Wood Valley Road WPCP Improvements

Closed State & local contract opportunity Posted

Solicitation number
PE-66925-NONST-2025-000000002
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Arlington, Georgia is seeking bids for the Wood Valley Road Water Pollution Control Plant (WPCP) Improvements project, a comprehensive infrastructure rehabilitation initiative located in Cobb County. The procurement involves restoring the Arlington WPCP to its permitted treatment capacity of 0.4 million gallons per day (MGD), with sealed bids to be electronically submitted through QuestCDN.com by June 6, 2025, at 2:00 PM. The project scope includes extensive replacements and repairs of critical infrastructure components, specifically two blower and MBBR tanks, two Astrasand filters, UV disinfection systems, electrical and control systems, small-diameter piping, and associated appurtenances. A pre-bid conference is scheduled for May 15, 2025, at 10:00 a.m., which will include an initial conference and site visit, though attendance is not mandatory. The total project completion time is set at 380 consecutive calendar days, with bidders required to provide a bid bond or certified cashier's check representing 10% of the base bid.

The contract is designated as a Section 3 Covered Contract, which explicitly encourages participation from Section 3 businesses and prioritizes employment and contract opportunities for low-income residents and local businesses. Bidders must comply with specific regulatory requirements, including the Georgia Security and Immigration Compliance Act and E-Verify participation. The project will be funded through grants from the Georgia Department of Community Affairs - Community Development Block Grant program, with additional federal financial assistance from the Department of Housing and Urban Development. Successful bidders will be required to provide performance and payment bonds, each equal to 100% of the contract price. While a specific award value is not disclosed, the comprehensive nature of the infrastructure improvements suggests a significant municipal investment. The City of Arlington reserves the right to reject any or all bids based on responsiveness, qualifications, or other established criteria, indicating a rigorous evaluation process for potential contractors.

Opportunity text

The project involves restoring the Arlington WPCP to its permitted treatment capacity of 0.4 million gallons per day (MGD). The work includes providing all necessary materials and labor to replace, repair, and rehabilitate two blower and MBBR tanks, two Astrasand filters, UV disinfection systems, electrical and control systems, and associated components. It also includes the replacement of small-diameter piping and supports, along with all other related appurtenances required to complete the project in accordance with the specifications and construction drawings. This is a Section 3 Covered Contract and Section 3 businesses are encouraged to apply. The project will be awarded as a single contract with a completion time of 380 days.

Files

File Type Posted
00100 _ Advertisement for Bids.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity