The City of Waxahachie is soliciting bids for hydrogen sulfide (H2S) treatment improvements at Jefferson Lift Station, with proposals due October 8, 2026. The scope encompasses procurement and installation of a package bio-trickling filter H2S treatment tower with integrated fan, control panel, and water cabinet; fiber-reinforced plastic air piping and supports connecting the treatment unit to wet wells, splitter channels, and bar screen channel; yard piping for potable water and process drain connections; electrical work including connection to the existing MCC-101 electrical building, site lighting, and heat tracing; integration of instrumentation and controls with the existing SCADA system; replacement of existing grating with solid aluminum cover plates; and miscellaneous site improvements including sidewalk, fencing, and grading.

The specifications document (15 MB, posted September 15, 2026) establishes detailed technical standards for the bio-trickling filter system design and operational performance, FRP piping standards and installation procedures, electrical system connections and safety standards, SCADA integration protocols, and site improvement construction standards. The awardee must demonstrate capability to integrate the H2S treatment system with the existing SCADA infrastructure and comply with applicable codes and regulations governing wastewater treatment facility odor control.

The project is located at Jefferson Lift Station in Waxahachie, Ellis County, Texas. No contract value, evaluation criteria weighting, or incumbent information is provided in the source. Questions are due by October 8, 2026 unless the source specifies an earlier Q&A deadline.

Opportunity text

This project provides for: 1) Procurement and installation of one (1) package bio-trickling filter hydrogen sulfide (H2S) treatment tower. Package unit will also include one (1) each fan, control panel, and water cabinet. 2) Installation of fiber-reinforced plastic (FRP) air piping and supports to connect the H2S treatment unit to each wet well, splitter channel, and the bar screen channel at Jefferson Lift Station. Yard piping connections to the H2S treatment unit, to include small-diameter potable water and process drain connections as shown in the Drawings. 3) Electrical work, to include connection of the H2S treatment unit to the existing MCC-101 electrical building, site lighting, heat tracing, and other electrical work as defined in the Drawings and Specifications. 4) Integration of instrumentation & controls for the H2S treatment unit to the existing supervisory control and data acquisition (SCADA) system. 5) Replacement of existing grating at the lift station with solid aluminum cover plates. 6) Miscellaneous site improvements including sidewalk, fencing, and grading.