Window Replacements (Mt. Dora)
Open State & local contract opportunity Posted
- Solicitation number
- ITB-LD 185-2026
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Christian Vaquedano christianvaquedano@semtribe.com (954) 966-6300
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Seminole Tribe of Florida is soliciting bids under ITB-LD 185-2026 for window replacement at a Mt. Dora property, with bids due December 1, 2026. The solicitation was posted November 5, 2026, and lists Broward County as its jurisdiction.
The contractor must remove existing windows listed in the Exhibit A Schedule of Values and install PGT Impact Rated Windows in accordance with Orange County Notice of Acceptance and Florida Product Approvals, complying with the Seminole Tribe Building Code (Florida Building Code). Glass must be tinted Energy Efficient Glass Lite, with frames in white or bronze. The scope also includes a corresponding screen enclosure for each exterior window, repair and paint of compromised drywall and stucco as needed, and disposal of removed windows. A Pre-Bid Conference lets respondents take measurements at the locations.
The contractor supplies all labor, materials, equipment, and supervision, including equipment rentals and portable toilets. A qualified, English-speaking supervisor must be on the jobsite at all times. The contractor is solely responsible for restoring damage to areas outside the scope caused by the contractor, its employees, or its subcontractors. Work runs Monday through Friday, unless the Tribe determines otherwise. The Tribe is not responsible for lost, stolen, or damaged materials, equipment, or tools.
Opportunity text
1.1. WINDOW REMOVAL AND INSTALLATION: For all windows listed in Exhibit A Schedule of Values, CONTRACTOR shall: Remove existing windows and responsibly discard. Install PGT Impact Rated Windows. o Windows are to be installed as directed by Orange County Notice of Acceptance (NOA) and Florida Product Approvals along with the Seminole Tribe Building Code (Florida Building Code). All glass panes are Energy Efficient Glass Lite (tinted). Frame(s) color to equal default white or bronze. Install corresponding screen enclosures for each exterior window. Repair and patch compromised drywall and stucco area(s), as needed. Prime and paint repaired area(s), as needed (match to existing paint as best as possible). 1.2. ADDITIONAL CONTRACTOR RESPONSIBILITIES: CONTRACTOR shall supply all labor, materials, equipment, and supervision necessary for the total completion of the SOW (including but not limited to equipment rentals, portable toilets, etc.). CONTRACTOR shall be responsible for all necessary measurements as it relates to each door, window, and garage. o Prospective respondents will have the opportunity to take measurements at the location(s) during the Pre-Bid Conference. CONTRACTOR shall be always responsible for all personal materials and equipment during the duration of the project(s). The TRIBE is not responsible for lost, stolen, damaged materials and equipment, tools, and other supplies, and for any rental equipment. CONTRACTOR shall have a qualified, English-speaking supervisor on the jobsite at all times. CONTRACTOR shall protect other areas not in this Scope of Work from destruction, dirt, or damage. If such damage occurs, CONTRACTOR shall be solely responsible for the restoration of such damages as the result of CONTRACTOR or any employees or subcontractors of CONTRACTOR. CONTRACTOR shall perform all work according to code(s). CONTRACTOR shall perform work during the following operating hours, unless otherwise determined by the TRIBE: o Monday through Friday, excluding Tribal events, holidays, and advisory emergencies. o Normal business hours: 8:00 AM 5:00 PM (ET). CONTRACTOR shall place drop cloths, wall curtains, etc. to protect existing finishes, equipment, furniture, etc. CONTRACTOR must provide continual dumpster rotation or waste removal to ensure debris is disposed of in a timely manner. The dumpster shall not interfere with traffic and parking. CONTRACTOR shall clean up and responsibly remove all debris from the jobsite at the end of each workday and before final inspection of the completed job. CONTRACTOR shall contact the TRIBEs Housing Department for final inspection once the project is completed and prior to leaving the jobsite.
Files
| File | Type | Posted |
|---|---|---|
| seminole ITB-LD 185-2026.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity