Water Well NO. 3 AT Water Plant NO. 2

Closed State & local contract opportunity Posted

Solicitation number
1331-069-00, Contract No. 1
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Montgomery County Municipal Utility District No. 99 is requesting bids on Water Well No. 3 at Water Plant No. 2, a groundwater well installation project, with bids due September 18, 2026 and a pre-bid teleconference on September 11, 2026 at 10:30 a.m. Local Time.

The scope encompasses a 1,200 GPM capacity well with lineshaft vertical turbine pump installation, pilot hole drilling, water quality sampling and testing, yard piping and chemical equipment installation with associated piping, electrical improvements and controls, site access pavement, constructed-facilities testing, and site cleanup and restoration. Contractors must comply with Texas tax exemptions for political subdivisions, provide completed TEC Form 1295 (Certificate of Interested Parties) prior to contract award, and certify non-boycott status regarding Israel, Sudan, Iran, foreign terrorist organizations, energy companies, and firearm entities pursuant to Texas Government Code provisions.

The contract allows 270 calendar days for completion following notice to proceed. Bidders must submit a certified or cashier's check or bid bond equal to 5% of the bid amount. The successful bidder must furnish performance and payment bonds each in the amount of 100% of the contract price from a Texas-licensed surety company. The owner retains 10% of progress payments until final completion and reserves the right to reject any or all bids and to waive informalities in the bidding process.

Questions must be submitted to the engineer no later than four business days before the bid opening. Bidding documents are available for viewing and download at www.CivcastUSA.com at no charge, with registration required. The public bid opening and reading will occur via teleconference on September 18, 2026 at 10:30 a.m. Local Time (dial-in: 605-313-5660, access code: 6184643).

Opportunity text

The project includes installation of a 1,200 GPM capacity groundwater well with a lineshaft vertical turbine pump, yard piping, chemical equipment, electrical controls and equipment, and access pavement. A. Installation of Pilot Hole. B. Water Quality Sampling and Testing. C. Installation of Water Well with Vertical line Shaft Turbine Pump. D. Installation of Chemical Equipment and Associated Piping. E. Installation of Yard Piping. F. Electrical Improvements. G. Site Access Pavement. H. Testing of Constructed Facilities. I. Site Clean Up and Restoration.

Files

File Type Posted
Contract Documents (3).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity