will be opened in the order received. Bids can be hand delivered, emailed or mailed to be received before the deadline.