Water Main Installation South Phase

Closed State & local contract opportunity Posted

Solicitation number
2526-34
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Gulf County is soliciting bids for water main installation in the South Phase project, with proposals due September 15, 2026. The scope covers approximately 31,984 linear feet of 12-inch PVC and HDPE potable water main installation in Gulf County, Florida, with all labor, equipment, and clearing and grubbing performed by the contractor. Gulf County will provide the materials.

Clearing and grubbing work includes removal of trees, stumps, roots, brush, structures, abandoned utilities, trash, and debris from the construction area, with precautionary measures to prevent damage to existing features. Clearing and grubbing operations must coordinate with temporary and permanent erosion and sedimentation control procedures as specified in the contract documents.

No estimated contract value, contract term, evaluation criteria, set-aside or preference program, pre-bid meeting date, or questions-due deadline is identified in the posting.

Opportunity text

This project includes the installation of approximately 31,984 LF of 12 PVC and HDPE potable water main in Gulf County, FL. The materials will be provided by Gulf County. Provide all labor, material and equipment to perform all clearing and grubbing as required to perform all the construction on the Drawings and as specified herein. Clearing and grubbing includes, but is not limited to, removing from the project site, trees, stumps, roots, brush, structures, abandoned utilities, trash, debris and all other materials found on or near the surface of the ground in the construction area and understood by generally accepted engineering practice not to be suitable for construction of the type contemplated. Precautionary measures that prevent damage to existing features to remain are part of the Work. Clearing and grubbing operations shall be coordinated with temporary and permanent erosion and sedimentation control procedures.

Files

File Type Posted
bi2526-34specs Water Main Installation South Phase.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity