Well Site Electrical Systems Upgrade Project
Open State & local contract opportunity Posted
- Solicitation number
- CN2026-11
- State
- Washington
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Charlie Roberts croberts@poulsbo.gov
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City, in Kitsap County, Washington, is soliciting bids for the Well Site Electrical Systems Upgrade Project, with bids due December 2, 2026. The notice names no set-aside or preference program. The work requires instrumentation, controls, and programming at each well site using the City's preferred integrator, so bidders must work with that integrator.
Scope, which "shall consist of, but not be limited to," includes mobilization and demobilization across four well sites and electrical improvements with new variable frequency drives at each: a 60HP VFD at Lincoln Well #1, a 100HP VFD at Lincoln Well #2, a 40HP VFD at Big Valley #1, a 60HP VFD at Big Valley #2, and a 100HP VFD at the Westside Well site. The contractor must also relocate a generator from the Public Works Administration site to the Big Valley well site, construct a generator pad, and connect the unit. The project is furnished with all materials, equipment, tools, and labor.
The notice was posted November 6, 2026 in the Daily Journal of Commerce legal advertisement and is the only attached file.
Opportunity text
The project consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: Construction of the Well Site Electrical Systems Upgrade project which shall consist of, but not be limited to: 1. Mobilization and demobilization from 4 different well sites. 2. Electrical improvements at the Lincoln Well #1 site and installation of a 60HP VFD 3. Electrical improvements at the Lincoln Well #2 site and installation of a 100HP VFD 4. Electrical Improvements at the Big Valley #1 and Big Valley #2 well site and installation of a 40HP VFD for Big Valley #1 and installation of a 60 HP VFD for Big Valley #2 5. Moving a generator from its location at Public Works Admin to the Big Valley well site, constructing a generator pad, and connecting the generator. 6. Electrical improvements at the Westside Well site and installation of a 100HP VFD 7. Instrumentation, controls and programming at each well site utilizing the Citys preferred integrator.
Files
| File | Type | Posted |
|---|---|---|
| 454088.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity