Water Treatment Plant Improvements Phase III and Ground Storage Tank Rehabilitaitons
Closed State & local contract opportunity Posted
- Solicitation number
- 2016-131-30 (62695 / 08R)
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Thomas Valle tvalle@kpaengineers.com (254) 773-3731
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Maverick County, Texas is requesting bids for water treatment plant improvements and ground storage tank rehabilitations with a proposal due date of September 22, 2026.
The scope spans two sites approximately a half mile apart: the City's Water Treatment Plant and a Ground Storage Tank facility. The base bid covers WTP Phase III work including furnish and installation of new filter effluent piping to enable abandonment of Clearwell No. 1 in the Filter Gallery basement, a new transfer pump station, microbiological testing sampling stations, a static mixer, and six manholes. Four separate alternates are available: Alternate 1 addresses exterior and interior rehabilitation of Ground Storage Tank 1 with two 75 HP vertical turbine pumps, 8-inch ductile iron discharge piping and fittings, microbiological testing sampling stations, temporary flush assemblies, and pressure testing of discharge piping. Alternate A covers exterior and interior rehabilitation of Ground Storage Tank 2. Alternate B includes furnish and installation of one 100 HP vertical turbine pump, 10- and 12-inch ductile iron discharge piping and fittings, a 12-inch by 10-inch ductile iron reducer, microbiological testing sampling stations, temporary flush assemblies, and pressure testing. Alternate C addresses demolition and removal of existing pumps, discharge piping, access hatches, vents, concrete pedestals, and electrical components.
The solicitation does not specify an estimated contract value, contract term, incumbent contractor, evaluation criteria weighting, or a pre-bid meeting or site-visit date. Questions due and anticipated award dates are not identified in the source material provided.
Opportunity text
Scope items are included at two separate locations, at the City's WTP and at the Ground Storage Tank. The sites are approximately a half mile apart. Base Bid WTP Phase IIIFurnish and Install New Filter Effluent Piping (to allow abandonment of Clearwell No. 1 in Basement of Filter Gallery); Furnish and Install New Transfer Pump Station; Furnish and Install Sampling Stations for Microbiological Testing; Furnish and Install Static Mixer and 6 Manhole; Add Alternate 1 GST Improvements Exterior and Interior Rehabilitation of Ground Storage Tank 1; Furnish and Install Two (2) 75 HP Vertical Turbine Pump; Furnish and Install 8 Ductile Iron Discharge Piping and Fittings; Furnish and Install Sampling Stations for Microbiological Testing; Furnish and Install Temporary Flush Assemblies; Pressure Testing Discharge Piping. Add Alternate A Exterior and Interior Rehabilitation of Ground Storage Tank 2; Add Alternate B Furnish and Install One (1) 100 HP Vertical Turbine Pump; Furnish and Install 10 & 12 Ductile Iron Discharge Piping and Fittings; Furnish and Install 12x10 Ductile Iron Reducer; Furnish and Install Sampling Stations for Microbiological Testing; Furnish and Install Temporary Flush Assemblies; Pressure Testing Discharge Piping. Add Alternate C Demolition and Removal of Existing Pumps, Discharge Piping, Access Hatches, Vents, Concrete Pedestals and Electrical Components;
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity