West Alabama St Paving and Drainage Improvements from Buffalo Speedway to Kirby Drive

Open State & local contract opportunity Posted

Solicitation number
N-T19200-0002-7(T-1920)
State
Texas
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Upper Kirby Redevelopment Authority (UKRA) is soliciting sealed bids for the West Alabama Street Paving and Drainage Improvements project from Buffalo Speedway to Kirby Drive in Houston, Texas, with bids due December 16, 2026 at 2:00 p.m. and a pre-bid meeting on December 2, 2026 at 10:00 a.m. Bidders must comply with the City of Houston Women/Small Business Enterprise (W/SBE) Program, making good faith efforts to award subcontracts and supply agreements to certified W/SBEs at a minimum of 4 percent Women-Owned Business Enterprise (WBE) and 12 percent Small Business Enterprise (SBE) of total contract value. Certified WBE or SBE contractors that self-perform may count that work toward a portion of these goals. The project also falls under the Pay or Play Program in Article II, Chapter 15 of the City of Houston Code of Ordinances, per Executive Order 1-7 and Ordinance 2007-0534.

The scope covers removal and replacement of deteriorated asphalt with 11-inch reinforced concrete pavement over an 8-inch lime-stabilized subgrade, plus 6-inch standard curbs, driveways, and sidewalks. Utility work includes new water lines and appurtenances, sanitary sewer and manhole replacement, cured-in-place-pipe sanitary sewer rehabilitation, and storm sewer replacement. Streetlights will move from wooden power poles to new metal poles, and aerial CenterPoint Energy and telecom lines will transfer to underground duct banks with hand holes and terminal poles. Traffic signals at Buffalo Speedway will be removed and replaced, and underground conduit at the Eastside intersection will be replaced. The project incorporates City of Houston Standard Construction Specifications. Work is in Harris County and the City of Houston.

Bid documents are available at www.civicastusa.com beginning October 23, 2026, at no charge. LAN is the design engineer, reachable at (517) 657-6176, and Ardurra is the construction manager, reachable at (713) 541-3530. UKRA reserves the right to reject any or all bids and will award to the most responsible bidder deemed most advantageous to UKRA and resulting in the best and most economical completion of the project. The project is identified as Project No. N-T19200-0002-7(T-1920).

Opportunity text

The construction plans for West Alabama Road Improvements from Buffalo Speedway to Kirby Drive (TIRZ #19) generally involves removal and replacement of deteriorated asphalt pavement, with 11-inch reinforced concrete pavement with an 8-inch lime stabilized subgrade and 6-inch standard curbs. Other surface improvements include replacement of driveways and sidewalks within project limits. For utility improvements, there will be installation of new water lines and related appurtenances, the removal and replacement of sanitary sewers and manholes, rehabilitation of sanitary sewers by cured-in-place-pipe, rehabilitation of sanitary sewer manholes, removal and replacement of storm sewers. New metal pole streetlights will replace the existing streetlights on wooden power poles, and the aerial lines on the CenterPoint Energy (CPE) and telecom poles will be transferred into proposed underground CPE and telecom duct banks including the addition of hand holes and terminal poles at specific locations. For traffic signals, the existing ones at Buffalo Speedway will be removed and replaced while the underground conduit will be replaced at the Eastside intersection.

Files

File Type Posted
51274728.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors