Water Treatment Plant Fencing
Open State & local contract opportunity Posted
- Solicitation number
- W2026-9578
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- George Hubert ghubert@firestoneco.gov
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Town of Firestone is soliciting sealed bids for furnishing and installing new fencing and gates, and removing and replacing existing fencing and gates, at its Firestone Water Treatment Facility in Weld County, Colorado. A pre-bid conference is held November 24, 2026 at 9:00 a.m. at the project location, questions are due December 4, 2026, and bids are due to the Town Clerk by 11:00 a.m. on December 18, 2026. The source names no set-aside, preference program, or local-vendor requirement.
Scope includes approximately 2,200 linear feet of 6-foot ornamental fencing (Ameristar Montage Classic 3-Rail, black), approximately 1,125 linear feet of 6-foot galvanized chain link with three strands of barbed wire, three 6-foot-high by 22-foot-wide full cantilever slide gates, and one 6-foot-high by 20-foot-wide double swing gate. The work also requires removing and relocating approximately 1,050 linear feet of existing chain link. The project begins with survey, plan preparation, and erosion and sediment control plan preparation, which the Town must accept before fence layout and installation proceed. An alternate covers electric slide gate operators with sensors and power supply. All work must follow the Town of Firestone Design Standards and Construction Specifications (2025 edition), manufacturer specifications, and the Colorado Keep Jobs in Colorado Act.
The contract is unit-price or lump-sum with a fixed price set at award. The Town retains 5% of invoice value until final acceptance and pays within 30 days of invoice submission. The contractor must furnish performance and labor and material payment bonds and commercial general liability insurance of $1 million per occurrence and $2 million general aggregate, naming the Town as additional insured. Liquidated damages are $250 per day for delays past the completion deadline, and the contractor warrants materials and work for two years after substantial completion. Either party may terminate with 30 days' written notice.
Specification documents are available on electronic request from George Hubert at ghubert@firestoneco.gov, and the Town will issue question responses by addendum by December 11, 2026.
Opportunity text
Furnishing and installation of new fencing/gates and removal & replacement of existing fencing/gates at the Northeast corner of Colorado Blvd and County Road 26 at the Town of Firestone, Firestone Water Treatment Facility. See Exhibit A for more information. Project will begin with survey, plan preparation and ESC plan preparation. Upon Town acceptance of documents, fencing location will be surveyed in and final location reviewed by Town Staff. Upon approval to proceed, all fencing relocation and installation will begin. Site will then be fully restored, and stormwater pollution prevention practices will be followed throughout the project.
Files
| File | Type | Posted |
|---|---|---|
| biddoc.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity