Water Main Rehab Package 5B
Open State & local contract opportunity Posted
- Solicitation number
- PW#2025-051
- State
- Washington
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Pamela Honma pamela.honma@seattle.gov (206) 733-9941
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Seattle, through Seattle Public Utilities and the Department of Finance and Administrative Services, is soliciting bids for Water Main Rehab Package 5B (PW#2025-051), with bids due November 18, 2026. Bidders must submit a Women and Minority Business Enterprise (WMBE) Inclusion Plan with the bid and earn a minimum of 10 points, or the bid will be deemed non-responsive and rejected. The project is a Covered Project subject to the City's Community Workforce Agreement (CWA) and Priority Hire program under Seattle Municipal Code 20.37, which provides construction work access to residents of economically distressed communities, women, and people of color.
The scope covers water main improvements at six Seattle sites: NW 55th Street (Phinney Ridge), W Raye Street (North Queen Anne), 43rd Avenue S (Mount Baker), S Graham Street (South Beacon Hill), 50th Avenue SW (Fauntleroy), and 50th Avenue SW spot improvements on private property. Work includes 6" to 12" ductile iron pipe, gate valves, a pressure reducing station, service and permanent connections, storm drain improvements, stormwater and erosion control, demolition, excavation dewatering, trench dams to prevent methane gas travel, contaminated and non-hazardous soil and water handling and disposal, and pavement restoration including ADA ramps.
The Engineer's Estimate is $5.6 million before sales tax. Bid guaranty is five percent of the total bid, including retail sales tax, and bids are submitted through the OpenGov platform. Responsible bidder requirements include Washington contractor registration, a UBI number, industrial insurance coverage, and prevailing wage training. Subcontractor identification and bonding requirements under RCW 39.30.060 apply to rebar, structural steel, HVAC, plumbing, and electrical work. The project is funded through the Water department budget.
Geotechnical reports for Sites 5B-1, 5B-2, 4, and 5 were posted October 23, 2026. The Site 5B-2 report recommends watertight sheet-pile shoring at the W Raye Street and 3rd Avenue W intersection, where artesian groundwater cannot be kept below excavation depth, and identifies liquefaction-induced settlement exceeding 9 inches in that area. The Site 5B-1 report recommends assuming groundwater near ground surface in the western half of the project area.
Opportunity text
Project Description:
This Project consists of the following elements of Work: Construction stormwater and erosion control; demolition; Water Main improvements including new 6" to 12" ductile iron pipe, gate valves, pressure reducing station and spot improvements; storm drain improvements; assist SPU with Water Main service connections and temporary and permanent Water Main connections; install and maintain excavation dewatering systems; install and maintain trench dams to prevent methane gas travel in trench excavation at Site 5B-3: 43rd Ave S; handling and disposal of contaminate/non-hazardous soil and water; and pavement restoration including ADA ramps.
This Project is a Covered Project subject to the City of Seattle's Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city's construction projects. It gives contractors access to these skilled workers.
Engineer's Estimate:
The Engineer's Estimate for this Project is $5,600,000 (before sales tax)
Project Location:
This Project is located at 6 different sites within the City of Seattle:
1) Site 5B-1: NW 55th St from 3rd Ave NW to Baker Ave NW in the Phinney Ridge Neighborhood,
2) Site 5B-2: W Raye St from 3rd Ave W to 4th Ave W in the N Queen Anne Neighborhood,
3) Site 5B-3: 43rd Ave S from S Genesee St to S Dakota St in the Mount Baker Neighborhood,
4) Site 5B-4: S Graham St from S Graham St to Swift Ave S in the S Beacon Hill Neighborhood,
5) Site 5B-5: 50th Ave SW from 50th Ave SW to SW 98th St in the Fauntleroy Neighborhood, and
6) Site 5B-6: 50th Ave SW Spot Improvements located on private property on Fauntleroy Way SW to 50th Ave SW.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity