Westport Branch Green Infrastructure Project (2023PW0090)
Closed State & local contract opportunity Posted
- Solicitation number
- IFB-IFB 001-2026-0-2026/BC
- State
- Missouri
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from network.demandstar.com. Updated .
About this opportunity
The Westport Branch Green Infrastructure Project (2023PW0090) is a comprehensive stormwater management procurement issued by Greene County, Missouri, focusing on three distinct project sites designed to enhance flood control and environmental sustainability. The project involves extensive site work at 2617 W Phelps St, including excavation to increase detention basin storage volume, installation of a grass paver maintenance path, concrete flow diversion structure, and modification of existing outlet structures. Additionally, two sites along W College Rd and W Chestnut Expressway will feature bioretention cells with underdrain systems, stormwater pipe replacement, pretreatment structures, retaining walls, and concrete flow diversion infrastructure. A significant component of the project includes planting approximately 35,000 native plant plugs across these locations. The procurement is partially financed by a $400,000 Environmental Protection Agency (EPA) 319 grant, with proposals due by August 7, 2025, following the initial posting on July 8, 2025.
While specific set-aside designations are not explicitly detailed in the provided documentation, the project's environmental focus and EPA funding suggest potential preferences for contractors with demonstrated expertise in green infrastructure, stormwater management, and native ecosystem restoration. The project's complexity requires bidders to possess advanced civil engineering capabilities, landscape design skills, and experience with municipal infrastructure improvements. Contractors should be prepared to integrate multiple technical components, including site grading, specialized concrete work, stormwater management systems, and large-scale native plant installation. The total project budget appears to exceed the EPA's $400,000 contribution, indicating potential additional funding from Greene County or other municipal sources. Interested contractors should carefully review the technical specifications and be prepared to demonstrate comprehensive environmental engineering and construction management capabilities to successfully execute this multi-site green infrastructure initiative.
Opportunity text
SCOPE: This project consists of three project sites. Site 1 is located at 2617 W Phelps St. Work includes excavation site work to increase the storage volume of an existing flood control detention basin onto neighboring City-owned property and create pools for planting native plants. Work also includes installation of a grass paver maintenance path, installation of a concrete flow diversion structure, and modification of the existing concrete outlet structure will be modified. Sites 2 and 3 are located on the north and south sides of W College Rd where it intersects W Chestnut Expressway. These two sites include the installation of bioretention cells with underdrain systems. Site 2 includes grading, stormwater pipe replacement underneath W Mill St and installation of a pretreatment structure. Site 3 includes installation of a retaining wall and a concrete flow diversion structure. All three sites include installation of articulated concrete block mat. The project includes the planting of approximately 35,000 native plant plugs. The project is partially financed with the Environmental Protection Agency (EPA) 319 money in the value of $400,000.