Wastewater Treatment Plant Expansion to 0. 30 MGD Phase 2
Closed State & local contract opportunity Posted
- Solicitation number
- 21-018-201-WWTP1B
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Harris County is soliciting bids for Phase 2 of a wastewater treatment plant expansion, with proposals due October 1, 2026. The project expands the existing plant from 150,000 gallons per day to 300,000 gallons per day.
The scope includes construction and installation of one 52-foot by 12-foot by 13-foot 2-inch aeration basin, one 52-foot by 12-foot by 13-foot 2-inch digester basin, electrical modifications for expansion components, modifications to NPW system piping, and relocation of the electrical utility service drop.
Opportunity text
Work generally includes the expansion of the existing wastewater treatment plant from 150,000 gallons per day to 300,000 gallons per day, including but not limited to: Addition of one (1) 52-Foot x 12-Foot x 13-Foot 2-Inch aeration basin; Addition of one (1) 52-Foot x 12-Foot x 13-Foot 2-Inch digester basin; Modifications to electrical for expansion components; Modifications to the NPW system piping; Relocation of electrical utility service drop.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity